Zlev, Tracey From: Burritt, Arthur C2.*

Sent: Thursday, April 29, 2010 5:17 PM To: OHara, Timothy; Conte, Richard; Gray, Harold; Balian, Harry; Cline, 'Leonard; DeBoer, Joseph; Douglas, Christopher; Ennis, Rick; Johnson, Jonathan; Kern, Ludwig; Miller, Ed; Moore, Ross; Patel, Amar; Raymond, William; Schroeder, Daniel; Turilin, Andrey; Welling, Blake

Subject:

Branch 3 Status 4/29/10 Attachments: B3-Status 4-29-10doc See attached The following are the remaining open AFW inspection questions as of a few days-ago

  • Verify hydro/pressure test is code compliant - O'Hara, determined approach was acceptable, received test records but still needs to verify test results. PSEG will also provide the leak check procedure by 4/27 am.

Smart samples o Verify repairs to the control air system elbow that was replaced (how will PSEG certify the repair) -

O'Hara, PSEG adding more detail to description of document, to provide by 4/27 PM o Verify control air extent of condition - O'Hara o Backfill procedure reviews to verify coating and backfill cure times - O'Hara, PSEG to provide by 4/27 pm o Verify control air clamping material - O'Hara, PSEG to provide supporting document 4127 am o AFW pipe weld records - O'Hara, PSEG to assess status'of documents by 4/27 pm

  • Design records for as installed AFW piping on Unit 1 & 2 not found h*Mnewm n Intftusrexd was fetww In accordance wfth the rJo~e Einmpiions IMM"M- d 171S~ 1 A-tc)03

p 0t Y 4

Outside of Scope BRANCH 3 DAILY 4/29/10 STATUS Highlighted items were discussed at DRPIDRS Coordination meeting T..

Outside OTScope BOLD items are new W,,,, Coerae7Da Af666,7-X>O 'AL2=2of3>O.11L: AL3=IX>io.J7N3 AFW follow-up issues

  • Verify hydro/pressure test is code compliant - O'Hara, determined approach was acceptable, received test records but still needs to verify test results. PSEG will also provide'the leak check procedure 4127 am.
  • Evaluate the 50.59 for AFW modifications - Scroeder reviewed no significant technical concerns or Issues
  • Smart samples o Verify repairs to the control air system elbow that was replaced (how will PSEG certify the repair) - O'Hara, PSEG adding more detail to description of document, to provide by 4127 PM o Verify control air extent of condition - O'Hara o Backfill procedure reviews to verify coating and backfill cure times - O'Hara, PSEG to provide by 4/27 pm o Verify control air clamping material - O'Hara, PSEG to provide supporting document 4/27 am o AFW pipe weld records - O'Hara, PSEG to assess status of documents by 4/27 pm Degraded Equipment
  • Design records for as installed AFW piping on Unit 1 &2 not found Outside of Scope

Outside of Scope U*nit 2 AFW Testinq - PSEG determined that they did not perform ASME code required pressure drop test for the buried sections of the S22 and 24 headers.

9 Confirm the PSEG risk assessment to delay AFW testing for 1 year is reasonable - Cahill, complete, no concerns

  • Evaluate if performing a risk assessment to meet Technical Specification 4.0.5 is appropriate if a test was never performed verses missed - Conte/Ennis - discussions ongoing, no apparent ongoing compliance issues.

Operability, Initial assessment Unit 2 was that it is in better condition based on newer piping; 1994 inspection that identified intact coating; and ISI code gives more allowance to an operating unit (can take credit for up to 90% of the yield Stress).

  • Evaluate the Unit 2 AFW extent of condition operability assessment - Schroeder no significant technical issues or A concerns 4 Confirm the finite element analysis for the Unit 1 as found condition is acceptable including the use of appropriate methods and assumptions - Gray, O'Hara, and HQ reviewed, no significant technical issues or concerns Outside of Scope

~A0.0onavi iteMS Ulu L!Status Board Items:

Salem 1, AFW buried piping generic communications Outside of Scope t

Outside of Seope 2