ML110030908
| ML110030908 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/03/2011 |
| From: | Lampert M Pilgrim Watch |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| Shared Package | |
| ML110030897 | List: |
| References | |
| RAS 19369, 50-293-LR, ASLBP 06-848-02-LR | |
| Download: ML110030908 (2) | |
Text
Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station),
Docket No. 50-293-LR, ASLBP No. 06-848-02-LR Remand Hearing on Contention 3-Hearing Exhibits Party Exh.
Witness/Panel and Date Description of Exhibit 1
Declaration Of Bruce A. Egan In Support Pilgrim Watchs Response Opposing Entergys Motion For Summary Disposition Of Pilgrim Watch Contention 3 2
Declaration Of Dr. Jan Beyea In Support Pilgrim Watchs Response Opposing Entergys Motion For Summary Disposition Of Pilgrim Watch Contention 3; and Excerpts From Report To The Massachusetts Attorney General On The Potential Consequences Of A Spent-Fuel-Pool Fire At The Pilgrim Or Vermont Yankee Nuclear Plant 3
Declaration Of David I. Chanin In Support Pilgrim Watchs Response Opposing Entergys Motion For Summary Disposition Of Pilgrim Watch Contention 3 4
MACCS2 Support Forum, David I Chanin; Development Of MACCS2: Lessons Learned, David I. Chanin 5
Declaration Of Richard Rothstein In Support Pilgrim Watchs Response Opposing Entergys Motion For Summary Disposition Of Pilgrim Watch Contention 3 6
Angevine, Modeling Of The Coastal Boundary Layer And Pollutant Transport In New England 7
Affidavit Of Joseph A. Jones and Dr. Nathan Bixler Concerning Entergys Motion For Summary Disposition Of Pilgrim Watch Contention 3, excerpts Dr. Bixler 8
Economic Consequences Of A Rad/Nuc Attack: Cleanup Standards Significantly Affect Cost, Barbara Reichmuth, Steve Short, Tom Wood, Fred Rutz, Debbie Swartz, Pacific Northwest National Laboratory, 2005 9
Survey Of Costs Arising From Potential Radionuclide Scattering Events, Robert Luna, Sandia National Laboratories, WM2008 Conference, February 24-28, 2008, Phoenix AZ 10 Jennifer E. Thorp, The Eastern Massachusetts Sea Breeze Study 11 Spengler and Keeler, Feasibility Of Exposure Assessment For The Pilgrim Nuclear Power Plant 12 Dr. Edwin Lyman, A Critique Of The Radiological Consequence Assessment Conducted In Support Of The Indian Point Severe Accident Mitigation Alternatives Analysis 13 Revised Chapter 4, Meteorological Monitoring, Of Guide DOE/EH-0173T 14 Kamiar Jamali, Use Of Risk Measures In Design And Licensing Of Future Reactors 15 Revisiting Goiana -1987 Radiological Accident in Goiania, Brazil
16 NUREG/CR-6853 Comparison of Average Transport and Dispersion Among a Gaussian, a Two-Dimensional, and a Three-Dimensional Model 17 Nathan Bixler, Proceedings of the Fourth International MACCS Users Group Meeting 18 Nathan Bixler, NRC Staff's Response in Opposition to State of New York's Motion for Partial Summary Disposition of NYS Contention 16/16A 19 NRC, Stephen La Vie Whats In The Black Box - Dispersion 20 NUREG/CR-6572, Rev.1 BNL-Nurag-52534-R1 - Kalinin PRA, Procedure Guides For Probabilistic Risk Assessment 21 DOE-EH-4.2.1.4-MACCS2-Code Guidance, MACCS2 Computer Code Application Guidance For Documented Safety Analysis Submitted by,
[Signed Electronically]
Mary Lampert Pilgrim Watch, pro se 148 Washington Street Duxbury, MA 02332 781-934-0389 Mary.lampert@comcast.net January 3, 2011