ML103090678

From kanterella
Jump to navigation Jump to search

Email: Point Beach Nuclear Plant, Units 1 and 2 - Request for Additional Information Relief Request RR-23
ML103090678
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/04/2010
From: Beltz T
Plant Licensing Branch III
To: Jim Costedio
Point Beach
beltz T, NRR/DORL/LPL3-1, 301-415-3049
Shared Package
ML103090675 List:
References
TAC ME4674, TAC ME4675
Download: ML103090678 (1)


Text

From:

Beltz, Terry Sent:

Thursday, November 04, 2010 7:01 AM To:

Costedio, James Cc:

Flentje, Fritzie; Andruszkiewicz, Edward

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Request for Additional Information re: Relief Request RR-23 (TAC Nos. ME4674 and ME4675)

Attachments:

RR-23_Draft RAIs_CVIB (ME4674 & ME4675).docx

Dear Mr. Costedio:

The U.S. Nuclear Regulatory Commission (NRC) staff in the Vessels and Internals Integrity Branch of the Office of Nuclear Reactor Regulation is reviewing Relief Request RR-23, related to examinations associated with the residual heat removal heat exchanger nozzle-to-shell welds at the Point Beach Nuclear Plant, Units 1 and 2. The staff determined that additional information is required to continue its review. Draft questions are provided as an attachment to this e-mail.

The NRC staff is available to discuss these questions with your staff in a conference call or meeting prior to formal issuance. Among other things, the discussion will include how the NRC would formally issue these questions and how the licensee will respond to them.

The sole purpose of this e-mail and its attachment is to prepare you and others for the proposed conference call or meeting. This e-mail and its attachment do not convey a formal NRC staff position, and do not formally request additional information.

Please don't hesitate to contact me if you have any questions or concerns.

Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Request for Additional Information re: Relief Request RR-23 (TAC Nos. ME4674 and ME4675)

Sent Date: 11/3/2010 1:49:14 PM Received Date: 11/4/2010 7:01:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov

Recipients:

JAMES.COSTEDIO@nexteraenergy.com (Costedio, James)

Tracking Status: None Fritzie.Flentje@nexteraenergy.com (Flentje, Fritzie)

Tracking Status: None Edward.Andruszkiewicz@nrc.gov (Andruszkiewicz, Edward)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 36960 11/3/2010 RR-23_Draft RAIs_CVIB (ME4674 & ME4675).docx 26253 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: