Ltr. 11/10/2010 Palisades Re Notification of NRC Supplemental Inspection and Request for Information
ML103190569
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/10/2010
From: Richard Skokowski
Plant Support Branch II
To: Schwarz C
Entergy Nuclear Operations
References
EA-09-060
Download: ML103190569 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 10, 2010 EA-09-060 Mr. Christopher J. Schwarz Vice President, Operations Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

PALISADES NUCLEAR PLANT - NOTIFICATION OF NRC SUPPLEMENTAL INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Schwarz:

On November 23, 2010 and November 30, 2010, the Nuclear Regulatory Commission (NRC) will perform a supplemental inspection at the Palisades Nuclear Plant and Entergy Corporate Headquarters respectively. The inspection is being conducted to review and evaluate your completion of the required actions associated with the NRCs Confirmatory Order, EA-09-060.

In order to minimize the impact to your on-site resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for the inspection. The documents identified are those the inspectors will need upon arrival at the respective sites. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the inspection.

If you have any questions regarding our schedule or the material being requested, please contact Gregory Hansen at (630) 829-9610. He may also be reached electronically at gregory.hansen@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents

C. Schwarz Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20

Enclosure:

Supplemental Inspection Document Request cc w/encl: Distribution via ListServ

SUPPLEMENTAL INSPECTION DOCUMENT REQUEST Inspection Dates:

November 23, 2010 (Palisades Nuclear Plant)

November 30, 2010 (Entergy Corporate)

Inspection Procedure:

IP 92702, Follow-up on Corrective Actions for Violations and Deviations Inspector:

Gregory Hansen (630) 829-9610 Information Requested for the Inspection To assist the NRC inspector in conducting the supplemental inspection scheduled for the above dates, request the following information, in hard copy, be available at the entrance meetings on the respective inspection dates (November 23, 2010/November 30, 2010). The inspector understands some of the requested documents require special handling and will be available after the entrance meeting to ensure the appropriate protection and control of the documents.

If you have any questions regarding this information, please contact the inspectors as soon as possible.

A. Documents requested for the on-site inspection at Palisades Nuclear Plant are all documents associated with your implementation of a formal process, within the current Corrective Action Program (CAP), that ensures Safeguards and Security-Related information, which would otherwise not be contained in the CAP, is processed in an auditable manner, consistent with Entergys existing CAP (Action 2 of Confirmatory Order EA-09-060, dated November 10, 2009). The scope of the documents should include:

Entergy and Palisades Nuclear Plant procedures associated with the implementation of your Corrective Action Program.

All security related condition reports (CRs) and associated Corrective Action (CA) documents for the period from July 1, 2010 through November 22, 2010.

All CRs that required documentation of SGI, the CA documents associated with the CRs, and the uniquely identified and referenced safeguards documents associated with the CR(s) for the period from July 1, 2010 through November 22, 2010.

B. Documents requested for the on-site inspection at Entergy Corporate are all documents associated with your completion of the required actions as set forth in the NRCs Confirmatory Order EA-09-060, dated November 10, 2009. The scope of the documents should include:

Enclosure 1

Enclosure 2

Entergys publication to the Entergy fleet nuclear workforce, via Inside Entergy, of corrective actions set forth in Confirmatory Order EA-09-060, dated November 9, 2010.

Corporate procedures associated with the implementation of the Corrective Action Program (CAP) at Entergy nuclear power plants.

Corporate procedures associated with the protection and control of SGI.

Documentation of the completion of training by Entergy personnel with Safeguards access on the formal process, within the current Corrective Action Program (CAP), that ensures that Safeguards and Security-Related information, which would otherwise not be contained in the CAP, is processed in an auditable manner, consistent with Entergys existing CAP.

Documentation of the completion of training by Entergys nuclear workforce on the sensitivity and importance of providing complete and accurate information to the NRC, including copies of the training syllabus and course presentations.

Documentation of Entergy Nuclear Corporations assessment of its succession planning process with respect to how that process addresses unanticipated, short-term personnel losses in key positions, including any corrective actions developed and implemented, as appropriate.

Documentation of Entergy Nuclear Corporations completion of meetings with the Regional Administrators for the Regions I, III and IV in which Entergy shared and discussed the results of the safety culture workplace survey conducted at each Entergy nuclear plant, including copies of the presentations.

Documentation of the completion of a lessons-learned presentation to the Regional Utility Groups for the NRC Regions in which Entergy operates nuclear facilities, including copies of the presentations.

C. Schwarz Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20

Enclosure:

Supplemental Inspection Document Request cc w/encl: Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrPMPalisades RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak Shyrl Coker OE Mail Resource DOCUMENT NAME: PAL 111010 DRS CONFIRMATORY ORDER (EA-09-060) RFI OUO.DOCX Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME GHansen:co DFunk RSkokowski DATE 11/09/10 11/10/10 11/10/10 OFFICIAL RECORD COPY