ML102790124

From kanterella
Jump to navigation Jump to search
Issuance of the Core Operating Limits Report for Reload 18, Cycle 19, Revision 6
ML102790124
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/01/2010
From: Armstrong J
Exelon Nuclear, Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML102790124 (1)


Text

Exek~a.

Exelon Nuclear Peach Bottom Atomic Power Station 1848 Lay Rd.

Delta, PA 17314 www.exeloncorp.com Nuclear PBAPS TS 5.6.5.d October 1, 2010 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington DC 20555-0001 Peach Bottom Atomic Power Station, Unit 2 Facility Operating License No. DPR-44 NRC Docket No. 50-277

Subject:

Issuance of the Core Operating Limits Report for Reload 18, Cycle 19, Revision 6 Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 2, Reload 18, Cycle 19, Revision 6. Revision 6 of this report incorporates the revised cycle specific parameters resulting from the new core configuration implemented during the PBAPS, Unit 2 refueling outage.

This COLR is being submitted to the NRC in accordance with PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d. contains information proprietary to Global Nuclear Fuel. Global Nuclear Fuel requests that the document be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4). An affidavit supporting this request is also contained in Attachment 1. Attachment 2 contains a non-proprietary version of the Global Nuclear Fuel document.

Should you have any questions concerning this letter, please contact Ron Smith at (717) 456-3628.

Respectfully, James M. Armstrong Regulatory Assurance Manager Peach Bottom Atomic Power Station, Units 2 and 3 Attachments:

1) Core Operating Limits Report for Reload 18, Cycle 19, Revision 6 -

Affidavit and Proprietary Version

2) Core Operating Limits Report for Reload 18, Cycle 19, Revision 6 - Non -

Proprietary Version cc:

W. M. Dean, Regional Administrator, Region I, USNRC F. L. Bower, USNRC Senior Resident Inspector, PBAPS J. D. Hughey, USNRC Project Manager, PBAPS transmitted herewith contains Proprietary Information.

When separated from this attachment, this transmittal document is decontrolled.

Auo