MONTHYEARML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) ML24190A1292024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints ML24185A1512024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) ML24176A1022024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 ML24141A2462024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual CNL-24-036, – 10 CFR 50.46 Annual Report2024-04-25025 April 2024 – 10 CFR 50.46 Annual Report ML24116A2522024-04-25025 April 2024 Site Emergency Plan Implementing Procedure Revision ML24115A1652024-04-24024 April 2024 Breaker Trip Automatically Started an Emergency Diesel Generator 05000296/LER-2024-001, Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup2024-04-22022 April 2024 Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A2302024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-03
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML23101A0252023-04-11011 April 2023 Response to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000259/2023090 and 05000260/2023090, EA-22-122 ML20274A0122020-09-23023 September 2020 Tennessee Valley Authority Reply to Notice of Violation (EA-20-06 and EA-20-07) ML20274A0142020-09-23023 September 2020 TVA Answer to Answer to Notice of Violation (EA-20-06 and EA-20-07) CNL-16-122, Response to Apparent Violations in NRC Inspection Report 05000260/2016012 and Investigation Report No. 2-2015-008, EA-16-0092016-08-0808 August 2016 Response to Apparent Violations in NRC Inspection Report 05000260/2016012 and Investigation Report No. 2-2015-008, EA-16-009 CNL-15-123, Updated Reply to Notice of Violation; EA-11-252; and Follow-up to 10 CFR 50.9, Completeness and Accuracy of Information, Notification2015-07-15015 July 2015 Updated Reply to Notice of Violation; EA-11-252; and Follow-up to 10 CFR 50.9, Completeness and Accuracy of Information, Notification ML14153A6652014-05-30030 May 2014 Reply to Notice of Violation; EA-14-005 CNL-14-043, Response to Apparent Violation in NRC Integrated Inspection Report 05000259-13-005, 05000260-13-005, and 05000296-13-005, EA-14-0052014-03-17017 March 2014 Response to Apparent Violation in NRC Integrated Inspection Report 05000259-13-005, 05000260-13-005, and 05000296-13-005, EA-14-005 ML13268A4212013-08-30030 August 2013 Updated Reply to Notice of Violation; EA-1 1-252; and Follow-up to 10 CFR 50.9, Completeness and Accuracy of Information, Notification ML13080A0772013-03-18018 March 2013 Revised Reply to a Notice of Violation, EA-11-018 ML13067A4002013-03-0101 March 2013 Updated Reply to Notice of Violation; EA-11-252; and Follow-up to 10 CFR 50.9, Completeness and Accuracy of Information, Notification ML12277A2482012-09-28028 September 2012 Updated Reply to Notice of Violation; EA-11-252; and Follow-up to 10 CFR 50.9, Completeness and Accuracy of Information, Notification ML12054A6882012-02-22022 February 2012 Reply to Notice of Violation; EA-11-252 ML11362A3792011-12-19019 December 2011 Response to an Apparent Violation in Inspections Report 05000259-11-011, 05000260-11-011, 05000296-11-011; EA-11-252 ML11189A1132011-07-0505 July 2011 Reply to a Notice of Violation; EA-11-012 ML1030701332010-10-29029 October 2010 Supplemental Information Related to the Reply to Notice of Violation; EA-09-307 ML1028601262010-10-0707 October 2010 Updated Reply to Notice of Violation; EA-09-307 ML1014100132010-05-18018 May 2010 Reply to Notice of Violation; EA-09-307 ML0713002572007-05-0909 May 2007 Reply to Notice of Violation - EA-06-143 ML0415600422004-06-0202 June 2004 NRC Inspection Report 50-259/2004-011 - Reply to Notice of Violation (NOV) EA-04-063 2023-04-11
[Table view] |
Text
Tennessee Valley Authority 1101 Market Street, LP 3R Chattanooga, Tennessee 37402-2801 R. M. Krich Vice President Nuclear Licensing October 29, 2010 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Supplemental Information Related to the Reply to Notice of Violation; EA-09-307
References:
- 1. Letter from NRC to TVA, "Final Significance Determination of Yellow and White Findings and Notice of Violation (NRC Inspection Report Nos. 05000259/2010007, 05000260/2010007 and 05000296/2010007), Browns Ferry Nuclear Plant," dated April 19, 2010
- 2. Letter from TVA to NRC, "Reply to Notice of Violation; EA-09-307,"
dated May 18, 2010
- 3. Letter from NRC to TVA, "Reply to Tennessee Valley Authority Letter Dated May 18, 2010, Regarding Inspection Report No.
