Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit 1 has been at 100% power, steady state operation, for the past month.

Unit-i PCS is out of service for emergent repairs.

Unit 2 PCS is fully functional and operating normally.

Pressurizer Heater Group 3 (Proportional Heater) is in service at maximum gating and Backup Heater Group 5 is locked-on.

Total steam generator blowdown flow is 60 gpm per steam generator.

A Tabular Log for the PCS Group U1CALORM, using the Unit 2 PCS has been generated.

Precautions and Limitations have been reviewed.

Initial conditions have been satisfied.

INITIATING CUE You are requested to perform a Unit 1 Calorimetric Hand Calculation manually in accordance with i-PT-24 up to and including Step 6.2.6.

For pressurizer heater input kW determination use the kW values provided in the Pressurizer Heater Availability Report 2010/04/01 Page: 1 of 8

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM R57 TASK Perform the calorimetric heat balance (hand calculation) (1-PT-24).

TASK STANDARDS Task was performed as directed by the procedure referenced in the task statement within parentheses (one of the underlined procedures if several are cited)

KIA

REFERENCE:

015-A1.O1 (3.5/3.8)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 40 minutes Start Time =

Actual Time = minutes Stop Time =

PERFORMANCE EVALUATION Rating [ JSATISFACTORY [ ]UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluators Signature /

Date EVALUATORS COMMENTS Dominion 2010/04/01 Page: 2 of 8

North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM R57 (modified)

READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPM5 I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the reactor operator level.

2010/04/01 Page: 3 of 8

INITIAL CONDITIONS Unit 1 has been at 100% power, steady state operation, for the past month.

Unit-i PCS is out of service for emergent repairs.

Unit 2 PCS is fully functional and operating normally.

Pressurizer Heater Group 3 (Proportional Heater) is in service at maximum gating and Backup Heater Group 5 is locked-on.

Total steam generator blowdown flow is 60 gpm per steam generator.

A Tabular Log for the PCS Group U1CALORM, using the Unit 2 PCS has been generated.

Precautions and Limitations have been reviewed.

Initial conditions have been satisfied.

INITIATING CUE You are requested to perform a Unit 1 Calorimetric Hand Calculation manually in accordance with i-PT-24 up to and including Step 6.2.6.

For pressurizer heater input kW determination, use the kW values provided in the Pressurizer Heater Availability Report EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT Calculator Tabular Log - Unit 1 Calorimetric-Hand CaIc Pressurizer Heater Availability Report 0-SC-7.1, Saturated Steam and Water Enthalpies 0-SC-7.2, Feedwater Enthalpies 2010/04/01 Page: 4 of 8

PERFORMANCE STEPS START TIME I Obtain the current total blowdown flow rate. Procedure Step 6.2.1 of 1-PT-24 SAT[] UNSAT[] I I Standards I Blowdown rate is correctly transcribed (60 gpm each 180 total)

Notes/Comments Provided in initial conditions 2 Complete Attachment 5 for Alternate Data for Calorimetric Procedure Step Calculation. 62.2 of 1-PT-24 ISATI] UNSAT[] I Standards I Data is transcribed using information and curves provided (see key) I Notes/Comments Data is obtained from tabular report provided to candidate.

2010/04/01 Page: 5 of 8

3 Complete the Attachment 6 for Feedwater Enthalpy. Procedure Step 6.2.3 of 1-PT-24 SAT[1 UNSAT[1 I Standards I Attachment 6 completed using data and curves provided (see key)

Notes/Comments 4 Complete Attachment 7 for Feed Flow Calorimetric Determination Procedure Step to the point of determining the net reactor power. 6.2.4 of 1-PT-24 SATI1 UNSATI1 I I Standards I Attachment 7 completed using data and curves provided (see key)

Notes/Comments 5 Using Attachment 8, determine the power correction factor using Procedure Step the lowest actual feedwater temperature. 6.2.5.a of 1-PT-24 ISAT[] UNSAT[] I I Standards I Power correction factor determined from Attachment 8 (see key)

Notes/Comments 2010/04/01 Page: 6 of 8

6 Record the power correction factor on Attachment 7 for Feed Flow Procedure Step Calorimetric Determination. 6.2.5.b of 1-PT-24 ISAT[] UNSAT[]

I Standards I Data obtained in element 5 is recorded on attachment 7 Notes/Comments 8 Complete Attachment 7 except for the AS LEFT NI INDICATED Procedure Step REACTOR POWER. 6.2.6 of 1-PT-24 Critical Step SAT[] UNSAT[]

Standards Att. 7 is completed up to recording the AS FOUND NI INDICATED REACTOR POWER.

