E-Mail from Tsao to Evans, Salem - Status of Buried AFW Pipe as of 5/4/10
ML102940100
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/04/2010
From: John Tsao
Office of Nuclear Reactor Regulation
To: Marilyn Evans, Timothy Lupold, Rosenberg S
Office of Nuclear Reactor Regulation
References
FOIA/PA-2010-0334
Download: ML102940100 (3)


Text

Ennis, Rick From: Tsao, John \

Sent: Tuesday, Mby 04, 2010 10:42 AM To: Evans, Michele; Rosenberg, Stacey; Lupold, Timothy; Hardies, Robert; Alley, David; Manoly, Kamal Cc: OHara, Timothy; Ennis, Rick

Subject:

Salem--status of buried AFW pipe as of 5/4/10 Fyi-Tim O'Hara provided the latest status of the buried AFW pipe at Salem. See his email below. Tim noted that the information below is pre-decisional.

Thanks.

John From: OiHara, TImoh Sent: Tuesday, May 04, 2010 9:21 AM To: Tsao, John Cc: Conte, Richard

Subject:

RE: Salem--PSEG calcs

John, Presently, PSEG has committed to inspecting Unit 2 in the next outage, spring 2011. However, we did inform them last week that they need a structural integrity evaluation for Unit 2, not just an operability evaluation.

We will probably just debrief from the ISI tomorrow and leave the inspection open for several specific items which PSEG has not addressed. At present I believe there will be a violation for not performing the IWA-5244 required pressure tests for both Unit 1 and 2. We are evaluating several other issues for enforcement.

Tim OHara From: Tsao, Joh Sent: Tuesday, May 04, 2010 6:52 AM To: OHara, Timothy

Subject:

Salem--PSEG calcs

Tim, Thanks. By the way, what is the status of your inspection for the Salem units? When is your exit meeting?

You are going to give the licensee some sort of violation for Unit 2? Do you think the licensee will dig up some portion of unit 2 buried AFW piping and inspect in the next refueling outage?

John From: OHara, Timoth Sent: Monday, May 03, 2010 3:42 PM To: Manoly, Kamal; Tsao, John Cc: Lupold, Timothy; Conte, Richard

Subject:

FW:

Kamal & John, b: wkn in mlreWord was WSWi 000rao~Mae Wfh the Freefnotkom uftn*.

Attached is the PSEG calc. which goes with the SAI analysis.

Tim OHara From: Berrick, Howard G. [mailto: Howard. Berrick@pseg.com]

Sent: Monday, May 03, 2010 3:26 PM To: OHara, Timothy

Subject:

FW:

Calculation 6S0-1882 R1 attached Howard Berrick PISEG NVuclear LLC Salem Regulatory Assurance PSEG Nuclear - Salem Generating Stations (W) 856-339-1862 (Fax)8 (BPr)['(b)(6*

2

Received: from HQCLSTR02.nrc.gov ([148.184.44.77]) by OWMS01.nrc.gov

([148.184.100.43]) with mapi; Tue, 4 May 2010 10:42:06 -0400 Content-Type: application/ms-tnef; name="winmaildat" Content-Transfer-Encoding: binary From: "Tsao, John" <John.Tsao@nrc.gov>

To: "Evans, Michele" <Michele. Evans@nrc.gov>, "Rosenberg, Stacey"

<Stacey. Rosenberg@nrc.gov>, "Lupold, Timothy" <Timothy.Lupold@nrc.gov>,

"Hardies, Robert" <Robert.Hardies@nrc.gov>, "Alley, David"

<David.Alley@nrc.gov>, "Manoly, Kamal" <Kamal.Manoly@nrc.gov>

CC: "OHara, Timothy" <Timothy.OHara@nrc.gov>, "Ennis, Rick"

<Rick.Ennis@nrc.gov>

Date: Tue, 4 May 2010 10:42:04 -0400

Subject:

Salem--status of buried AFW pipe as of 5/4/10 Thread-Topic: Salem--status of buried AFW pipe as of 5/4/10 Thread-Index:

Acrq9BpM R9tdtOOFTe KYVSXO4srbuwAAiONwAACOlyAAH7AKwAAFLWIwAALXVYA=

Message-ID: <E09C30551FD42442BA284ECF9858105F4059817BAE@HQCLSTRO2.nrc.gov>

Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach:

X-MS-Exchange-Organization-SCL: -1 X-MS-TNEF-Correlator:

<E09C30551 FD42442BA284ECF9858105F4059817BAE@HQCLSTRO2.nrc.gov>

MIME-Version: 1.0