05000259/2010007, 05000260/2010007, and 05000296/2010007, Browns Ferry Nuclear Plant," dated June 17, 2010
- 4. Letter from TVA to NRC, "Updated Reply to Notice of Violation; EA 307," dated October 7, 2010 In the updated reply to Notice of Violation (NOV) EA-09-307 (Reference 4), the Tennessee Valley Authority (TVA) noted specific corrective actions to address the Appendix R fire protection issues at Browns Ferry Nuclear Plant (BFN) cited in the NOV. The primary corrective action committed to by TVA in this response is implementation of National Fire Protection Association (NFPA) Standard 805, in accordance with 10 CFR 50.48.
However, TVA plans to submit the license amendment request for the transition to NFPA 805 no later than March 4, 2012. During the recent NRC team inspection carried out pursuant to NRC Inspection Procedure Section 95002, the team reviewed TVA's causes and corrective actions listed in our reply to the NOV.
printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 October 29, 2010 The purpose of this letter is to provide supplemental information regarding actions being taken to support the corrective actions being taken to address the NOV. These actions were discussed with the NRC 95002 inspection team leader.
Accordingly, TVA has implemented an Appendix R 95002 Task Force. The Appendix R 95002 Task Force is a group sponsored by TVA Nuclear Power Group senior management that is tasked with meeting the following objectives:
" Maintain the Task Force through completion of all root cause analysis corrective actions.
" Return and maintain the Fire Protection System to excellent materiel and system health conditions.
- Continue to reduce risk and improve safety margin on the Fire Protection System.
- Close 95002 self-assessment corrective actions and perform independent review of the action closures.
- Complete the root cause corrective actions as scheduled.
- Verify the accuracy and adequacy of completed 95002 actions items.
- Utilize a 95002 Problem Evaluation Report action verification form
- Utilize a closure review board
- Perform quarterly Quality Assurance assessments of corrective actions
- Implement semi-annual effectiveness review challenge boards by TVA Nuclear management. Challenge board members may include Executive Sponsor; Vice President, Nuclear Licensing; Site Vice President; 95002 Project Manager; Quality Assurance Manager; and others as required.
- Routinely update NRC Region II management on progress and status of meeting the Task Force objectives.
There is one new regulatory commitment contained in this letter, as identified in the enclosure. Should you have any questions concerning this submittal, please contact James Emens at (256) 729-2636.
Respectfully, RM
Enclosure:
Regulatory Commitment cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant
U.S. Nuclear Regulatory Commission Page 3 October 29, 2010 bcc (Enclosure):
NRC Project Manager - Browns Ferry Nuclear Plant NRC Branch Chief - Region II G. P. Arent K. W. Brown T. C. Matthews D. E. Jernigan L. A. Jones M. J. Lorek K. J. Poison J. J. Randich H. R. Rogers M. D. Skaggs P. D. Swafford L. E. Thibault E. J. Vigluicci EDMS
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 SUPPLEMENTAL REPLY TO NOTICE OF VIOLATION; EA-09-307 REGULATORY COMMITMENT TVA has implemented an Appendix R 95002 Task Force. The Appendix R 95002 Task Force is a group sponsored by TVA Nuclear Power Group senior management that is tasked with meeting the following objectives:
" Maintain the Task Force through completion of all root cause analysis corrective actions.
- Return and maintain the Fire Protection System to excellent materiel and system health conditions.
" Minimize fire impairments.
" Continue to reduce risk and improve safety margin on the Fire Protection System.
- Close 95002 self-assessment corrective actions and perform independent review of the action closures.
- Complete the root cause corrective actions as scheduled.
" Verify the accuracy and adequacy of completed 95002 actions items.
- Utilize a 95002 Problem Evaluation Report action verification form
- Utilize a closure review board
- Perform quarterly Quality Assurance assessments of corrective actions
" Implement semi-annual effectiveness review challenge boards by TVA Nuclear management. Challenge board members may include Executive Sponsor; Vice President, Nuclear Licensing; Site Vice President; 95002 Project Manager; Quality Assurance Manager; and others as required.
- Routinely update NRC Region II management on progress and status of meeting the Task Force objectives.