Calculated reactor power is determined to be 100.1%. (acceptance criteria 99.7% 100.5%).

Notes/Comments The band for the final calculated Adjusted Net Reactor Power allows for rounding of numbers during previous calculations and graph interpolations.

END OF EVALUATION STOP TIME 2010/04/01 Page: 7 of 8

Dominion North Anna Power Station ADMINISTRATIVE JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS The unit entered Mode 3 on 4/01/2010 at 0600 for a scheduled refueling outage.

The core has been reloaded and the cavity drain-down is complete.

Current conditions are as follows:

  • The Date and time is 4/20/2010, 2000
  • RCS level is 74 inches above Mid Loop
  • RHR pump discharge temperature is 97°F
  • 55 fuel assemblies were exchanged during on-load INITIATING CUE The Shift Manager has directed you to determine the estimated time to boil in accordance with 1-GOP-i 3.1, using the current conditions.

(Record your results in the space provided)

Corrected Time to Boil estimate:

Dominion North Anna Power Station ADMINISTRATIVE JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Determine estimated time to boil.

TASK STANDARDS Given a copy of 1-GOP-I 3.1, determine the estimated time to boil KIA

REFERENCE:

G2.1.25 (3.9/4.2)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 10 minutes Start Time =

Actual Time = minutes Stop Time =

PERFORMANCE EVALUATION Rating [ ]SATISFACTORY [ ]UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluators Signature /

Date EVALUATORS COMMENTS Page 2 of 8

Dominion North Anna Power Station ADMINISTRATIVE JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The unit entered Mode 3 on 4/01/2010 at 0600 for a scheduled refueling outage.

The core has been reloaded and the cavity drain-down is complete.

Current conditions are as follows:

  • The Date and time is 4/20/2010, 2000
  • RCS level is 74 inches above Mid Loop
  • RHR pump discharge temperature is 97°F
  • 55 fuel assemblies were exchanged during on-load Page 3 of 8

INITIATING CUE The Shift Manager has directed you to determine the estimated time to boil in accordance with 1-GOP-13.1, using the current conditions.

EVALUATION METHOD Demonstration if conducted in the simulator or in a laboratory (use DEMONSTRATION cues)

Verbal-visual if conducted in the station or on a dead simulator (use VERBAL-VISUAL cues)

TOOLS AND EQUIPMENT Calculator Copy of 1-GOP-13.1.

PERFORMANCE STEPS START TIME I Determine time after shutdown for use on attachment 1 or 2. Procedure Step N/A ISATF1 UNSATI1 I Standards Operator determines time after shutdown for use on attachment 1 or 2 is 19 days and 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> (470 hours0.00544 days <br />0.131 hours <br />7.771164e-4 weeks <br />1.78835e-4 months <br />).

Notes/Comments:

Page 4 of 8

2 Enter Time to Boil from midloop and 100°F from attachment 1 or 2. Procedure Step:

5.6.1 Critical Step SAT[] UNSAT[]

Standards Operator determines 19.25 minutes (based on time of 470 hours0.00544 days <br />0.131 hours <br />7.771164e-4 weeks <br />1.78835e-4 months <br /> from entry into Mode 3).

Acceptance criteria of 19.0 19.5 (based on half-increment readability).

Notes/Comments:

3 Enter correction factor for RCS water level from attachment 3. Procedure Step:

5.6.2 CriticaiStep SAT[] UNSAT[]

Standards Operator determines 1.61 (based on initial condition of 74 inches above midloop).

