ML102950339
Jump to navigation
Jump to search
| ML102950339 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/03/2010 |
| From: | Ferrer N License Renewal Projects Branch 2 |
| To: | |
| References | |
| Download: ML102950339 (1) | |
Text
1 Ferrer, Nathaniel
Subject:
Phone call on DCPP Draft RAI Sets 3 & 4 Location:
1.866.489.0573 - pass code *8055454160*
Start:
Thu 6/3/2010 1:00 PM End:
Thu 6/3/2010 1:30 PM Show Time As:
Tentative Recurrence:
(none)
Meeting Status:
Not yet responded Organizer:
Soenen, Philippe R This phone call is for DCPP to get clarification on the following draft RAIs:
Set 3 - B2.1.1-1 Set 4 - B2.1.16-3 and B2.1.22-1