Site: | Quad Cities |
Issue date: | 11/09/2010 |
From: | Muth M Exelon Nuclear |
To: | Harral Logaras NRC/RGN-III |
References | |
Download: ML103160153 (5) | |
Similar Documents at Quad Cities | |
---|---|
Category:Letter
MONTHYEARIR 05000254/20230042024-02-0505 February 2024
[Table view]Integrated Inspection Report 05000254/2023004 and 05000265/2023004 ML24004A0052024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval IR 05000254/20234032023-12-22022 December 2023 Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 IR 05000254/20230102023-12-20020 December 2023 Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23339A1762023-12-0505 December 2023 Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) ML23319A3342023-11-20020 November 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000254/20230032023-11-0909 November 2023 Integrated Inspection Report 05000254/2023003 and 05000265/2023003 RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23206A0382023-09-21021 September 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230112023-09-20020 September 2023 Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval SVP-23-038, Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities2023-08-14014 August 2023 Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities IR 05000254/20230022023-08-0808 August 2023 Integrated Inspection Report 05000254/2023002 and 05000265/2023002 ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI ML23216A0562023-08-0404 August 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 SVP-23-031, Regulatory Commitment Change Summary Report2023-07-14014 July 2023 Regulatory Commitment Change Summary Report ML23181A1062023-06-30030 June 2023 Postponement- Information Meeting (Open House) with a Question-And-Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23179A1932023-06-28028 June 2023 07122023 Letter-Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Plant for Performance for 2022 Calendar Year IR 05000254/20234012023-06-26026 June 2023 Cyber Security Inspection Report 05000254/2023401 and 05000265/2023401 IR 05000265/20230402023-06-22022 June 2023 Reissue Quad Cities Nuclear Power Station 95001 Supplemental Inspection Supplemental Report 05000265/2023040 and Follow Up Assessment Letter RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23167B1722023-06-16016 June 2023 95001 Supplemental Inspection Report 05000265/2023040 and Follow-Up Assessment Letter RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23144A3632023-05-26026 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23033A4042023-05-15015 May 2023 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application Letter IR 05000254/20234022023-05-15015 May 2023 Security Baseline and ISFSI Inspection Reports 05000254/2023402, 05000265/2023402, 07200053/2023401 ML23132A2022023-05-12012 May 2023 Annual Radiological Environmental Operating Report ML23125A0612023-05-0808 May 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230012023-05-0808 May 2023 Integrated Report 05000254/2023001 and 05000265/2023001 RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell SVP-23-018, Radioactive Effluent Release Report for 20222023-04-28028 April 2023 Radioactive Effluent Release Report for 2022 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23110A0622023-04-25025 April 2023 Transmittal of Final Quad Cities Nuclear Power Plant, Unit 1 Accident Sequence Precursor Report (Licensee Event Report 254-2022-001) ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration 2024-02-05 Category:Meeting Agenda MONTHYEARPMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024
[Table view]Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230124, Meeting with Constellation Energy Generation, LLC (CEG) Regarding Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities)2023-02-24024 February 2023 Meeting with Constellation Energy Generation, LLC (CEG) Regarding Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities) PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels PMNS20220116, Meeting with Constellation Energy Generation, LLC (CEG) Regarding a Proposed Alternative to Extend the Inservice Inspection Intervals at Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 22022-02-10010 February 2022 Meeting with Constellation Energy Generation, LLC (CEG) Regarding a Proposed Alternative to Extend the Inservice Inspection Intervals at Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20210635, Public Meeting Regarding Pre-submittal for Proposed License Amendment Requests Associated with Transition to New Fuel Type and Vendor at LaSalle Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 22021-05-24024 May 2021 Public Meeting Regarding Pre-submittal for Proposed License Amendment Requests Associated with Transition to New Fuel Type and Vendor at LaSalle Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20178A4282020-06-30030 June 2020 NEI Questions for June 30, 2020 Public Meeting ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15182A4292015-07-0101 July 2015 Bra BYR Cli DRE Lasa Qua Operator License Workshop Invitation ML14324A1392014-11-20020 November 2014 Notice of Closed Meeting with Exelon Nuclear to Discuss Exelon Nuclear'S 12/19/2013, Application for Amendment of the Dresden and Quad Cities Nuclear Power Station'S Technical Specifications to Add Reference to Topical Report WCAP-16865-P-A ML14169A4542014-06-13013 June 2014 Ltr 6/13/14 Bra BYR Cli DRE LAS Qua Operator License Workshop ML13193A0482013-08-14014 August 2013 Notice of Forthcoming Meeting with Exelon Generation Company, LLC (EGC) Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Stations ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13123A3432013-05-0202 