Acceptance criteria of 1.60 1.62 (based on half-increment readability).

Notes/Comments:

Page 5 of 8

4 Enter correction factor for initial RCS temperature from Procedure Step:

attachment 4. 5.6.3 CriticaiStep SAT[] UNSAT[]

Standards Operator determines 1.025 (based on initial condition of 97°F RHR pump discharge temperature).

Acceptance criteria of 1.00 1.05 (based on half-increment L readability).

Notes/Comments:

5 Enter correction factor for number of fuel assemblies exchanged Procedure Step:

this fuel cycle on-load attachment 5. 5.6.4 Critical Step SAT[] UNSAT[]

Standards Operator determines 1.1 175 (based on initial condition of 55 fuel assemblies were exchanged during on-load).

Acceptance criteria of 1.1150 1.1200 (based on half-increment readability).

Notes/Comments:

Page 6 of 8

6 Determine corrected time to boil estimate. Procedure Step:

5.6.5 Critical Step SAT[] UNSAT[]

Standards Operator determines corrected Time to Boil 35.5 minutes based on above elements.

(19.25x 1.61 x 1.025x 1.1175)

Acceptance criteria:

Low calc 33.9 minutes** (19.0 x 1.60 x 1.00 x 1.1150)

High calc 37.1 minutes (19.5 x 1.62 x 1.05 x 1.1200) for conservatism a lower limit of acceptance criteria of 33 minutes is acceptable based on rounding down times.

Notes/Comments:

>>>>> END OF EVALUATION <<<<<

STOP TIME Page 7 of 8

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

JOB PERFORMANCE MEASURE TASK CHECKLIST Calculator Page 8 of 8

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit 1 is operating at 100% when Nuclear Oversight reports that an inspection has identified calculation errors during the previous main steam safety valve (MSSV) testing.

The data was recalculated, and the following lists for the actual setpoints for the affected SG MSSVs:

1-MS-SV101A 1125 psig 1-MS-SV-103B 1070 psig 1-MSSV-103C 1150 psig 1-MS-SV-102A 1090 psig 1-MS-SV-104B 1103 psig 1-MS-SV-104A- 1158 psig INITIATING CUE Based on the revised setpoint data provided, you are requested to perform the following:

1.) Identify inoperable MSSVs, if any.

2.) Evaluate compliance with Technical Specification requirements and determine actions required, if any.

2010/04/01 Page: 1 of 7

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM S35 TASK Evaluate compliance with technical requirements (Technical Requirements) for Main Steam Safety Valves.

TASK STANDARDS LCO 3.7.1 was entered KIA

REFERENCE:

GEN-2.l.12 (2.9/4.0)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 8 minutes Start Time =

Actual Time = minutes Stop Time =

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [1 UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluators Signature /

Date EVALUATORS COMMENTS 2010/04/01 Page: 2 of 7

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM S35 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the senior reactor operator level.

2010/04/01 Page: 3 of 7

INITIAL CONDITIONS Unit 1 is operating at 100% when Nuclear Oversight reports that an inspection has identified calculation errors during the previous main steam safety valve setpoint.

The data was recalculated, and the following lists for the actual setpoints for the affected SG MSSVs:

1-MS-SV-1O1A 1125 psig 1-MS-SV-103B 1070 psig i-MS-SV-103C 1150 psig i-MS-SV-i 02A 1090 psig 1-MS-SV-i 04B 1103 psig 1-MS-SV-104A- 1158 psig INITIATING CUE Based on the revised setpoint data provided, you are requested to perform the following:

3.) Identify inoperable MSSVs, if any.

4.) Determine Tech Spec REQUIRED ACTIONS and COMPLETION TIMES, if any.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT Technical Specifications, Technical Requirements Manual, and Bases Documents.

