ML102980328

From kanterella
Jump to navigation Jump to search
Email from Silk, David to Schroeder, Daniel, Salem Ul Afw
ML102980328
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/19/2010
From: David Silk
Operations Branch I
To: Daniel Schroeder
Reactor Projects Branch 3
References
FOIA/PA-2010-0334
Download: ML102980328 (1)


Text

Schroeder, Daniel From:

Sent:

To:

Subject:

Silk, David

"-1 Monday, April 19, 2010 11:08 AM Schroeder, Daniel Salem Ul AFW I did a little research. Early in TRIP-1 following an SI, both MDAFW pumps should start. If one does not, then the TDAFW pump is started. Therefore the situation that you described, when flow through two AF21's and two AF1 l's converge, can occur early in an event. I attempted to contact Gerry Gauding in training (since I'm working with him for this upcoming exam) but he was not available. I left a message for him to contact me.

Hopefully he can provide information on the AFW pressures and flows in the above situation or how these parameters are controlled/limited. I'll keep you posted. Dave 1./~i