ML103050055

From kanterella
Jump to navigation Jump to search
Comment (5) of Larry Werner on Behalf of North Coast Engineering, Inc. Re Expression of Thanks to NRC for Conducting Environmental Scoping Meetings in San Luis Obispo in March 2010
ML103050055
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/08/2010
From: Werner L
North Coast Engineering
To: Stuyvenberg A
Rulemaking, Directives, and Editing Branch, License Renewal Projects Branch 2
References
75FR4427 00005
Download: ML103050055 (1)


Text

AN&! NORTH COAST ENGIPVEERING, INC.

I U* Civil Engineering

  • Land Surv'eying
  • Project Development

/~,27' ~9/D

-'U cfi April 8, 2010 Ti

~Th-I N.)

Andrew Stuyvenberg, Project Manager Tj

~.

U.S. Nuclear Regulatory Commission -o Mail Stop: 0-11F1 71] C/)

Washington, DC 20555-0001 U CD

Dear Mr. Stuyvenberg,

I would like to thank the Nuclear Regulatory Commission (NRC) for conducting the environmental scoping meetings in San Luis Obispo in March 2010, and giving the local community a chance to provide input on what issues should be considered in the Environmental Impact Statement (EIS).

Diablo Canyon Nuclear Power Plant has been a huge asset to our area. Not only does it produce clean energy, it is one of the most efficient and well run plants in the United States. I am proud to have the facility in our community.

I am writing to encourage the NRC to address Diablo Canyon's economic impacts on the local economy and educational facilities in the area. Because of Diablo Canyon Power Plant, Pacific Gas and Electric Company is the largest private employer in San Luis Obispo County with more than 1,600 jobs.

Additionally, the company is the largest property tax payer in the county paying more than $24 million for the fiscal year 2009/2010 with a significant portion going to local educational institutions. With the state of our economy in California, I believe that the benefit that plant brings to the community is tremendous.

I truly believe that the environmental document must evaluate all of the relevant issues in a fair and balanced manner.

I look forward to reading the draft environmental document later this year. Thank you in advance for your consideration.

Sir LA/aLffWerneKr, President/CEO North Coast Engineering 725 Creston Road Suite B Paso Robles, CA 93446 ~92rn- ~9