Letter Sequence RAI |
|---|
|
|
MONTHYEAR1CAN041002, Fourth 10-Year Inservice Inspection Interval, Request for Alternative ANO1-R&R-013, Repairs to the Pressurizer Instrumentation Penetrations2010-04-0505 April 2010 Fourth 10-Year Inservice Inspection Interval, Request for Alternative ANO1-R&R-013, Repairs to the Pressurizer Instrumentation Penetrations Project stage: Request 1CAN041004, Supplemental Information to Fourth 10-Year Inservice Inspection Interval Request for Alternative ANO1-R&R-013 Repairs to Pressurizer Instrumentation Penetrations2010-04-12012 April 2010 Supplemental Information to Fourth 10-Year Inservice Inspection Interval Request for Alternative ANO1-R&R-013 Repairs to Pressurizer Instrumentation Penetrations Project stage: Supplement ML1010302132010-04-13013 April 2010 Acceptance Review Email, Relief Request ANO1-R&R-013, Proposed Alternative to Requirements Associated with Repair of Components Project stage: Acceptance Review ML1012604132010-05-13013 May 2010 Request for Withholding Information from Public Disclosure - Affidavit Executed by Gayle Elliott, Areva Np Inc. on April 9, 2010 Project stage: Withholding Request Acceptance ML1010406012010-05-13013 May 2010 Request for Withholding Information from Public Disclosure - Affidavit Executed by M. Taylor, Structural Integrity Associates on 4/9/2010 Project stage: Withholding Request Acceptance ML1032703482010-11-23023 November 2010 Responses to Branch Chiefs Questions, Arkansas Nuclear One, Unit 1 - E-mail Fourth 10-Year Inservice Inspection Interval, Request for Alternative ANO1-R&R-013, Repairs to Pressurizer Instrumentation Penetrations Project stage: Request ML1032703402010-11-23023 November 2010 Email Fourth 10-Year Inservice Inspection Interval, Request for Alternative ANO1-R&R-013, Repairs to Pressurizer Instrumentation Penetrations Project stage: Request ML1034807502010-12-14014 December 2010 Request for Additional Information Email Sent 10-13-2010, Request for Alternative ANO1-R&R-013, Fourth 10-Year Inservice Inspection Interval, Repairs to the Pressurizer Instrumentation Penetrations Project stage: RAI ML1034806822010-12-14014 December 2010 Request for Additional Information Email, Request for Alternative ANO1-R&R-013, Fourth 10-Year Inservice Inspection Interval, Repairs to the Pressurizer Instrumentation Penetrations Project stage: RAI ML1035703332011-01-0303 January 2011 Verbal Authorization of Request for Alternative ANO1-R&R-013 Project stage: Other 1CAN011101, Response to Request for Additional Information, Regarding the Request for Alternative ANO1-R&R-013, Repairs to the Pressurizer Instrumentation Penetrations2011-01-0606 January 2011 Response to Request for Additional Information, Regarding the Request for Alternative ANO1-R&R-013, Repairs to the Pressurizer Instrumentation Penetrations Project stage: Response to RAI ML1034301562011-01-10010 January 2011 Relief Request ANO1-R&R-013, Proposed Alternative to Requirements Associated with Repair of Components, for Duration of ANO-1 Spring 2010 Refueling Outage 1R22 Project stage: Approval 2010-04-05
[Table View] |
Text
From:
Kalyanam, Kaly Sent:
Tuesday, December 14, 2010 11:12 AM To:
CLARK, ROBERT W Cc:
Lent, Susan; Burkhardt, Janet
Subject:
RAI - Questions from the CPNB Branch CHief
- Bob, I am formalizing the Request for Additional Information sent on October 13, 2010, to Entergys Request for Alternative ANO1-R&R-013, Fourth 10-Year Inservice Inspection Interval, Repairs to the Pressurizer Instrumentation Penetrations.
Thanks.
N. Kalyanam PM, Arkansas Nuclear One, Unit 1 and 2 and Waterford 3.
The SUNSI information as follows:
Plant: Arkansas Nuclear One, Unit 1 Docket No.: 50-313
Subject:
RAI on Requests for Alternative ANO1-R&R-013 TAC Nos.: ME3701, SUNSI Review Done: Yes. Publicly Available, Normal Release, Non-sensitive, From: N. Kalyanam To: Robert Clark
- 1. On page 8, question no. 10, of the licensees letter of response to the staff RAI dated April 12, 2010, the licensee stated in part, These nine penetrations consist of seven penetrations that are one-inch (nominal pipe size) nozzles that are attached to the pressurizer with a partial penetration weld located at the inside surface of the pressurizer. The other two penetrations consist of a 1.5-inch diameter thermowell that is attached to the pressurizer with a partial penetration weld located at the inside surface of the pressurizer, and a smaller thermowell that was installed through a spare penetration that was originally a one-inch nozzle similar to the other seven discussed above. Please clarify the sentence underlined/bold. Is this the 10th nozzle?
Please explain.
- 2. Flaw evaluation document ANO-34Q-326, pages 4, 5, and.. talk about Self Similar Crack Growth assumption and indicates that this assumption is a conservative approach. Please describe underlying nature of Self Similar Growth and state why this assumption is considered conservative approach.
- 3. Was buttering applied/used between the J-groove attachment weld and the pressurizer carbon steel shell at the nozzle location?