May 2013 Ltr 5/2/13 Bra BYR Cli Dres LAS Qua 2013 Operator Licensing Workshop ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1203301242012-02-0909 February 2012 Handout for Public Meeting on February 9, 2012 (Slides) ML1201103342012-01-19019 January 2012 2/9/2012 Notice of Meeting with Exelon Nuclear/Quad Cities Nuclear Power Station Re Netco Spent Fuel Pool Rack Insert ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1105407242011-02-23023 February 2011 2/23/11 Ltr to F. Schiffley Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11 ML1031601532010-11-0909 November 2010 Annual Offsite Agency Dinner Meeting for the Offsite Emergency Response Support Personnel/Letter ML1019000152010-07-0909 July 2010 Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Revisions to the Cyber Security Plan Submittal for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island ML0926801972009-09-29029 September 2009 Notice of Pre-application Meeting to Discuss Egc'S Plants to Submit Power Uprate Requests for Various Units in Its Reactor Fleet ML0914901422009-06-0909 June 2009 Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes ML0810600322008-04-15015 April 2008 Notice of Revised Meeting with Exelon Generation Company, LLC to Discuss Licensing Activities for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and Three Mile Island ML0808605822008-04-0808 April 2008 Notice of Meeting with Exelon Generation Company, LLC (Exelon), to Discuss Licensing Activities ML0706405332007-03-0808 March 2007 Notice of Meeting with Exelon to Discuss the Results and Conclusions of Evaluations and Plant Modifications Performed to Support Extended Power Uprate (EPU) Operation of Quad Cities Nuclear Power Plant, Units 1 and 2 ML0706003912007-02-27027 February 2007 Revised Notice of Meeting with Exelon Generation Co., LLC to Discuss Licensing Issues and Schedule of Upcoming Licensing Activities with the Exelon Fleet of Nuclear Power Plants (Braidwood, Units 1 and 2, Byron, Unit Nos. 1 and 2; Clinton.. ML0703605402007-02-15015 February 2007 Forthcoming Meeting with Exelon Generation Company to Discuss Licensing Activities ML0532102022005-11-17017 November 2005 Cancelled Forthcoming Meeting with Exelon Generation Company, LLC, Quad Cities Results and Conclusions Regarding the Performance of the New Steam Dryers ML0530801592005-11-0707 November 2005 Notice of Meeting with Exelon Generation Co., to Discuss the Results and Conclusions Regarding the Performance of the New Steam Dryers at Quad Cities, Units 1 and 2 ML0529700402005-10-24024 October 2005 11/08-09/2005 Notice of Technical Meeting with Exelon Generation Company, LLC Regarding for Quad Cities New Steam Dryers ML0525905452005-09-19019 September 2005 Cancelled Meeting with Exelon Generation Company, LLC - Quad Cities Nuclear Power Station to Discuss Results and Evaluations of the Performance of the Steam Dryer 2024-01-29 |
Text
h I.
November 9,2010 Mr. Harral Logaras Regional Government Liaison Nuclear Regulatory Commission 2443 Warrenville Rd., Suite 210 Lisle, IL 60532 You, or your representative, and a guest are cordially invited to our annual offsite agency dinner meeting for the offsite emergency response support personnel. This dinner meeting is for the offsite agencies that support the Offsite Emergency Plan for Quad Cities Station. This meeting is held in appreciation of your support and is an opportunity for Exelon Managers and Offsite Emergency Support Personnel to meet.
The meeting will be held on December 9, 2010 at Rastrelli's Restaurant, 238 Main Avenue, Clinton, Iowa. We have enclosed a map for your convenience along with the evening's agenda.
Also enclosed are two attachments, which provide information about the public document room for Quad Cities Station and offsite evaluations. The public document room contains correspondence between the NRC and the utility. Contact the Vice President of Security &
Emergency Prearedness, if you want to receive a copy of any of the evaluations that relate to your agency.
The enclosed pre-addressed RSVP card will ensure reservations are made in your name.
Please print the information on the card and mail it no later than November 24, 2010.
If you have any questions, contact me (630) 657-4674 or Temple Wells (630) 657-4653.
Sincerely, Michael T. Muth Off-Site Coordinator Emergency Preparedness MMItw Enclosures k
December 9,2010 QUAD CITIES NUCLEAR STATION OFFSITE AGENCY DINNER MEETING AGENDA 6:OO P.M. "Get Acquainted" 6:30 P.M. Introductions and Welcome 6:45 P.M. Dinner 7:30 P.M. Station Presentation 8:OO P.M. DesserVSlideshow
PUBLIC NOTICE The Code of Federal Regulations (CFR), 10CFR50.54(t),
mandates Exelon Corporation (the licensee) provide for an annual review of its emergency preparedness program. The review must include an evaluation of the adequacy of interfaces with state and local governments and licensee drills, exercises, procedures and capabilities. The results of specific portions of this review, along with any recommendations, must be made available to the appropriate state and local governments.
The results of such evaluations, as they pertain to a specifically affected agency, will be provided upon receipt of a written request. The request should be addressed to:
Mr. Robert Svaleson Vice President of Security ti Emergency Preparedness Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
NUCLEAR REGULATORY COMMISSION PUBLIC DOCUMENT ROOM FOR QUAD CITIES STATION Is now available via the Internet at:
http://www .nrc.qov/read inq=rm/pdr.htmI
Quad Cities Station Annual Offsite Agency Dinner Meeting Rastrellis Restaurant Map Rastrellis Restaurant The Tuscany, Special Events Center 238 Main Avenue Clinton, Iowa 52732 (563) 242-7441