Submittal of Analytical Evaluation of Reactor Pressure Vessel Closure Head Indications
ML103060069
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/29/2010
From: Cowan P
Exelon Nuclear, Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML103060069 (2)


Text

Exelon Nuclear www.exeloncorp.com Exelein' 200 Exelon Way Nuclear Kennett Square, PA 19348 10 CFR 50.55a October 29, 2010 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Peach Bottom Atomic Power Station, Unit 2 Renewed Facility Operating License No. DPR-44 NRC Docket No. 50-277

Subject:

Submittal of Analytical Evaluation of Reactor Pressure Vessel Closure Head Indications

Reference:

1) Letter from M. P. Gallagher (Exelon Generation Company, LLC) to U.S.

Nuclear Regulatory Commission, "Submittal of Analytical Evaluation of Reactor Pressure Vessel Closure Head Indications," dated December 9, 2002 In accordance with the American Society of Mechanical Engineers (ASME) Code,Section XI, 2001 Edition through 2003 Addenda, IWB-3134(b) ("Review by Authorities"), Peach Bottom Atomic Power Station, Unit 2, is submitting an analytical evaluation associated with the Unit 2 Reactor Pressure Vessel (RPV) Closure Head to Flange Weld (CH-C-2) examined during the Fall 2010 refueling outage.

As discussed in the attached report, an analytical evaluation of the indication was performed to disposition an indication associated with the RPV Closure Head to Flange Weld (CH-C-2). The indication (Indication #9) is in the circumferential weld approximately seventeen (17) inches away from the closest meridional weld and is orientated transverse to the weld in the plate region of the weld. Therefore, the indication is in the same plane (i.e., same orientation) to the meridional weld indications that were evaluated in 2002 (Reference 1). Per IWB-3132.3

("Acceptance by Analytical Evaluation"), the indication in weld CH-C-2 has been evaluated as described in IWB-3600 and meets the acceptance criteria of IWB-3600. It is concluded that the subject indication (Indication #9) in the CH-C-2 weld, even after accounting for projected crack

Submittal of Analytical Evaluation of Reactor Pressure Vessel Closure Head Indications U.S. Nuclear Regulatory Commission October 29 2010 Page 2 growth for the life of the plant including license renewal (60 total years), is acceptable for continued operation in as-is condition.

If you have any questions concerning this letter, please contact Tom Loomis (610-765-5510).

Respectfully, Pamela B. Cowan Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) "Evaluation of Indication in Peach Bottom Unit 2 Vessel Closure Head Weld (CH-C-2)," Report Number 0000-0124-0988, September 2010

2) "The Evaluation of Indications in Peach Bottom Unit 2 Vessel Closure Head For Continued Operation," Report Number GE-NE-0000-0007-9747, September 2002 cc: USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, PBAPS USNRC Project Manager, PBAPS R. R. Janati, Bureau of Radiation Protection S. T. Gray, State of Maryland