ML102650529
Letter Sequence Other | |
---|---|
TAC:L24350, (Open) | |
Initiation
Administration | |
MONTHYEARML1005601752010-02-18018 February 2010
[Table View]Independent Spent Fuel Storage Installation - Response to Request for Additional Information for License Amendment Request No. 9 Project stage: Response to RAI ML1009504502010-03-31031 March 2010 Calculation NUH32P+.0203, Revision 0, 32P+ Transfer Cask Impact Onto the Concrete Pad LS-DYNA Analysis (80 Inch End Drop), Attachment 1 Project stage: Other ML1009504492010-03-31031 March 2010 Independent Spent Fuel Storage Installation - Supplemental Information Related to License Amendment Request No. 9 Project stage: Supplement ML1026505292010-09-22022 September 2010 9/22/10 E-Mail to P. S. Furio from J. Goshen Calvert Amendment 9 Tech Specs Page 5 Project stage: Other 2010-03-31 |
ML102650529 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs ![]() |
Issue date: | 09/22/2010 |
From: | Goshen J NRC/NMSS/SFST/LID/LB |
To: | Furio P Constellation Energy Group |
Goshen, JM, NNSS/SFST, 492-3325 | |
References | |
TAC L24350 | |
Download: ML102650529 (2) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:E-Mail
MONTHYEARML24012A0492024-01-11011 January 2024
[Table view]Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23304A0152023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Calvert Cliffs 1 & 2 - Exemption from Security Rule (L-2023-LLE-0033) ML23181A0732023-06-30030 June 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs TSTF-59A ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML23080A1002023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Repair Replacement of Saltwater System Buried Piping ML23080A0672023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Unit 1 - LAR to Modify the Long-Term Coupon Surveillance Program ML23026A1332023-01-26026 January 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Deletion of License Condition for Decommissioning Trust LAR ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22091A2392022-04-0101 April 2022 NRR E-mail Capture - Calvert Cliffs - Formal RAI for Proposed Alternative for Examinations of Certain Pressurizer Welds ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22091A2402022-03-23023 March 2022 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 03/22/2022 ML22075A1912022-03-16016 March 2022 NRR E-mail Capture - Acceptance for Review of Proposed Alternative Repair Method for Buried Class 3 Saltwater System Piping ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22059B0602022-02-28028 February 2022 Change to Review Schedule Regarding Proposed Alternative for Various Pressurizer Welds ML22060A0172022-02-23023 February 2022 NRR E-mail Capture - Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Withdraw of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21281A1402022-01-14014 January 2022 Acceptance for Review of Proposed Alternative ISI-05-018 for Examinations of Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A5712021-10-22022 October 2021 NRR E-mail Capture - Acceptance for Review of Proposed Alternative ISI-05-019 for Pressure Testing of Certain Portions of ASME Section XI Class 2 Auxiliary Feedwater Piping ML21287A0322021-10-13013 October 2021 Request for Additional Information Re Proposed Alternative for Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21286A5902021-10-0505 October 2021 Acceptance for Review of Proposed Alternative ISI-05-017 for Examinations of Examination Category C-B Steam Generator ML21287A0932021-10-0505 October 2021 Request for Additional Information: Calvert Cliffs 1 & 2 LAR to Revise Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Basis (EPID L-2021-LLA-0112) (Email) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21214A0202021-08-0909 August 2021 License Amendment Request to Change Spent Fuel Pool Cooling Design Basis ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21201A0482021-07-19019 July 2021 Acceptance of Requested Licensing Action to Change Spent Fuel Pool Cooling Design Basis ML21180A1562021-06-28028 June 2021 Request for Additional Information Regarding License Amendment Request Concerning Containment Sump ML21152A1232021-06-0101 June 2021 Acceptance for Review of Proposed Alternative ISI-05-016 Involving Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (EPID L-2021-LLR-0037) (Email) ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21022A0092021-01-21021 January 2021 Request-Calvert Cliffs-Exelon Generation Co., LLC ML20352A3802020-12-17017 December 2020 Acceptance of Requested Licensing Action to Add Containment Sump Technical Specifications ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting 2024-01-11 Category:Technical Specifications MONTHYEARML23158A1952023-08-30030 August 2023
