Email from Burritt, Arthur to Balian, Harry, Et Al, Branch 3 Status - 4/23/10
ML102980522
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 04/23/2010
From: Arthur Burritt
NRC Region 1
To: Balian H, Leonard Cline, Joseph Deboer
NRC Region 1
References
FOIA/PA-2010-0334
Download: ML102980522 (1)


Text

Burritt, Arthur From:

Sent:

To:

Cc:

Subject:

Attachments:

Burritt, Arthur C

Friday, April 23, 2010 10:32 AM Balian, Harry; 'Cline, Leonard'; DeBoer, Joseph; Douglas, Christopher; Ennis, Rick; Johnson, Jonathan; Kern, Ludwig; Miller, Ed; Moore, Ross; Patel, Amar; 'Raymond, William';

'Schroeder, Daniel'; Turilin, Andrey; 'Welling, Blake' OHara, Timothy; Conte, Richard; Gray, Harold; Cahill, Christopher Branch 3 Status - 4/23/10 B3-Status 4-23-1 O.doc See attached Key Salem AFW Next Steps:

NRC Next Steps:

Confirm the PSEG risk assessment to delay AFW testing is reasonable - Cahill Confirm the finite element analysis for the unit 1 as found condition is acceptable including the use of appropriate methods and assumptions - Conte/O'Hara/HQ Confirm the technical evaluation that supports 1275 psig is bounding (including a faulted S/G scenario) -

Hansell/Silk Evaluate the Unit 2 AFW extent of condition operability assessment (focus on the differences between Unit 1 & 2) - Schroeder/O'Hara Follow-up on the control air coating concern at the support clamp - O'Hara/Gray Evaluate ongoing AFW piping replacements on Unit 1 - O'Hara Evaluate repairs to the control air system on Unit 1 - O'Hara AFW Information Needs Design records for as installed piping on Unit 1 & 2 (not found as of yet, still looking)

Unit 1 AFW past operability assessment Unit 1 AFW as found condition finite element analysis Unit 2 AFW operability determination 57