ML103570246

From kanterella
Jump to navigation Jump to search
Ltr. 12/23/10 LaSalle Request for Information and Notification of Inspection
ML103570246
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 12/23/2010
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
Download: ML103570246 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 December 23, 2010 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION UNIT 2 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Pacilio:

On February 22, 2011, the NRC will begin the Baseline Inservice Inspection (NRC Inspection Procedure (IP) 71111.08) at LaSalle County Station. This inspection is scheduled to be performed February 22 through 28, 2011.

Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. J of your organization. If there are any questions about this inspection or the material requested, please contact the inspector Mr. A.

Shaikh at (630) 829-9824.

M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-374 License No. NPF-18

Enclosure:

INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:

Distribution via ListServ

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 1

Inspection Dates:

February 22 - 28, 2011 Inspection Procedures:

IP 71111.08, Inservice Inspection (ISI) Activities Inspector:

Atif A. Shaikh (630) 829-9824, atif.shaikh@nrc.gov I.

ISI/Welding Programs and Schedule Information The following information (electronic copy - CD ROM if possible) is requested by January 21, 2011, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on-site to your staff.

We request that the specific items selected from the lists be available and ready for review on the first day of inspection. If you have any questions regarding this information, please call the inspector as soon as possible.

1.

A detailed schedule (including preliminary dates) of nondestructive examinations (NDEs) planned for Class 1 and 2 Systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage. For the examinations scheduled:

Identify which (if any) of these examinations are done to meet Section XI, IWX-2400.

Provide a copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations and docketed correspondence applicable to the examinations identified above.

2.

A copy of the NDE procedures used to perform the examinations identified in item 1 above (including calibration procedures and procedures that define the acceptance criteria applied to these examinations). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets).

3.

A schedule of welding activities with brief description (including work order numbers) that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs).

4.

A list of NDE reports (ultrasonic, radiography, magnetic particle, or dye penetrant),

which have identified recordable indications (geometric or flaw) on Code Class 1 and 2 Systems, since the beginning of the last refueling outage. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 2

5.

A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.

6.

If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.

7.

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.

8.

A list of any temporary non-code repairs or leaking safety-related pipe in service (e.g., pinhole leaks).

9.

Additional information related to all ISI activities.

A list with a brief description of ISI related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage.

For example, a list based upon data base searches using key words related to piping such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, or errors in piping.

II.

Information to be provided to the inspector at the entrance meeting:

1.

ISI/Welding Programs and Schedule Information.

a.

Updated schedules for ISI/NDE activities, including planned welding activities, and schedule showing contingency repair plans, if available.

b.

For ASME Class 1 and 2 welds selected by the inspector from the lists provided from Section I of this enclosure, please provide copies of the following documentation for each subject weld:

Weld data sheet (traveler);

Weld configuration and system location; Applicable Code Edition and Addenda for weldment; Applicable Code Edition and Addenda for welding procedures; Applicable weld procedures (WPS) used to fabricate the welds; Copies of procedure qualification records (PQRs) supporting the WPS;

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 3

Copies of the nonconformance reports for the selected welds. (If Applicable);

Radiographs of the selected welds and access to equipment to allow viewing radiographs. (If RT was performed.);

Copies of the pre-service examination records for the selected welds; Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS. (At least six months prior to date subject work.); and Copies of NDE personnel qualifications (VT, PT, UT, and RT). As applicable.

c.

For the ISI related corrective action issues selected by the inspector from Section I of this enclosure, provide a copy of the corrective actions and supporting documentation.

d.

For the NDE reports with recordable indications on Code Class 1 and 2 Systems selected by the inspector from Section A and above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.

e.

A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.

f.

Provide documentation that the ISI Program Manager has reviewed NDE personnel certification records for personnel performing NDE during the current refueling outage. Also, for each NDE UT examiner qualified to Appendix VII and VIII, of Section XI, provide the records (with dates) for the most recent completion of their practical hands on training.

2.

Codes and Standards.

Copies of the ASME Code Sections V, IX, and XI, with Editions applicable to the current inservice inspection program and the repair/replacement program. These copies are for the inspectors use for the duration of inspection and will be returned upon completion of this inspection.

If you have questions regarding any of the information requested, please contact the lead inspector.

M. Pacilio This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-374 License No. NPF-18

Enclosure:

INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:

Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalle RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\\DRSIII\\DRS\\WIP\\Ltr. 122310 LaSalle Unit 2 ISI RFI AAS.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII C RIII N RIII N

NAME AShaikh:ls DHills DATE 12/21/10 12/23/10 OFFICIAL RECORD COPY