MONTHYEARML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/12/2023 ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23122A1982023-05-0202 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeon 5/1/2023 ML23117A2722023-04-17017 April 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 04/14/2023 ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML23033A0302023-02-0808 February 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 1/24/2023 ML23010A2882023-01-10010 January 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 01/09/2023 ML23003A2412023-01-0303 January 2023 NRR E-mail Capture - Final Nvib RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2402022-12-21021 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 ML22357A0102022-12-21021 December 2022 NRR E-mail Capture - Final Nphp RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2392022-12-20020 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeons Collected 12/19/2022 ML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22291A3702022-10-18018 October 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2022-LLR-0066) ML22290A2202022-10-17017 October 2022 NRR E-mail Capture - Final RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22285A1562022-10-12012 October 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Atlantic Sturgeon 10/11/2022 (Bottom Trawl) ML22280A1302022-10-0707 October 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report - Sturgeon 10/06/2022 ML22269A4822022-09-26026 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/23/2022 ML22269A0352022-09-23023 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/22/2022 ML22265A1512022-09-22022 September 2022 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Relocate TS Requirements for Reactor Head Vents to TRM ML22286A2062022-09-14014 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/13/2022 ML22244A0422022-09-0101 September 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Revise and Relocate Reactor Coolant System PT Limits and Pops Limits to PTLR ML22244A1192022-09-0101 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 08/31/2022 ML22206A0262022-07-25025 July 2022 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22206A1032022-07-22022 July 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 07/21/2022 ML22194A0522022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report ML22188A0762022-07-0707 July 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 07/06/2022 ML22187A1482022-07-0606 July 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection - Sturgeon 07/05/2022 ML22199A2432022-06-29029 June 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 06/28/2022 ML22129A0682022-05-0505 May 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report - 2 Sturgeon 05/04/2022 ML22122A0442022-05-0202 May 2022 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Request for Relief from ASME Code Defect Removal for Service Water Buried Piping (L-2022-LLR-0040) 2024-01-10
[Table view] |
Text
. bý Ziev, TraceX From: Turilin, Andrey Sent: Thursday, April 22, 2010 11:58 AM To: Burritt, Arthur; Schroeder, Daniel; Balian, Harry; Cline, Leonard; OHara, Timothy
Subject:
Risk Assessemnt of Missed Surveillance -Salem AFW Discharge Line Underground Piping Attachments: Scan File.pdf 1iP
. I. I ý RM DOCUMENTATION NO. SA-SURV-001 REV: 0 PAGE NO. 1/3 STATION: Salem Nuclear Generating Station UNIT(S) AFFECTED: 2 TITLE: Risk Assessment of Missed Surveillance - Auxiliary Feedwater discharge line underground piping
SUMMARY
(Include UREs incorporated): On 04/21/2010 it was discovered that required ASME Section XI surveillance tests (pressure testing) had not been performed for buried Auxiliary Feedwater piping as required by ER-AA-330-001 and OU-AA-335-015. This condition is documented in Notification 20459689.
A risk assessment of the condition was performed in accordance with procedure ER-AA-600-1045, "Risk Assessments of Missed or Deficient Surveillances." A surveillance deferral time of up to 7 days was evaluated and found to be acceptable. The following are recommended actions. Perform the surveillance as soon as practicable and limit removal of other-risk significant equipment from service consistent with OP-AA-101-112-1002, Rev. 4.
[ Review required after periodic Update
[XI Internal RM Documentation [ ] External RM Documentation Electronic Calculation Data Files:
(Q:\System Engineering\Salem\PRA\Applications\Missed Surveiliance\ SA-SURV-001)
Salem PRA, Revision 4.3; Equipment Out of Service (EOOS), version 3.3a from EPRI Risk and Reliability Workstation.
Method of Review: [ 3 Detailed [ ] Alternate ] Review of External Document This RM documentation supersedes: _in its entirety.
Prepared by: Brad Dolan .__,__,__....
/_ - D / 04/2212010 Print Sign Date Reviewed by: Chris Pupek 0412212010 Print Sign Date Approved by:
Print Sign Date
Introduction On 04/21/2010 it was discovered that buried segments of the AFW discharge lines supplying #22 and #24 Steam generators had not been subjected to surveillance testing as required.
When a required surveillance test is discovered not to have been performed as required, Salem's technical specifications permit either the test to be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or performed at a later time if an assessment of the associated risk is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk is acceptable for the deferral period. This evaluation is provided to support that requirement.
This evaluation was prepared in accordance with Risk Management procedure ER-AA-600-1045, RO, "Risk Assessments of Missed or Deficient Surveillances."
That procedure indicates that if results are acceptable, a risk assessment may be performed which assumes that affected components and systems are unavailable for the period of time from discovery until the surveillance test is performed. That approach was employed here.
There are two potential failure modes which could occur with the buried AFW discharge piping to the #22 and #24 steam generators. The piping could collapse or otherwise obstruct, preventing flow from being delivered to the affected steam generators. It is also possible that the piping could leak or rupture, resulting in a diversion of inventory from the stored supplies maintained for the AFW system.
The function of the AFW discharge lines is to direct auxiliary feedwater to the secondary side of the steam generators. Piping integrity also acts to prevent loss of necessary inventory of auxiliary feedwater supply.
This condition was modeled as follows, using the online (a)(4) EOOS risk assessment model, based on the Salem model of record (v. 4.3).
The paths to the #22 and #24 SGs were failed by setting events AFS-CKV-CC-2AF23 and AFS-CKV-CC04AF23 to failed, using the "BE" feature in the EOOS operators screen.
The potential for loss of inventory was conservatively bounded in this way.
Salem's procedures encourage identification and resolution of events which could cause a loss of inventory. Substantial time exists, on the order of hours, to identify and resolve a problem involving a loss of inventory. So long as ample "infinite" supplies exist, such as from the service water system, a loss of some inventory should not prevent the AFW system from successfully performing its required functions.,
The one circumstance in which it could be more difficult to provide AFW suction supply from an infinite source would be during a station blackout. This was modeled by adding a new OR gate below gate GAN1712 that has inputs %TES,
%TE2 and %TEG. This has the effect of failing the TDAFWP for all losses of offsite power. If onsite AC power supplies sufficient to power an MDAFWP are available, then power should also be available to sufficient service water pumps to provide AFW makeup. If onsite AC power sources are failed, then there is no AFW supply, given this model change. In addition gate TES03 (LOOP and failure of onsite AC power systems) was added below gate GASB 110 to ensure that failure of offsite and onsite AC power would fail all AFW.
This case was quantified using both the A(4) zero-maintenance unavailability and average annual unavailability models. With the A(4) model the CDF increased from 2.21 E-5 to 6.19E-5 and an AOT (to result in an ICCDP of 1 E-6) of 9.2 days resulted. With the average annual unavailability model the CDF increased from 2.25E-5 to 7.16E-5 and an AOT (to result in an ICCDP of 1E-6) of 7.4 days resulted.
A similar set of modifications were made to the average annual unavailability model of record for LERF and it was quantified to confirm that ICCDP was the limiting parameter. LERF increased from a baseline value of 1.18E-6 to 1.57E-6, thus confirming that the CDF calculation is limiting.
Conclusion Deferral of the missed surveillance for a period of up to 7 days is acceptable and results in a negligible increase in risk. All routine or emergent risk assessments should be performed as if the TDAFWP and 22AF23 and 24 AFW valves are unavailable until the surveillance is performed.