Calculator 2010/04/01 Page: 4 of 7

PERFORMANCE STEPS START TIME 1 I Identify the applicable technical specification LCO requirement. I Procedure Step

[itical Step SAT[] UNSAT[)

I I Stndrds

. - -*- - I Tech Spec 3.7.1 is identified as the applicable LCO 1 Notes/Comments 12 I Determine operability of affected components using Table 3.7.1-2. I Procedure Step Critical Step SAT[] UNSAT[]

Standards Candidate identifies only lOlA, 102A, 103B, and 1030, are inoperable.

Notes/Comments 2010/04/01 Page: 5 of 7

3 Determine the REQUIRED ACTION and COMPLETION TIME for Procedure Step the applicable limiting condition for operation (LCO).

Critical Step SAT[] UNSAT[]

Standards Using Table 3.7.1-1 and the data from element 2 candidate determines that 1.) Action B. 1, reduce thermal power to less than 37% within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> AND 2.) Action B.2, reduce power range neutron flux high reactor trip setpoint to less than 37% within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> apply.

Notes/Comments END OF EVALUATION STOP TIME 2010/04/01 Page: 6 of 7

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required) 2010/04/01 Page: 7 of 7

Dominion North Anna Power Station ADMINISTRATIVE JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Both Units are operating at 100% power with no abnormal conditions. A drain valve on the west side at the bottom of the fluid waste treating tank (1-DC-TK-2) needs to be cycled several times.

All radiation workers involved in the task have worked at the North Anna site and no other locations.

INITIATING CUE You are directed to perform the following:

  • Select the appropriate RWP for operations personnel
  • Determine the required protective clothing for the job.
  • Determine the required dosimetry for the job.
  • Determine the dose alarm setpoint AND the dose rate alarm setpoint in effect under the RWP.
  • Determine the maximum stay time based on reaching the dosimeter alarm setpoint (assume that NO dose is accumulated in transit to or from the work location).
  • State the action(s) required if a dosimeter alarm setpoint is reached.

Dominion North Anna Power Station ADMINISTRATIVE JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Determine Correct RWP, Stay Time, Dosimetry, and Dressout Requirements For A Given Task.

TASK STANDARDS Correct RWP is selected, protective clothing and dosimetry are selected for the given RWP, dose alarm and dose rate setpoints identified from the RWP, and the maximum stay time calculated based on the alarm setpoints.

KIA

REFERENCE:

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 20 minutes Start Time =

Actual Time = minutes Stop Time =

PERFORMANCE EVALUATION Rating [1 SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluators Signature /

Date EVALUATORS COMMENTS Page 2 of 7

Dominion North Anna Power Station ADMINISTRATIVE JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Both Units are operating at 100% power with no abnormal conditions. A drain valve on the west side at the bottom of the fluid waste treating tank (1-DC-TK-2) needs to be cycled several times.

All radiation workers involved in the task have worked at the North Anna site and no other locations.

INITIATING CUE You are directed to perform the following:

  • Select the appropriate RWP for operations personnel
  • Determine the required protective clothing for the job.
  • Determine the required dosimetry for the job.
  • Determine the dose alarm setpoint AND the dose rate alarm setpoint in effect under the RWP.
  • Determine the maximum stay time based on reaching the dosimeter alarm setpoint (assume that NO dose is accumulated in transit to or from the work location).
  • State the action(s) required if a dosimeter alarm setpoint is reached.

Page 3 of 7

EVALUATION METHOD Demonstration if conducted in the simulator or in a laboratory (use DEMONSTRATION cues)

Verbal-visual if conducted in the station or on a dead simulator (use VERBAL-VISUAL cues)

TOOLS AND EQUIPMENT RWPs, Survey Map, Calculator PERFORMANCE STEPS START TIME 1 From the RWPs provided determine which RWP is applicable for Procedure Step the job. RWP 10-2229 SAT[] UNSAT[] I I Standards RWP 10-2229 is selected from the four RWPs provided.

Notes/Comments:

RWP 10-0001 is not correct since no HRA entries are allowed under this RWP.

RWP 10-1 007 is not correct since it is for maintenance activities.

RWP 10-1203 is not correct since it is for emergency situations RWP 10-2229 is the correct RWP.

