|
---|
Category:Legal-Exhibit
MONTHYEARML14112A0082014-04-15015 April 2014 Exhibit 7 - Request for Additional Information (Rai), April 15, 2014 ML14113A0012014-04-14014 April 2014 Exhibit 3 - Declaration of Victoria Clemons ML14112A0092014-02-19019 February 2014 Exhibit 1 - Preliminary Notice of Event or Occurrence, February 19, 2014 ML14112A0032014-02-15015 February 2014 Exhibit 2 - Toledo Blade Article, Davis-Besse Had Air Gap in Shield Building, February 15, 2014 ML14112A0042013-09-20020 September 2013 Exhibit 6 - Preliminary Notice of Event or Occurrence, September 20, 2013 ML14112A0062013-05-20020 May 2013 Exhibit 8 - Expert Witness Report of Arnold Gundersen, 50-246-LA ML12340A7292012-08-20020 August 2012 Official Exhibit - ENT000551-00-BD01 - Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 3 (May 2, 2011) ML1036200592010-12-28028 December 2010 2010/12/28-NREL: Dynamic Maps, Gis Data, and Analysis Tools - Solar Maps ML1036200352010-12-28028 December 2010 2010/12/28-GLWC Regional Transmission Wind Workgroup Workplan, January 2010-June 2011 ML1036200532010-12-28028 December 2010 2010/12/28-Exhibit 55-World PV Module Production (MW) - Data from PV News April of Each Year (1988 - 2009) ML1036200512010-12-28028 December 2010 2010/12/28-Exhibit 48-By 2050 Solar Power Could End U.S. Dependence on Foreign Oil and Slash Greenhouse Gas Emissions ML1036200782010-12-28028 December 2010 2009/05/31-The Eastern Massachusetts Sea Breeze Study ML1036200422010-12-28028 December 2010 2010/12/28-By 2050 Solar Power Could End U.S. Dependence on Foreign Oil and Slash Greenhouse Gas Emissions ML1036200412010-12-28028 December 2010 2010/12/28-GLWC Environmental Planning, Siting and Permitting Workgroup June 11, 2009 Breakout Session Summary ML1036200762010-12-28028 December 2010 2005/12/31-NUREG/CR-6572, Rev. 1, BNL-NUREG-52534-R1, Kalinin VVER-1000 Nuclear Power Station Unit 1, PRA, Procedure Guides for a Probabilistic Risk Assessment ML1036200362010-12-28028 December 2010 2010/12/28-GLWC Wind Atlas Workgroup Workplan, January 2010 - June 2011 ML1036200752010-12-28028 December 2010 2010/12/28-Ohio-Annual Average Wind Speed at 80 M ML1036200602010-12-28028 December 2010 2010/12/28-A Solar Grand Plan - by 2050 Solar Power Could End U.S. Dependence on Foreign Oil and Slash Greenhouse Gas Emissions ML1036200612010-12-28028 December 2010 2010/12/28-Production Cost Modeling for High Levels of Photovoltaics Penetration ML1036200622010-12-28028 December 2010 2010/12/28-Emissions from Photovoltaic Life Cycles ML1036200632010-12-28028 December 2010 2010/12/28-4928.64 Electric Distribution Utility to Provide Electricity from Alternative Energy Resources ML1036200642010-12-28028 December 2010 2010/12/28-NREL: Dynamic Maps, Gis Data, and Analysis Tools - Solar Maps ML1036200652010-12-28028 December 2010 2010/12/28-Greentechmedia Web Page ML1036200662010-12-28028 December 2010 2010/12/28-Ohio Senate Bill 221 Alternative Energy Portfolio Standard ML1036200672010-12-28028 December 2010 2010/12/28-Rooftop Photovoltaics Market Penetration Scenarios ML1036200692010-12-28028 December 2010 2010/12/28-Notes from Davis Besse Re-Licensing Community Hearing ML1036200702010-12-28028 December 2010 2010/12/28-Davis Besse Map, 50-Mile Radius ML1036200792010-12-28028 December 2010 2010/12/28-Use of Risk Measures in Design and Licensing of Future Reactors ML1036200332010-12-28028 December 2010 2010/12/23-Exhibit 36. Introductory Page About the Ohio Wind Working Group (Owwg) ML1036200302010-12-28028 December 2010 2010/12/28-Exhibit Wind Farm Development in the State of Ohio ML1036200812010-12-28028 December 2010 2010/12/28-Exhibit 17 - Licensed to Kill: How the Nuclear Power Industry Destroys Endangered Marine Wildlife and Ocean Habitat to Save Money ML1036200772010-12-28028 December 2010 2008/02/24-Survey of Costs Arising from Potential Radionuclide Scattering Events ML1036200022010-12-28028 December 2010 2010/12/28-Exhibit 12. Offshore Wind in the Atlantic. Growing Momentum for Jobs, Energy Independence, Clean Air, and Wildlife Protection ML1036200042010-12-28028 December 2010 2010/12/28-Exhibit 4. Ohio'S First Commercial Wind Farm ML1036200212010-12-28028 December 2010 2010/12/28-Wind Resource of Ohio, Mean Annual Wind Speed at 100 Meters ML1036200112010-12-28028 December 2010 