November 4,2010 EA-09-007 EA-09-059 Mr. Michael J. Pacilio Senior Vice President, Exelon Generating Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
PEACH BOnOM RESPONSE TO CONFIRMATORY ORDER NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004
Dear Mr. Pacilio:
Thank you for your letter of October 27,2010 (ML103070176) in response to our December 1, 2009, letter and Confirmatory Order (ML093350150) regarding two former Peach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other.
We acknowledge that the actions required in Section V.B of the Confirmatory Order have been completed. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
I n accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
Sincerely, IRA!
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects
EA-09-007 EA-09-059 Mr. Michael J. Pacilio Senior Vice President, Exelon Generating Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
PEACH BOTTOM RESPONSE TO CONFIRMATORY ORDER NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004
Dear Mr. Pacilio:
Thank you for your letter of October 27, 2010 (ML103070176) in response to our December 1, 2009, letter and Confirmatory Order (ML093350150) regarding two former Peach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other. We acknowledge that the actions required in Section V.B of the Confirmatory Order have been completed. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
Distribution:
D. Lew, DRP J. Clifford, DRP P. Krohn, DRP J. Bream, DRP E. Torres, DRP Sincerely, IRA!
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects F. Bower, DRP, SRI A. Ziedonis, DRP, RI D. Holody, ORA M. McLaughlin, ORA SUNSI Review Complete: PGK (Reviewer's Initials)
ML103080524 Doc Name: G:\\DRP\\BRANCH4\\NRCAcknowledgment Itr Confirmatory Order Response to 10272010 Itr.docx After declaring this document "An Official Agency Record" it will be released to the Public.
To receive acopy of tnis document, indicate in tne box: "C"= Copy without attactJmentienclosure "E"=Copy with attactJmentlenclosure, "N"=No copy OFFICE mmt RIfDRP I
RI/DRP I
I NAME ETorresl ET PKrohnl PGK DATE 11/03/10 11/04/10 OFFICIAL RECORD COPY