ML102600267

From kanterella
Jump to navigation Jump to search
Independent Spent Fuels Storage Installation Physical Plan and Verification of ASM Incorporation
ML102600267
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/05/2010
From: Wastler S
Division of Security Policy
To: David Pstrak
NRC/NMSS/SFST/LID/RIOB
Wastler, S L, DSP/MWISB 301-415-8733
References
IR-10-405
Download: ML102600267 (2)


Text

October 5, 2010 MEMORANDUM TO:

Dave Pstrak, Branch Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Licensing and Inspection Directorate Office of Nuclear Material Safety and Safeguards FROM:

Sandra Wastler, Branch Chief /RA/

Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF THE PERRY NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On August 10-11, 2010, a Security Inspection conducted by Gene Bonano, from Region III, verified that the Independent Spent Fuel Storage Installation (ISFSI) located at the Perry Nuclear Power Plant, has successfully met the objectives outlined in the TI 2690/008 and IP 81001.1 dated October 17, 2007. The Inspection Report number is: 05000440/2010405.

Based on our review, we have determined that the Perry Physical Security Plan, has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, the October 2002 order and the Additional Security Measures imposed by the NRC.

If you have any questions, please contact Douglas Garner, at 301-415-6786, Douglas.garner@nrc.gov or Mike DEttore at (301) 415-0422 michael.dettore@nrc.gov CONTACT:

Doug Garner, DSP/NSIR (301) 415-6786 Mike DEttore, DSP/MWISB (301) 415-0422

October 5, 2010 MEMORANDUM TO:

Dave Pstrak, Branch Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Licensing and Inspection Directorate Office of Nuclear Material Safety and Safeguards FROM:

Sandra Wastler, Branch Chief /RA/

Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF THE PERRY NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On August 10-11, 2010, a Security Inspection conducted by Gene Bonano, from Region III, verified that the Independent Spent Fuel Storage Installation (ISFSI) located at the Perry Nuclear Power Plant, has successfully met the objectives outlined in the TI 2690/008 and IP 81001.1 dated October 17, 2007. The Inspection Report number is: 05000440/2010405.

Based on our review, we have determined that the Perry Physical Security Plan, has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, the October 2002 order and the Additional Security Measures imposed by the NRC.

If you have any questions, please contact Douglas Garner, at 301-415-6786, Douglas.garner@nrc.gov or Mike DEttore at (301) 415-0422 michael.dettore@nrc.gov CONTACT:

Doug Garner, DSP/NSIR (301) 415-6786 Mike DEttore, DSP/MWISB (301) 415-0422 DISTRIBUTION:

DSP r/f ADAMS Accession No.: ML102600267 OFFICE DSP/MWISB MWISB/BC NAME D. Garner S. Wastler DATE 9/05 /10 9/05 /10 OFFICAL RECORD COPY