2007/03/28-Exhibit 18. Chernobyl-Based Birds Avoid Radioactive Nests ML1036200802010-12-28028 December 2010 2005/04/28-Economic Consequences of Rad/Nuc Attack: Cleanup Standards Significantly Affect Cost ML1036200202010-12-28028 December 2010 2010/12/28-Wind Resource of Ohio Mean Annual Power Density at 100 Meters ML1036200152010-12-28028 December 2010 2010/12/28-Electric Power from Offshore Wind Via Synoptic-scale Interconnection ML1036104092010-12-27027 December 2010 2010/12/27-Energy Policy, Valuing the Greenhouse Gas Emissions from Nuclear Power: a Critical Survey ML1036200732010-12-27027 December 2010 2010/12/27-Exhibit 69-Ohio Lakes, Rivers and Water Resources ML1036200722010-12-27027 December 2010 2010/12/27-Exhibit 70-Cuyahoga Valley National Park (U.S. National Park Service) ML1036200502010-12-27027 December 2010 2010/12/27-Exhibit 57-Stephen O'Rourke - PV Status and Pathways ML1036200452010-12-26026 December 2010 2010/12/26-Bosman Delft Blauw Decorative Tile W/Stand (Delft Blue Handpainted Holland) at Djp ML1036200442010-12-26026 December 2010 2010/12/26-Windmill on Montmartre by Vincent Van Gogh ML1036200402010-12-26026 December 2010 2010/12/26-Governor Granholm Signs Executive Order Creating Great Lakes Wind Council ML1036204902010-12-24024 December 2010 2010/12/24-Exhibit 23 - European Countries Unite to Invest $40 Billion in Huge Off-Shore Renewable Energy Super-Grid ML1036104102010-12-24024 December 2010 2010/12/24-Ohio Wind Map and Resource Potential ML1036200192010-12-23023 December 2010 2010/12/23-US Energy Information Administration, Independent Statistics and Analysis ML1036104162010-12-23023 December 2010 2010/12/23-Photographer's Preface 2014-04-15
[Table view] |
Text
Ohio Senate Bill 221 Alternative Energy Portfolio Standard Alternative Energy 2025 R.P.S. In-State Renewable Energy Enforcement/
Technologies Benchmarks Requirements Credits Compliance Payments Renewable Renewable and Solar 1) Annual PUCO Review ORC 4928.01(A)(35) Benchmarks: 12.5% + ORC 4928.64(C)(1)
- Solar - Photovoltaic ORC 4928.64(B)(2)
- 2) If Not in Compliance:
- Solar - Thermal Y R S ORC 4928.64(C)(2)
- Wind 2009: .25% .004% At least 1/2 of renewable Utilities may use R.E.C.s 2010: .50% .010% A) Solar Benchmark
- Hydropower energy resources to be in any of the 5 calendar $ per Mw hour :
2011: 1.0% .030% implemented by the years following
- Certain Solid Waste 2012: 1.5% .060% 2009: $450 utilities shall be met acquisition to comply with
- Biomass 2013: 2.0% .090% 2010: $400 through facilities both the renewable and 2014: 2.5% .120% located in Ohio. solar energy resource 2012: $350
- Bio-Methane Gas 2015: 3.5% .150% requirements. 2014: $300
- Fuel Cells 2016: 4.5% .180% The remainder shall be 2016: $250
- Wind Turbines - Lake Erie 2017: 5.5% .220% met with resources that 1 R.E.C. shall equal 2018: $200 2018: 6.5% .260% can be shown to have been 1 Mw Hour of electricity 2020: $150
- Off Peak Storage Facilities 2019: 7.5% .300% delivered into this state. from renewable resources. 2022: $100 Utilizing Renewables 2020: 8.5% .340% ORC 4928.64(B)(3) ORC 4928.65 2024: $50
- Distributed Generation 2021: 9.5% .380%
Facilities Utilizing 2022: 10.5% .420% B) Renewable Benchmark Renewables 2023: 11.5% .460% 2009: $45 2024: 12.5% .500% Adjusted annually per CPI Advanced ORC 4928.01(A)(34)
Key A.E.P.S. Cost Containment Mechanisms
- Clean Coal 3% Cost Cap Force Majeure Provision
- Energy Ef"ciency Utilities not required to comply Utility may request PUCO to determine whether
- Fuel Cells with benchmark to the extent renewable resources are suf"ciently available to
- Co-gen Advanced Energy compliance will result in 3+% enforce R.P.S. benchmark requirement. If utility Requirement: 12.5% increase in electricity produc- shows good faith effort to comply with renewable
- Certain Solid Waste ORC 4928.64(B)(1) tion or acquisition costs. benchmarks but cannot, PUCO may reduce obligation.
Mercantile Sited ORC 4928.64(C)(3) Modi"cation does not automatically reduce future ORC 4928.01 (A)(1) benchmarks. ORC 4928.64(C)(4)
- Waste Heat Ef"ciency For more information contact:
- Demand/Load storage Terrence ODonnell 614.227.2345 todonnell@bricker.com
- Advanced/Renewable Kurt Tunnell 614.227.8837 ktunnell@bricker.com Brett Breitschwerdt 614.227.2301 bbreitschwerdt@bricker.com