Memorandum of Closure, Case No. 4-2009-061
ML102740531
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/11/2010
From: Holland C
NRC/OI/RGN-IV/FO
To: Collins E
Region 4 Administrator
References
4-2009-061, FOIA/PA-2010-0245, RIV-2009-A-0091
Download: ML102740531 (3)


Text

'90 ". UNITED STATES 0 NUCLEAR REGULATORY COMMISSION 4 , .OFFICE OF INVESTIGATIONS FIELD OFFICE. REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON,TEXAS 76011-4125 January 11, 2010 MEMORANDUM: Elmo E. Collins, Regional Administrator Region IV FROM: Crystal D. Holland, Director Office of Investigations Field Office, Region IV

SUBJECT:

COLUMBIA GENERATING STATION - FAILURE BY A CONTRACT SUPERVISOR TO ADHERE TO ALARA REGULATIONS (01 CASE NO. 4-2009-061/RIV-2009-A-0091)

(b)(7)(C)

On July 12, 2009. 7 _=with Williams Plant Services (WPS) at Energy Northwest's Columbia Generating Station (CGS), Richland, Washington, contacted the U.S. Nuclear Regulatory Commission (NRC) via e-mail to report a concern regarding a WPS supervisor at CGS ordering an (b)(7)(c)nore ALARA (As Low As Reasonably Achievable) reaulations. Accordina t while performing work in the dry well, (b)(7)(C) PS was rotating a group of contractors through the dry well to ita n ALARA.( . Csai C L

7(b)(7)(C) _

  • J ito
  • (b)ý(7)(C) use the same employees l(b)(7)(C) in the dry well until the job was complete.( stated that when he informed( "of the ALARA policy,l(b)(7)(C) isregarded the information, stating the workers would stay in the dry well until the job was complete, regardless of the ALARA policy.

-1c, On Auaust 3.2009, a Region IV(RIV) Allegation Review Board (ARB) met to discuss (b)(7)(c) ýIlegation aý rpriiesterltIat the Office of Investigations, RIV, initiate an investigation to determine ij(.. 7... _1willfully failed to adhere to ALARA requirements during the work in the dry well (Exhibit 1).

On August 26, 2 0 0 9 , (b)(7)(C) was interviewed by 01 regardin the concerns that he had previously raised to the NC*. ()( ,1 testified that althou h7((7)(c) wanted to keep the same em Ioyees in the dry well until the work was finished ()7() isrce 1(b)(7)(C) otate people through t P- drywelinoder to keep the dose as 10 sible(b)(7)(c) noted that even thoug ii-72 lwas upset at this decision, he (b)(7)(c) continued the rotation until the assignment was complete (Exhibit 2).

The transcript o (b)(7)(C) testimony was subsequently provided to RIV Allegations to determine if there was a violation of NRC regulations. After reviewing the transcript, RIV Reactor Projects Branch and Radiation Protection advised that no additional concerns were identified and there were no violations of regulatory or licensee requirements (Exhibit 3).

E. Collins 2 No further action was requested by RIV staff; therefore, this investigation is hereby closed.

Should any new information develop specific to conduct or actions involving willfulness or wrongdoing, OI:RIV will consider initiating supplementary investigative action as deemed appropriate.

Enclosure:

Exhibit(s) 1-3 cc w/enclosure:

R. Zimmerman, OE cc W/o enclosure:

C. Marco, OGC E. Leeds, NRR (Attn: G. Cwalina, OAD, NRR)

E. Collins 2 No further action was requested by RIV staff; therefore, this investigation is hereby closed.

Should any new information develop specific to conduct or actions involving willfulness or wrongdoing, OI:RIV will consider initiating supplementary investigative action as deemed appropriate.

Enclosure:

Exhibit(s) 1-3 cc w/enclosure:

R. Zimmerman, OE cc w/o enclosure:

C. Marco, OGC E. Leeds, NRR (Attn: G. Cwalina, OAD, NRR)

Distrubution:

s/f (4-2009-061) c/f N. Crouch, Ol:HQ DOCUMENT: S:\OI\FY2009CASES\Closed Cases

'~OFFICE dl:K01RIV,, A7I+~~~~

NAME JJFerich A, #-' CHolland c- I DATE e,//// IzZi/1 Z)////*q../

OFFICIAL RECORD COPY