[Table view]R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V ML22067A0772022-03-31031 March 2022 Correction of License Amendment Nos. 337 and 315 to Revise Response Time Testing Definition ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19165A2472019-08-26026 August 2019 Issuance of Amendment Nos 330 and 308 Relocation and Consolidation the Emergency Operations Facility and Joint Information Center for the Calvert Cliffs Nuclear Power Plant ML18365A3732019-01-22022 January 2019 Issuance of Amendment Nos. 328 and 306 to Extend Completion Time of Required Action D.3 of Technical Specification 3.8.1 to 14 Days ML18270A1302018-10-30030 October 2018 Issuance of Amendment Nos. 326 and 304 to Add Risk-Informed Completion Time Program ML17129A5062017-05-12012 May 2017 Plants, Units 1 and 2 - Correction to Technical Specification Pages 1.1-2, 1.1-3, and 1.1-4 to Correct Errors Introduced During the Issuance of Amendment Nos. 286 and 263 ML15352A1642016-03-17017 March 2016 Calvert Cliffs, Units 1 & 2 and Independent Spent Fuel Storage Installation; Nine Mile, Units 1 & 2 and R. E. Ginna - Issuance of Amendments Regarding the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel ML15279A1912015-12-30030 December 2015 Issuance of Amendment Revision to Pressurizer Safety Valve Technical Specifications ML15211A0052015-08-17017 August 2015 Amendment Adoption of TSTF-425, Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML15223B2502015-08-14014 August 2015 and Nine Mile Point Nuclear Station, Unit No. 2- Copy of License Amendment Nos. 313, 291, 118, and 150 ML15161A3802015-07-30030 July 2015 R. E. Ginna and Nine Mile Point, Unit 2 - Issuance of Amendments Regarding Implementation of Technical Specification Task Force Traveler 523, Generic Letter 2008-01, Managing Gas Accumulation (TAC Nos. MF4405 - MF4409) ML15133A1442015-07-23023 July 2015 Amendment Regarding New Technical Specification 3.7.18 for Atmospheric Dump Valves ML15154A6612015-07-16016 July 2015 Amendment License Amendment Request to Extend Containment Leakage Rate Test Frequency ML14307A8422015-01-14014 January 2015 Issuance of Amendment Regarding the Adoption of Technical Specification Task Force (TSTF) 426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO (Limiting Condition of Operation) 3.0.3 ML14280A5222014-10-21021 October 2014 Amendment Enhancements to Diesel Generator Surveillance Requirements (Tac Nos. ME9832 and ME9833) ML14239A4912014-10-21021 October 2014 Issuance of Amendments Regarding the Adoption of Technical Specification Task Force 501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (TAC Nos. ME9794-95) ML14153A5622014-05-30030 May 2014 Response to Request for Additional Information Regarding Enhancements to Diesel Generator License Amendment Request ML14091A2972014-04-0101 April 2014 Issuance of Amendments to Conform the Renewed Facility Operating Licenses and Materials License to Reflect the Direct Transfer of Operating Authority (TAC Nos. MF2584, MF2585, and L24780) ML13308A3872013-10-31031 October 2013 Application for Technical Specification Improvement to Adopt TSTF-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. ML13030A1332013-01-28028 January 2013 License Amendment Request Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML1134104612012-01-11011 January 2012 Amendment Technical Specification Task Force Traveler 487-A, Revision 1, Relocate DNB Parameters to the COLR ML1129406452011-12-20020 December 2011 Technical Specification Interpretation for Calvert Cliffs Nuclear Power Plant Units 1 & 2 on Limiting Condition for Operation (LCO) Applicability (LCO) 3.0.5 ML1103902242011-02-18018 February 2011 License Amendment, Transition from Westinghouse Nuclear Fuel to Areva Nuclear Fuel ML1030101702010-10-25025 October 2010 License Amendment Request: Revision of Limiting Condition for Operation 3.0.5 ML1026505292010-09-22022 September 2010 9/22/10 E-Mail to P. S. Furio from J. Goshen Calvert Amendment 9 Tech Specs Page 5 ML1026605642010-09-17017 September 2010 Technical Specification Bases, Revisions 38 & 39, Section B 3.8 - Electrical Power Systems ML1009700702010-04-0505 April 2010 License Amendment Request: Section 5.0, Administrative Controls, Personnel Title Revisions & Administrative Changes ML0933500992009-11-23023 