Page 4 of 7

2 From the RWPs provided, determine the protective clothing Procedure Step:

requirements. RWP 10-2229 Critical Step SAT[] UNSAT[]

Standards Operator determines that the area is in a contaminated area (CA) and the protective clothing requirements are those listed on the RWP for contaminated areas.

Notes/Comments: Operator is required to identify from the survey map that the area is a contaminated area (CA).

3 From the RWPs provided, determine the dosimetry required. Procedure Step:

RWP 10-2229 Critical Step SAT[] UNSAT[]

I Standards I Operator identifies that DAD/SRD & TLD.

Notes/Comments: Operator is required to identify from the survey map that the area is a high rad area.

Page 5 of 7

4 From the RWPs provided, determine the dose alarm setpoint and Procedure Step:

dose rate alarm in effect under the RWP. RWP 10-2229 Critical Step SAT[] UNSAT[]

Standards Operator correctly identifies that the dose alarm is 50 mRem and the dose rate alarm is 500 mRem/hr.

Notes/Comments: Operator is required to identify from the survey map that task 2 setpoint must be used based on work location.

5 Determine the maximum stay time in minutes based on reaching Procedure Step:

the RWP dose alarm setpoint. RWP 10-2229 Critical Step SAT[] UNSAT[]

Standards Operator uses RWP to determine dose alarm is set at 50 mRem.

Operator uses survey map to determine general area dose rate is 125 mr/hr.

Operator then divides 50 by 125 to obtain a stay time of 24 minutes after converting to minutes (.4 hrs x 60 minutes).

Notes/Comments:

Page 6 of 7

5 State the action(s) required if a dosimeter alarm setpoint is Procedure Step:

reached. RWP 10-2229 Critical Step SAT[] UNSAT[J Standards Operator correctly identifies leave area immediately and report to (notify) the health physics office.

Notes/Comments:

END OF EVALUATION STOP TIME Page 7 of 7

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit 1 is shutdown with RCS temperature at 4200 F.

Unit 2 is at 100% power.

Lt 1-VG-RM-179 has had a valid reading of 4.22 E + 7 Ci/sec. for 18 minutes.

Dose assessment is available and indicates that doses at or beyond the site boundary are 40 mR TEDE and 120 mR CDE thyroid.

INITIATING CUE You are requested to classify an emergency event in accordance with EPIP-1.01. This is a time critical JPM.

2010/04/07 Page: 1 of 5

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Classify an emergency event.

TASK STANDARDS Event was identified as RA1.2 within 15 minutes.

K/A

REFERENCE:

GEN-2.4.41 (2.9/4.6)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 10 minutes Start Time =

Actual Time = minutes Stop Time =

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY { ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluators Signature /

Date EVALUATORS COMMENTS 2010/04/07 Page: 2 of 5

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the senior reactor operator level.

INITIAL CONDITIONS Unit 1 is shutdown with RCS temperature at 420° F.

Unit 2 is at 100% power.

VG-RM-179 has had a valid reading of 4.22 E + 7 Ci/sec. for 18 minutes.

Dose assessment is available and indicates that doses at or beyond the site boundary are 40 mR TEDE and 120 mR CDE thyroid.

INITIATING CUE 2010/04/07 Page: 3 of 5

You are requested to classify an emergency event in accordance with EPIP-1.O1. This is a time critical JPM.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME 1 Determine the EAL identifier using the emergency action level Procedure Step matrix.

CriticaiStep SAT[] UNSAT[]

I Standards I Event is identified as RA1 .2 within 15 minutes.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME 2010/04/07 Page: 4 of 5

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required) 2010/04/07 Page: 5 of 5

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit 1 has experienced a loss of offsite power and the station emergency manager (SEM) has declared an NOUE, EAL identifier SU1.1.

PCS printouts are available for meteorological data.

NO release of radioactive material is presently occurring.

There are NO known impediments to site access.

INITIATING CUE You are requested to make initial state and local notifications in accordance with EPIP 2.01 Notification of State and Local Governments.

This is the initial emergency declaration and the station emergency manager has directed items 5 through 9 of Attachment 2 to be excluded from the message.

