2010 CLINTON POWER STATION IN ITlAL EXAM1 NATION PROPOSED EXAM FILES
Exelc Nuclear Clinton Power Station 8401 Power Road Clinton, IL 61727 U-603979 September 8, 201 0 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 0 Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of November 1, 2010 through November 12, 2010 at Clinton Power Station.
This submittal includes the Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
These examination materials have been developed in accordance with NUREG-1021, Operating Licensing Examination Standards, Revision 9 Supplement 1. Please note that reference materials are attached to each individual examination question or item.
Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG 1021, Operating Licensing Examination Standards, Revision 9 Supplement 1.
In accordance with NUREG-1021, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are complete.
Should you have any questions related to this information, please contact Mr. Steve Gackstetter at (21 7) 937-4000.
Respectfully,,
Site Vice President Clinton Power Station EET/blf SEP 1 6 2016)
I
U.S. Nuclear Regulatory Commission September 8, 201 0 Page 2 of 2 U-603979 Attachments: (Hand delivered to NRC Region Ill Chief Examiner)
RO Composite Examination with references attached, Control Room Systems and Facility Walk-Through Job Performance Measures with references attached, Administrative Topic Job Performance Measures with references attached, Integrated Plant Operation Scenario Guides, Completed Checklists:
Operating Test Quality Checklist (Form ES-301-3),
Simulator Scenario Quality Checklist (Form ES-301-4),
Transient and Event Checklist (Form ES-301-5).
Competencies Checklist (Form ES-301-6),
Written Exam Quality Checklist (Form 401-6),
Examination Security Agreement (Form ES-201-3)
Record of Rejected WAS (Form ES-401-4),
cc:
Chief, NRC Operator Licensing Branch (w/o attachments)
NRC Senior Resident Inspector - Clinton Power Station (w/o attachments)
SRRS: 3D.100, Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.
fl
-301 ec st orm
-301-3
~~
Facility: Clinton Date of Examination: 11/01/2010 Operating Test Number: 2010301
- 1. GENERAL CRITERIA
- a.
- b.
The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
There is no day-to-day repetition between this and other operating tests to be administered during this examination.
N R &
W R +
C.
- d.
The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.l.a).
Ov~rlap with the written examination and between different parts of the operating test is within acceDtable limits.
- e.
It appeats that the operating test will differentiate between competent and less-thancompetent aDDlicants at the desianated license level.
- 2. WALK-THROUGH CRITERIA I
I I
- a.
Each JPM includes the following, as applicable:
initial conditions inltiating cues 0
references and tools, including assoclated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include:
detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable R
- b.
Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
(scenario sets) have been reviewed in accordance
- a. Author
- b. Facility Reviewer c)
V-/4/-/0
- c. NRC Chief Examiner (#)
P/eI/o
- d. NRC Supervisor VOTE:
- The facility signature is not applicable for NRC-developed tests
- Independent NRC reviewer Initial Items in Column "c"; chief examiner concurrence is required.
a Facility: Clinton Date of Exam: 11/01/2010 Scenario Numbers: 1 I2 / SOperating Test Number: 2010301 QUMATlVE ATlRlBUTES
- 1.
The initial conditions are realistic, in that some equipment and/or inStNmentation may be out of service, but it does not cue the operators into expected events.
lnitlals a I b ' I c #
ES-301 Simulator Scenario Quality Checklist Form ES-301-4
- 2.
The scenarios consist mostly of related events.
- 3.
Each event description consists of 0
the point in the scenario when R is to be initlated the malfunction(s) that are entered to Initiate the event the symptomdcues that will be vislble to the crew the expected operator actions (by shift position) the event termination point (if applicable)
L IQ
~
- 4.
- 5.
- 6.
- 7.
No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible preceding Incident such as a seismic event.
The events are valid with regard to physics and thermodynamics.
Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenarlo objectives.
If time compression techniques are used, the scenario summary clearly so indicates.
Operators have sufficient time to cany out expected activities without undue time constraints.
4-Cues are given.
'//A B
R R
t4
~~
~~
~~
~~
~ _ _ _ _ _
- 8.
The slmulator modellng is not altered.
w
- 9.
The scenarios have been validated. Pursuant to 1 OCFR55,46(d), any own simulator R
IMIR I performance deficiencies or deviations from the referenced plant ha% been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
Every operator will be evaluated using at least one new or significantly modified scenario.
All other scenarios have been altered in accordance with Section D.5 of ES-301.
All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios).
Each applicant will be significantly involved in the minimum number of transients and events speclfied on Form ES-301-5 (submit the form with the simulator scenarios).
- 10.
- 11.
- 12.
v 9 d I
- 1.
Total malfunctions (5-8)
- 2.
Malfunctions after EOP entry (1-2)
~
- 3.
Abnormal events (2-4) 4 1 4 1 4
- 4.
M4or transients (1 -2) 1 1 1 1 1
- 5.
EOPs enteredkequiring substantive actions (1 -2) 1 / 1 / 1
- 6.
EOP contingencies requiring substantive actions (0-2) l / l / O
- 7.
Critical tasks (2-3) 2 1 4 1 3 ES-301, Page 25 of 27
ES-301 Competencies Checklist Form ES-301-6--
Facility: Clinton Date of Examination: 11/01/2010 Operating Test No.: 201 0301 Yotes:
- 1)
- 2)
Optional for an SRO-U.
(3)
Only applicable to SROs.
Includes Technical Specification compliance for an RO.
Instructions:
Check the applicant's license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
ES-301, Page 27 of 27
ES-401 Written Examination Quality Checklist Form ES-401-6 Facility: Clinton
~
~~
Date of Exam: 11/01/2010 Exam Level: RO SRO 0 Gp /z 4
M
- 1.
- 2.
Questions and answers are technically accurate and applicable to the facility.
- a. NRC WAS are referenced for all questions.
- b. Facility leamina obiectives are referenced as available.
me audit exam was X the audit exam was the SRO exam may exceed 60 percent if the randomly examination outline and is appropriate for the Tier to which they are assigned; deviations are justified
~
~
~p,(
- 10.
- 11.
Question psychometric quality and format meet me guidelines in ES Appendix B.
The exam contains the required number of one-point, multiple choice items; the total is correct and aarees with value on cover sheet
~~
Printed Name / Sianature Date
- a. Author
- b. Facility Reviewer r)
- c. NRC Chief Examiner (#)
- Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
ES-401, Page 29 of 33