|
---|
Category:Design Control Document (DCD)
MONTHYEARML20007E3432019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 12 - Radiation Protection ML20093F5252019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 05 - Reactor Coolant System and Connected Systems M200041, GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 05 - Reactor Coolant System and Connected Systems2019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 05 - Reactor Coolant System and Connected Systems ML20007E3252019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Tier 1 ML20007E3262019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Tier 2 - Table of Contents ML20007E3272019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 01 - Introduction and General Description of Plant ML20007E3282019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 02 - Site Characteristics ML20007E3322019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 04 - Reactor ML20007E3342019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 05 - Reactor Coolant System and Connected Systems ML20007E3352019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 06 - Engineered Safety Features ML20007E3362019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 07 - Instrumentation and Control Systems ML20007E3372019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 08 - Electric Power ML20007E3382019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 09 - Auxiliary Systems ML20007E3402019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 10 - Steam and Power Conversion System ML20007E3422019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 11 - Radioactive Waste Management ML20007E3702019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 8 ML20007E3442019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 13 - Conduct of Operations ML20007E3452019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 14 - Initial Test Program ML20007E3482019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 15 - Accident and Analysis ML20007E3492019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 16 - Technical Specifications ML20007E3512019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 16 - Technical Specifications Bases ML20007E3522019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 17 - Quality Assurance ML20007E3542019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 18 - Human Factors Engineering ML20007E3592019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 20 - Question and Response Guide ML20007E3612019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 1 ML20007E3622019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 2 ML20007E3632019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 3 ML20007E3652019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 4 ML20007E3662019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 5 ML20007E3682019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 6 ML20007E3692019-12-20020 December 2019 GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 7 ML1029204832010-12-31031 December 2010 ABWR STP Aircraft Impact Assessment (Aia) Amendment, Rev. 3. Introduction 2019-12-20
[Table view] |
Text
ABWR Design Control Document ABWR STP Aircraft Impact Assessment Amendment Revision 3 Copyright @ 2010 STP Nuclear Operating Company All Rights Reserved The design, engineering, and other information contained in this document have been prepared by or on behalf of the STP Nuclear Operating Company (STPNOC) in connection with its application to the United States Nuclear Regulatory Commission (NRC) for amendment of the design certification of the ABWR nuclear plant design pursuant to Title 10, Code of Federal Regulations Part 52, Appendix A. No use of or right to copy any of this information other than by the NRC and its contractors in support of STPNOC's application is authorized.
The information provided in this document is an amendment and a subset of a much larger set of know-how, technology and intellectual property rights pertaining to standardized, modularized, nuclear powered, electric generating facilities that utilize a minimum of active components, referred to as the ABWR STP Aircraft Impact Assessment Amendment Revision 3. Without access and a grant of rights to that larger set of know-how, technology and intellectual property rights, this document is not practically or rightfully usable by others, except by the NRC as set forth in the previous paragraph.
For information address: STP Nuclear Operating Company Scott Head 4000 Avenue F Bay City, TX 77414