ML103610263

From kanterella
Jump to navigation Jump to search
Modification No. 002 to Task Order No. 002 Under Order No. NRC-DR-38-10-700
ML103610263
Person / Time
Issue date: 12/22/2010
From: Mark Lohrmann
NRC/ADM/DC
To:
FPMI Solutions
References
NRC-DR-38-10-700
Download: ML103610263 (2)


Text

Ab AMENDMENT OF SOUCITATIONNMODIFICATION OF CONTRACT 1BPA No R 1 2O 1 URC-DR-38-l0-700 I 2 AMENDMENTKWIFICAITON NO. S. EFFECTIVEDATE 4 REQU1SfflONJRCH&aE REQ. NO. E PROJECT NO.(ffq*W)

M002 See Block 15C. HR-11-020 8/13/2010

e. iSSUlBY COOE 7. AONCSTraED BY (Ventoimtme) CODE)

U.S. Nuclear Regulatory Commission Division of Contracts Same as Item #6 Attn:Research, Resources & Grants Branch Mail Stop: TWB-01-B1Qm Washington DC 20555

9. NAMEANDADDREW OF CO#N C'OR (No., ,,nt el,,. S**t ,, ZIP Cods) SA.ANIPIDENT OFSoUC*T*Ao No.

FPMI SOLUTIONS, INC.

BE DATED(SEE IrEE11) 101 QUALITY CIR STE 110 10A.MODCICATION OF C0NTRCT)ORMR (NO.

GS15FO0070K NRC-T002 HUNTSVILLE AL 358064534 1O08DATED(SEEEIT 13) coDE 143339492 FAlILJ1YCODE X 03-01-2010

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS F7 The above numbered solicitation Is amended as set forth initem 14. The hour and date specified for receipt of Offers is extended, [] is not extended.

Offers must adcnowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the folowIng methods:

(a) By compiet Items 8 and 15, nd returning _ copies of the amendment (b) By acmowledgl receipt of this amendment on each copy of the offer submittd; or (C)By separate letter or telegram which includes a reerence to the sollcftatim' and amendment numbers. FAILURE OF YOUR AC-KNOVWEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amernment you desir to change an offer already submimed, such cuarge may be made by telegram or letter. provided each telegram or letter makes reference to the sollcltation and this amendment, and Is received prior to the opening hour and date specliled.

12.ACCOUNTN ANDAPPROPRIATON DATA (wftqMjt.) Not Applicable

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSIORDERS, IT MODIFIES THE CONTRACTIORDER NO. AS DESCRIBED IN ITEM 14.

(I A.THI CKANGEORDER IS SSUED PURSUAN'TO: (Specify wiftI TM CHANG SET FORTHIN "IMe14ARE MADEINTHECONTRACT 810A ORDER NO IN 1TE B TiE ABOVE NUMBERED CONTRACTIOI8DC IS MODIFIED TO REFLECT THEADWETRATIVE CHANGES (Mschas &aVinpsyft m. ap crm dMb,s)

SET FORTH IN ITEM14, PURSUANAT TOTHmAUTHORTY OF FAR 43.103(b),

C THIS SWPPLEMEWTAL AGRBEMS4T IS rNTERED INTOPURSUANT TO AUJTHORITY OF:

.Bilateral Mutual Agreement E. IMPORTANT: Contractor Il Is not, E Is required to sign this document and return 2 copies to the Issuft office.

14.DESCRUTOI OF AMENDMIENMODIFICAT"ION(04wtd *yUCF s fnAdkigs Indsddlg Idtm*et m* miv Iedf~e)

The purpose of this modification is to extend the period of performance to May 31, 2011 at no additional cost to the government, thereby increasing the period of performance from 12/31/2010 to 5/31/2011.

Period of Performance: 4/1/2010 - 5/31/2011 (changed)

Contract Ceiling : $55,707.00 (unchanged)

Amount Obligated: $55,707.00 (unchanged)

See page 2 for detailed changes Ex~t U pw~ldsd Itmuki.d Urn, a~ ~,ii5wu oft. UamwntinUmm~ At ftmnBAa IDA - hemMime dimoged.zun~u ,cmhied midInlutfwin mid .IYsd~

Cindy J. Bales, Director of Contracts I

NSN 544*1o52-0M STANARD FORM30 MEV160)

PR EVK SF.D t rn o N NOT USA BLE G SA- FARN Py s rled Iby (4 0FR )a , 0 ,

&W REVIW COMPLTE DEC2 2it

DR-38-10-700 T002 Modification: M002 Page 2 of 2 The purpose of this modification is to: 1) provide a no cost extension thereby extending the period of performance from December 31, 2010 to May 31, 2011, 2) the Price/Cost Schedule is deleted in its entirety and replaced with the following:

Task Order No. 2 April 1, 2010 through December31, 2010 EST. ESTIMATED TOTAL TASK 2 CLIN LABOR CATEGORY HOURS FIXED RATES LABQ Human Resources 001 Technician __...._--

... Sub Total (Labor) $38,307.20 Task Order No. 2 January 11 through ay 31,2011 EST. ESTIMATED TOTAL TASK 2 CLIN LABOR CATEGORY HOURS FIXED RATES LABOR Human Resources 001 Technician Sub Total TOTAL ESTIMATED AMOUNT (TASK ORDER 2) $55,707.80 All other terms and conditions remain the same.

Page 2