This JPM is time critical.

2010/04/07 Page: 1 of 10

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Make state and local notifications in accordance with EPlP2.01 TASK STANDARDS Make notification of event (SU 1 1).

K/A

REFERENCE:

GEN-2.4.41 (2.9/4.6)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 10 minutes Start Time =

Actual Time = minutes Stop Time =

PERFORMANCE EVALUATION Rating [ ]SATISFACTORY [ ]UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluators Signature /

Date EVALUATORS COMMENTS 201 0/04/07 Page: 2 of 10

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the senior reactor operator level.

INITIAL CONDITIONS Unit 1 has experienced a loss of offsite power and the station emergency manager (SEM) has declared an NOUE, EAL identifier SU1.1.

PCS printouts are available for meteorological data.

NO release of radioactive material is presently occurring.

There are NO known impediments to site access.

2010/04/07 Page: 3 of 10

INITIATING CUE You are requested to make initial state and local notifications in accordance with EPIP 2.01, Notification of State and Local Governments.

This is the initial emergency declaration and the station emergency manager has directed items 5 through 9 of Attachment 2 to be excluded from the message.

This JPM is time critical.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT EPIP-2.01, Notification Of State And Local Governments.

PCS printout with met data.

2010/04/07 Page: 4 of 10

PERFORMANCE STEPS START TIME 1 Initiate EPIP 2.01 Procedure Step 1 of EPlP2.O1 SAT[] UNSAT[] I Standards Operator fills in information on step 1.

Notes/Comments 2 Check first report of emergency. Procedure Step 2 of EPIP-2.01 ISAT[] UNSAT[] I Standards Operator determines from initial conditions that this is the first report of the emergency.

Notes/Comments 2010/04/07 Page: 5 of 10

3 Check emergency remains in effect. Procedure Step 3 of EPIP-2.O1 ISAT[] UNSAT[J I Standards Operator recognizes this to be the initial report from the initial conditions.

Notes/Comments 4 Record information on Attachment 2, Report of Emergency to Procedure Step State and Local Governments. 4 of EPIP-2.O1

[Critical Step SAT[] UNSAT[]

I Standards I Information on Attachment 2 is accurately and completely filled in.

Notes/Comments 2010/04/07 Page: 6 of 10

5 Have SEM/RM approve report. Procedure Step 5 of EPIP-2.01 J Critical Step SAT[} UNSAT[} 1 I Standards I SEM/RM approves and signs the approval block on Attachment 2.

LSimulate Cue(s) I Inform operator 1 am the SEM and I will approve the report. I Notes/Comments 6 Check nstaphone clear of conflicting message traffic. Procedure Step 6.a of EPIP-2.01 ISAT[1 UNSAT[] I Standards Operator correctly locates phone and verifies no conflicting message traffic.

I Simulate Cue(s) I Inform operator There is no conflicting message traffic. I Notes/Comments 2010/04/07 Page: 7 of 10

7 Operator makes contact with State and local Emergency Operation Procedure Step Centers (EOC5). 6.b of EPIP-2.01 Critical Step SAT[] UNSAT[]

Standards I Operator makes contact.

I Simulate Cue(s) I Inform operator This is the Virginia State EOC stand by for a roll call.

Notes/Comments 8 Perform initial roll call. Procedure Step 6.c of EPIP-2.01 J Critical Step SAT[] UNSAT [1 1 I Standards I Operator checks boxes as EOCs answer.

Simulate Cue(s) Inform operator Louisa County is on the line, Spotsylvania County is on the line, Hanover County is on the line, Orange County is on the line, Caroline County is on the line.

Notes/Comments 2010/04/07 Page: 8 of 10

8 Record time initial notification was made. Procedure Step 6.d of EPIP-2.01 Critical Step SAT[J UNSAT[] 1 I Standards I Operator enters time. Time is less than or equal to 15 minutes Simulate/Performa Inform operator JPM is complete.

nce Cue(s)

Notes/Comments END OF EVALUATION STOP TIME 20 10/04/07 Page: 9 of 10