Ziev, Tracey From:

OHara, Timothy L\\

Sent:

Friday, April 23, 2010 5:53 PM To:

Burritt, Arthur; Conte, Richard; Gray, Harold; Schroeder, Daniel; Balian, Harry; Cahill, Christopher Cc:

Cline, Leonard; Douglas, Christopher; Lew, David; Clifford, James

Subject:

RE: Salem AFW Priorities/Next Steps

Art, The long term concern should also include PSEG determining the design life of the new coating for completeness.

Tim OHara From: Burritt, Arthur Sent: Friday, April 23, 2010 4:27 PM To: Conte, Richard; OHara, Timothy; Gray, Harold; Schroeder, Daniel; Balian, Harry; Cahill, Christopher Cc: Cline, Leonard; Douglas, Christopher; Lew, David; Clifford, James

Subject:

Salem AFW Priorities/Next Steps Why is Unit 2 Ok Testinq Confirm the PSEG risk assessment to delay AFW testing is reasonable - Cahill Evaluate pressure drop testing resolution Operability Evaluate the Unit 2 AFW extent of condition operability assessment (focus on the differences between Unit 1 & 2) -

Schroeder/O'Hara Confirm the finite element analysis for the Unit 1 as found condition is acceptable including the use of appropriate methods and assumptions - O'Hara/HQ Confirm the technical evaluation that supports 1275 psig is bounding (including a faulted S/G scenario) - complete no concerns What Needs to be Done Prior to Unit Startup Verify hydro/pressure test is code compliant - O'Hara Evaluate the 50.59 for AFW modifications - O'Hara Verify the ANI reviews and accepts repairs including testing - O'Hara Smart samples o

Verify repairs to the control air system elbow that was replaced (how-will PSEG certify the repair) - O'Hara o

Verify control air pipe coating are repaired including at the support clamps (visual check of the as left condition) - O'Hara Long Term Concerns AFW coating cure time acceptability 1l~