November 2009 License Amendment Request - Transition from Westinghouse Nuclear Fuel to Areva Nuclear Fuel ML0827603842008-10-0101 October 2008 Attachment 2, Marked Up Tech Spec Pages for License Amendment Request: Reporting of Reactor Vessel In-Service Inspection Information and Analyses in Support of Code Relief Request for Extension of Reactor Vessel.. ML0824706232008-08-29029 August 2008 License Amendment Request: Appendix K Measurement Uncertainty Recapture - Power Uprate Request ML0824106932008-08-28028 August 2008 Attachment (2), Marked Up Technical Specification Pages for License Amendment Request: Application for Technical Specification Change TSTF-491 ML0824806762008-08-27027 August 2008 License Amendment Request: Replacement of the Trisodium Phosphate Buffer with a Sodium Tetraborate Buffer, Attachment (2) Markup of Technical Specifications Pages ML0821104652008-07-29029 July 2008 Technical Specifications, Amendment Regarding Control Room Habitability ML0816503472008-06-11011 June 2008 Additional Information Control Room Habitability ML0805303882008-03-24024 March 2008 Units, 1 and 2 - Tech Spec Pages for Amendments 285 and 262 Addition of Limiting Condition of Operation 3.0.8 for Inoperable Snubbers ML0732004702007-12-20020 December 2007 Tech Spec Pages for Amendment Nos. 283 and 260 Use of Lead Fuel Assemblies and Change to Core Operating Limits Report Analytical Methods ML0734706402007-12-13013 December 2007 Supplement to Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0724202032007-08-29029 August 2007 Tech Spec Pages for Amendments 281 and 258 Implementation of Alternative Radiological Source Term ML0712703712007-05-0202 May 2007 License Amendment Request Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML0712002852007-04-25025 April 2007 Technical Specifications 3.1 and 3.2, Appendix B, Reporting Related to National Pollutant Discharge Elimination System (NPDES) Permit ML0708701102007-03-22022 March 2007 Request for Additional Information Regarding Implementation for Alternative Source Term ML0706103572007-02-27027 February 2007 License Amendment Request: Change to the Core Operating Limits Report Analytical Methods List ML0706104142007-02-27027 February 2007 License Amendment Request: Use of Lead Fuel Assemblies ML0703305992007-02-0101 February 2007 License Amendment Request: Revise Containment Sump Surveillance Requirement to Verify Strainer Integrity ML0632500502006-11-16016 November 2006 License Pages and Technical Specifications, Calvert Cliffs Units 1 & 2 2023-08-30 |
Text
Goshen. John From: Goshen, John Sent: Wednesday, September 22, 2010 11:25 AM To: 'Furia, Patricia S'
Subject:
Emailing: calvert amendment 9 tech specs pg 5.pdf Attachments: calvert amendment 9 tech specs pg 5.pdf Pat, please replace the pg 5 of 13 TS transmitted in the September 14, 2010, Amd 9 transmittal letter with the attached. This corrects an editorial error on the original. Call me if you have any questions. Thanks, John Goshen, P.E.
Project Manager NMSS/SFST/LB Ph (301) 492-3325 Fax (301) 492-3345 Cell (301) 462-9833 john.goshen@nrc.gov 1
3/4.1 FUEL TO BE STORED AT ISFSI LIMITING CONDITION FOR OPERATION 3.1.1 The spent nuclear fuel to be received and stored at the Calvert Cliffs ISFSI shall meet the following requirements:
(1) Only fuel irradiated at the Calvert Cliffs Units 1 or 2 may be used. (14 x 14 CE type PWR Fuel)
(2) Maximum initial enrichment shall not exceed 4.5 weight percent U-235.
(3) Maximum assembly average burnup shall not exceed 47,000 megawatt-days per metric ton uranium (NUHOMS-24P) or 52,000 megawatt-days per metric ton uranium (NUHOMS-32P).
(4) Minimum burnup shall exceed the minimum specified in SAR Figure 3.3-1.
(Applicable only to NUHOMS-24P.)
(5) Maximum heat generation rate shall not exceed 0.66 kilowatt per fuel assembly.
(6) Fuel shall have cooled as specified in ISFSI SAR Table 9.4.1.
(7) Maximum assembly mass including control components shall not exceed 1450 Ib.(658 kg).
(8) Fuel shall be undamaged.
(9) Fuel shall be intact (NUHOMS-32P), only if air is the blowdown medium for DSC drying.
APPLICABILITY: This specification is applicable to all spent fuel to be stored in Calvert Cliffs ISFSI.
ACTION: If any fuel does not specifically meet the requirements for maximum burnup and post irradiation time (items 3 & 6 above), confirm to see if the requirements of Section 2.1 are satisfied. If any other requirements of the above specification are not satisfied, do not load the fuel assembly into a DSC for storage.
Page 5 of 13 Amendment 9