Conte, Richard From:
Sent:
To:
Cc:
Subject:
Conte, Richard Wednesday, April 28 2010 7:21 AM Ashley, Donnie; Balian, Harry; Brown, Michael; Burritt, Arthur;, Cahill, Christopher; Chemoff, Harold; Gardocki, Stanley; Gray, Harold; Hardies, Robert; Hoffman, Keith; Holston, William; Lupold, Timothy; Modes, Michael; OHara, Timothy; Pelton, David; Robinson, Jay; Sanders, Carleen; Schmidt, Wayne; Schroeder, Daniel; Thorp, John Roberts, Darrell; Clifford, James; Lew, David Confernece Call to Go Over Statue of Salem Unit I and 2 AFW Issues FW: Conference Details (APR 28, 2010-12:30 PM ET-Conf# 7623961)
- Below summary is how to get in on conference - 245 to 400pmn SThe conference is set up for most of the afternoon but I would like to actually start at 245pm due to Tim O'hara and my availability and Tim Luppold needs to go on to another conference at 330, 1 want the Component S
Integrity view of the the FEA done first, iI tried to summarize the TS discussion from yesterday below - I will also this email on a appointment in outlook calendars for the key internal stakeholders.
Purpose is to discussion completion status and major issues associated with documents to date related to operability and structural integrity issues related to the degraded piping found at Unit 1 and implications to Unit 2,
Success is mutual understanding for each document:
-discuss any immediiate safety concerns
- give completion status or additional needs like* the document should not be draft along with next steps
- discuss major concerns related to operability and structural integrity of each unit's AFW headers past or future as applicable
-summarize other notes or issues that you feel should be addressed - ensure we have an email on details.
Lupold - Finite Element Analysis on the replaced section of No. 14 and No. 12 headers in the yard are.
/
- i) Lupold -Technical Evaluation supporting the reduction in design pressure to 1275psi\\tJf.
J
- Y' ContelBurritt/EnnislLupold - Summarize applicable TS unit 2 in light of information form Unit I - willneed to
- document decision from yesterday
-Failure to do code pressure drop test for buried pipe violates TS 4.0.5
-which leads to TS 4.0.1 failure to do ST so take action of the applicable LCO
-(AND can't take exception of TS 4.0.3 since test was never done - see Ennis email form yesterday),
,* -leads to TS 3.4.11 on Class 3 structural integrity section c - restore structural integrity or isolate component
-(evaluation of structural integrity may be acceptable without code relief assuming test and inspections will be done in a reasonable time frame)
-LCO for AFW TS 3.7.1.2 (3 operable flow paths) not entered - data from Jan 2010 indicates the ability to deliver required flow through headers as noted in risk assessment - basis for 1.25 year exposure time on risk
"*t assessment assuming failed headers Nos. 24 and 22.
Cahill -Risk Asssessment completed per TS 4,0.3 - might not have been needed but it may have.informational value
- i Ohara/Schroeder - Unit 2 Operability Determination O'Hara/Schroeder - 10 CFR 50,59 supporting the repairs to Unit 1 including pressure test results and ANI reviews h t~lýoto I" this recoto was ale~atoo 5n
£ a 0O*.n c W ft t h F r e e d o m o f In f o r m a ti o n A c t.
O'Hara - any documentation supporting the Control Air as left situation OHara/Schroeder - past Unit Operability - distinguish yard area supported by finite element analysis vs buired section in FHB.
All - summary evaluation of structural integrity for Unit 2.
All-longer term
- coating cure time issues in Unit 1 and related limitations
- when will Unit 2 test and inspections be complete - more importantly how
- generic implications - next steps - code pressure drop/unabated flow test, TS 40.3 interpretaion, others?
We won't be serving dinner so we need to get done by 430 ideally 400pm, From:, Bearde, Diane Sent: Tuesday, April 27, 2010 2:59 PM To: Conte, Richard
Subject:
FW: Conference Details (APR 28, 2010--12:30 PM ET--Conf# 7623961)
Summary:
ial I 1-80M-62-!4!
asscode:(b)2)
Lines Avai.
A.i Confirmation No, 522272 From: confirmations@mymeetings.com [1]
Sent:Tuesday, April 27, 2010 2:58 PM To: Bearde, Diane
Subject:
Conference Details (APR 28, 2010--12:30 PM ET--Conf# 7623961)
Your conference details are enclosed.
Meetina Information:
Leader Phone number:
Contact:
Phone number:
Call date:
Call time:
Duration:
Service level:
Number of lines:
MS DIANE BEARDE 1-610-337-5153 MR TYRONE DANTLEY 1-301-415-7026 APR-28-2010 (Wednesday) 12:30 PM EASTERN TIME 4 hr Unattended Total=12 Dialout=-0 Meet Me=12 Meet Me Toll=0 2
Confirmation number:
7623961 Company:
FTS-NUCLEAR REGULATORY COMMISI CRC:
Passcodes/Pin codes?
Participant passcode: (2 For security reasons, the passcode will be required to join the call.
Dial in numbers:
Freephonei Country Toll Numbers Toll Free NumbeV r
I USA
- I 0-2184!S Restrictions may exist when accessing freephoneltoll free numbers using a mobile telephone.
In-Conference Features:
All participants must use a touch-tone phone to participate in an Audio Conference. The following features are available for you to use on your phone during an active conference:
+ Press *0 operator assistance (small fee may apply)
+ Press *6 mute/unmute individual line Selected Conference Features:
Audio Tones Leaders can schedule, modify or cancel a reservation by using e-Scheduling, our online reservation tool. To reschedule or cancel this reservation, click here.
For additional assistance, contact customer service at 877-855-4797 The Conferencing Center would like to send you e-mail notes to keep you informed of new or enhanced products and services, conferencing tips. or special offers, etc. If you would prefer not to receive these messages, you may unsubscribe now. Thank you.
3