ML103610288

From kanterella
Jump to navigation Jump to search
Modification No. 003 to Contract No. NRC-10-08-374
ML103610288
Person / Time
Issue date: 12/23/2010
From: Berkowitz D
NRC/ADM/DC
To:
References
NRC-10-08-374
Download: ML103610288 (3)


Text

IlBPA NO.

1. CONTRACT ID CODE

!PAGE OF AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1

1 P

O

2. AMENDMENTIMODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.

I 5. PROJECT NO.(If applicable)

M003 12-17-2010 ADM-11-095 6 ISSUED BY CODE 3100

7. ADMINISTERED BY (If other than Item 6)

CODE 13100 U.S.

Nucjiear Regulatory Commission U.S. Nuclear Regulatory Commission Div.

of Contracts Div. of Contracts Attn: Donna Berkowitz Mail Stop: TWB-01-BlOM Mail Stop: TWB-01-B26M Washington, DC 20555 Washington, DC 20555

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

IX) 9A. AMENDMENT OF SOLICITATION NO.

OTIS ELEVATOR COMPANY 9B. DATED (SEE ITEM 11) 10 FARM SPRINGS RD IDA. MODIFICATION OF CONTRACT/ORDER NO.

NRC-10-08-374 FARMINGTON CT 060322577 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE X

09-18-2008

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS 17 The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

[]is extended, 17 is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date soecified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

DUNS 001534676 NAICS: 238290 PSC: D399

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSIORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

W A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

(Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT:

Contractor 7-is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this modification is to revise Article C.7 to change the project officer and the alternate project officers.

NRC project officer:

Harry Cepura, email: harry.cepura@nrc.gov phone: 301-415-7830 Contractor POC: Paul Bloom, email: paul.bloomCaotis.com, phone: 301-324-4140, address: Otis Elevator Co., 1017 Brightseat RD, Landover 20785 Except as provided herein, all terms and conditions of the document referenced in Item 9A or IOA, as heretofore changed, remains unchanged and in full force and affect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Donna Berkowitz Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITEDATES OF AM "ICA 4/

16C. DATE SIGNED (Signature of person authorized to sign)

(Signature of C6ntracting Officer)

NSN 7540-01-152-8070 PREVIOUS EDITION NOT USABLE

~EMP~T~ ~ ~h7n4 STANDARD FORM 30 (REV. 10-83)

DE ~

~Prescribed by GSA - FAR (48 C

.243

NRC-10-08-374 M003 Effective with the date of this modification, Article C.7 is revised as follows:

C.7 2052.215-71 PROJECT OFFICER AUTHORITY (NOVEMBER 2006)

(a) The contracting officer's authorized representative hereinafter referred to as the project officer for this contract is:

Name:

Harry Cepura Address:

U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop: TWFN/6E39A 11545 Rockville Pike Rockville, MD 20852 E-mail:

harry.cepura@nrc.gov Telephone Number: 301-415-7830 Alternate Project Officer 1:

Name:

Gregory Chicca Address:

U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop: TWFN/6E34 11545 Rockville Pike Rockville, MD 20852 E-mail:

gregory.chicca@nrc.gov Telephone Number: 301-415-6928 Alternate Project Officer 2:

Name:

Richard Branch Address:

U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop: TWFN/6E26 11545 Rockville Pike Rockville, MD 20852 E-mail:

richard.branchdnrc.gov Telephone Number: 301-415-8389 Page 2

NRC-10-08-374 M003 (b) The project officer shall:

(1) Monitor contractor performance and recommend changes in requirements to the contracting officer.

(2) Inspect and accept products/services provided under the contract.

(3) Review all contractor invoices/vouchers requesting payment for products/services provided under the contract and make recommendations for approval, disapproval, or suspension.

(4) Immediately notify the Security Branch, Division of Facilities and Security (SB/DFS) (via e-mail) when a contractor employee no longer requires access authorization and return of any NRC issued badge to SB/DFS within three days after their termination.

(c) The project officer may not make changes to the express terms and conditions of this contract.

Page 3