Email Regarding Corrected Replacement TS Proposed, Typed Page 2.3-2 for Surry Dnbcolr LAR
ML102720338
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/28/2010
From: Cotton K
Plant Licensing Branch II
To: Thorpe A
Office of Nuclear Reactor Regulation
Cotton K, NRR/DORL, 301-415-1438
References
Download: ML102720338 (2)


Text

From:

Cotton, Karen Sent:

Tuesday, September 28, 2010 12:18 PM To:

Thorpe, April

Subject:

FW: Corrected Replacement TS Proposed, Typed Page 2.3-2 for Surry DNB/COLR LAR Attachments:

img-9220905-0001.pdf; Revised TS page 2.3-3.pdf

April, Also, please put this in ADAMS.
Thanks, Karen Karen Cotton NRR/DORL PM - Surry Units 1 and 2 Karen.Cotton@nrc.gov 301-415-1438 From: Gary D Miller [1]

Sent: Wednesday, September 22, 2010 2:41 PM To: Cotton, Karen Cc: Brian L Mount; Candee Lovett

Subject:

Corrected Replacement TS Proposed, Typed Page 2.3-2 for Surry DNB/COLR LAR

Karen, By letter dated October 16, 2009 (Serial No.09-581), Dominion requested amendments, in the form of changes to the Technical Specifications (TS), to Facility Operating License Numbers DPR-32 and DPR-37 for Surry Power Station Units 1 and 2, respectively. The proposed changes included the relocation of specific core operating limits (e.g.,

reactor core safety limits, Overtemperature T and Overpower T setpoints, and Departure from Nucleate Boiling (DNB) parameter limits) currently contained in the TS to the Core Operating Limits Report (COLR), and added two COLR references. Dominion recently identified that the typed, proposed TS page 2.3-3 differed from the marked-up proposed TS page 2.3-3 in one location. Specifically, the proposed typed TS page included the following term:

[*] / °F for decreasing Tavg. The actual term should be written as: [*] / °F for increasing Tavg. The term is correctly stated in the marked-up TS page provided in the October 16, 2009 submittal. Please replace the proposed, typed TS page 2.3-3 provided in the October 16, 2009 submittal with the revised TS page 2.3-3 attached. Also attached is a mark-up page to more clearly show you what changed.

Gary D. Miller, P.E.

Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

(804) 273-2771 or tie-line 8-730-2771 fax (804) 273-3715 gary.d.miller@dom.com

CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.

E-mail Properties Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0297C4BF629)

Subject:

FW: Corrected Replacement TS Proposed, Typed Page 2.3-2 for Surry DNB/COLR LAR Sent Date: 9/28/2010 12:18:05 PM Received Date: 9/28/2010 12:18:05 PM From: Cotton, Karen Created By: Karen.Cotton@nrc.gov Recipients:

April.Thorpe@nrc.gov (Thorpe, April)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 55168 9/28/2010 img-9220905-0001.pdf 21992 Revised TS page 2.3-3.pdf 14048 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: