Letter Sequence Draft Other |
---|
|
|
|
|
---|
Category:License-Operator
MONTHYEARML24197A0552024-07-15015 July 2024 Requalification Program Inspection NTD-24-027, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-20020 May 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations NTD-23-038, Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-11011 May 2023 Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22312A4352022-10-0303 October 2022 Exam Form 1.3-1 ML22312A5892022-09-0101 September 2022 Exam Proctor Log ML22284A1102022-08-0101 August 2022 Administered Operating Test ML22284A1052022-08-0101 August 2022 Administered Written Examination with Answer Key ML23055B0522022-08-0101 August 2022 Exam Forms (Delayed Release) 2.3-4, 3.2-1, 3.2-2, 3.3-1, 4.1 ML23055A3812022-07-31031 July 2022 Exam Forms 2.3-1, 2.3-2, 3.4-1 ML22003A0042022-01-0303 January 2022 Senior Reactor and Reactor Operator Initial License Examinations ML21117A0842021-04-0909 April 2021 Final Q/A Related - Forms (Folder 1) ML21076A0622021-03-0909 March 2021 Draft Operating Test (Section a, Section B, Section C)(Folder 2) ML21076A0632021-03-0909 March 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21076A0642021-03-0909 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21076A0662021-03-0909 March 2021 Final Operating Test (Section a, B, and C) (Folder 3) ML21075A1022021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21075A1052021-03-0909 March 2021 Draft Written Examination (Folder 2) ML21075A1032021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21075A1042021-03-0909 March 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A1022021-02-0101 February 2021 Operator Licensing Examination Approval ML21117A0832021-01-28028 January 2021 Final Q/A Related Form ES-401-6 (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 NTD-20-014, Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML21041A1732019-10-0101 October 2019 Original Question for Modified Question 80 ML19219A1022019-08-0606 August 2019 Operator Licensing Examination Approval ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML19302F9902019-01-0808 January 2019 NRC Corporate Notification Letter (Folder 1) ML18311A1572018-07-24024 July 2018 Operating Test Retake - Examination Approval Letter (Folder 1) ML18311A1562018-07-14014 July 2018 NRC Corporate Notification Letter (Folder 1) NTD-18-044, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000354/20183012018-04-0303 April 2018 Initial Operator Licensing Examination Report 05000354/2018301 ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17178A3092017-06-22022 June 2017 Senior Reactor and Reactor Operator Initial License Examinations LR-N17-0098, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1062017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16293A1232016-10-18018 October 2016 September 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML16295A0562016-10-11011 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16295A0552016-10-10010 October 2016 Post Exam Comments and Resolution (Folder 1) ML16295A0572016-10-0101 October 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML17186A1212016-08-16016 August 2016 Final Qa/Related Forms (Folder 1) ML17186A1452016-08-14014 August 2016 Final Outlines (Folder 3) ML17186A2372016-07-28028 July 2016 Facility Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML17186A2442016-07-28028 July 2016 Draft - Outlines (Folder 2) LR-N16-0125, Response to RIS 2016-09, Preparation of Scheduling of Operator Licensing Examination2016-07-0808 July 2016 Response to RIS 2016-09, Preparation of Scheduling of Operator Licensing Examination ML16053A1032016-02-22022 February 2016 Senior Reactor and Reactor Operator Initial License Examinations - Hope Creek Generating Station ML15163A2462015-12-17017 December 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) 2024-07-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARNTD-24-027, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-20020 May 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations NTD-23-038, Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-11011 May 2023 Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22312A4352022-10-0303 October 2022 Exam Form 1.3-1 ML22312A5892022-09-0101 September 2022 Exam Proctor Log ML22284A1102022-08-0101 August 2022 Administered Operating Test ML23055B0522022-08-0101 August 2022 Exam Forms (Delayed Release) 2.3-4, 3.2-1, 3.2-2, 3.3-1, 4.1 ML22284A1052022-08-0101 August 2022 Administered Written Examination with Answer Key ML23055A3812022-07-31031 July 2022 Exam Forms 2.3-1, 2.3-2, 3.4-1 ML22003A0042022-01-0303 January 2022 Senior Reactor and Reactor Operator Initial License Examinations ML21117A0842021-04-0909 April 2021 Final Q/A Related - Forms (Folder 1) ML21075A1052021-03-0909 March 2021 Draft Written Examination (Folder 2) ML21076A0662021-03-0909 March 2021 Final Operating Test (Section a, B, and C) (Folder 3) ML21076A0622021-03-0909 March 2021 Draft Operating Test (Section a, Section B, Section C)(Folder 2) ML21075A1022021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21075A1032021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21075A1042021-03-0909 March 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21076A0632021-03-0909 March 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21076A0642021-03-0909 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21032A1022021-02-0101 February 2021 Operator Licensing Examination Approval ML21117A0832021-01-28028 January 2021 Final Q/A Related Form ES-401-6 (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 NTD-20-014, Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML21041A1732019-10-0101 October 2019 Original Question for Modified Question 80 ML19219A1022019-08-0606 August 2019 Operator Licensing Examination Approval ML19302F9902019-01-0808 January 2019 NRC Corporate Notification Letter (Folder 1) ML18311A1572018-07-24024 July 2018 Operating Test Retake - Examination Approval Letter (Folder 1) ML18311A1562018-07-14014 July 2018 NRC Corporate Notification Letter (Folder 1) NTD-18-044, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000354/20183012018-04-0303 April 2018 Initial Operator Licensing Examination Report 05000354/2018301 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17178A3092017-06-22022 June 2017 Senior Reactor and Reactor Operator Initial License Examinations LR-N17-0098, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16293A1232016-10-18018 October 2016 September 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML16295A0562016-10-11011 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16295A0552016-10-10010 October 2016 Post Exam Comments and Resolution (Folder 1) ML16295A0572016-10-0101 October 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML17186A1212016-08-16016 August 2016 Final Qa/Related Forms (Folder 1) ML17186A1452016-08-14014 August 2016 Final Outlines (Folder 3) ML17186A2442016-07-28028 July 2016 Draft - Outlines (Folder 2) ML17186A2372016-07-28028 July 2016 Facility Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML16053A1032016-02-22022 February 2016 Senior Reactor and Reactor Operator Initial License Examinations - Hope Creek Generating Station ML15163A2452015-12-17017 December 2015 Draft Written Exam (Folder 2) ML15163A2462015-12-17017 December 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15198A2332015-07-14014 July 2015 June 10, 2015, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML15163A2412015-06-10010 June 2015 Final Outlines (Folder 3) ML16145A2442015-03-31031 March 2015 Final Qa/Related Forms (Folder 1) ML15100A0422015-03-0606 March 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) 2024-05-20
[Table view] |
Text
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Credo Partial Job- Minutia #1 Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward KIA Only 1 H 2 Y B S 2 H 3 Y B S 3 H 2 Y B S 4 H 4 Y N S 5 H 2 Y N S 6 H 3 Y B S 7 F 1 x Y N U LOD=1; minutia; better suited for GFE. Replaced KA & Q 8 H 3 Y B S
!nstrlJctions
[Refer to Section 0 of ES-401 and Appendix B for additional information regarding each of the following concepts.)
I I
- 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
- 2. Enter the level of difficulty (LaD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
- 3. Check the appropriate box if a psychometric flaw is identified:
The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
- The answer choices are a collection of unrelated true/false statements.
The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
4.
- One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
Check the appropriate box if a job content error is identified:
- The question is not linked to the job requirements (i.e., the question has a valid KIA but, as written, is not operational in content).
The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
The question requires reverse logic or application compared to the job requirements.
- 5. Check questions that are sampled for conformance with the approved KIA and those that are designated SRO-only (KIA and license level mismatches are unacceptable).
- 6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
- 7. Based on the reviewer's judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
- 8. At a minimum, explain any "U" ratings (e.g .. how the Appendix B psychometric attributes are not being met).
ES-401 2 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Credo Partial Job- Minutia #1 Back- Q= SRO B/M/N utE/S Explanation Focus Dis!. Link units ward KIA Only 9 H 3 Y B S 10 H 3 Y N S 11 H 2 Y B S 12 H 2 Y N S 13 H 2 Y B S 14 F 2 Y N S 15 F 2 Y B S 16 H 3 Y N S
.., F L ", N S 18 H 3 Y B S I 19 F 2 Y B S 20 H 3 Y B S 21 H 3 Y B S 22 H 3 Y M S 23 F 2 Y B S 24 F 2 Y B S 25 H 3 Y B S 26 H 2 Y B S 27 F 2 Y B S 28 F 2 Y N S
ES-401 3 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Credo Partial Job- Minutia #1 Back- Q= SRO B/M/N utE/S Explanation Focus Dis!. Link units ward KIA Only 29 H 3 Y B S 30 F 2 Y B S 31 H 2 Y B S 32 H 3 Y B S 33 H 3 Y N S 34 H 2 Y B S 35 F 2 Y B S 36 F 2 Y B S
,,~
vI H n L Y 8 ....
v 38 F 2 Y B S I 39 F 2 Y N S 40 F 2 Y B S 41 H 3 Y B S 42 H 3 Y N S 43 F 2 Y B S 44 F 2 Y N S 45 H 2 Y B S 46 F 2 Y B S 47 H 3 Y B S 48 F 2 Y B S
ES-401 4 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Credo Partial Job- Minutia #1 Back- Q= SRO B/M/N U/E/S Explanation Focus Dis!. Link units ward KIA Only 49 H 3 Y B S Y
50 H 2 N S Y
51 H 3 N S Y
52 F 2 B S H
Y 53 3 B S Y
54 F 2 N S Y
55 F 2 B S Y
56 F 2 B S N~ .C~~
Y 57 H 2 N S Y
58 H 3 B S Y
59 H 2 N S F Y 60 2 B S Y
61 H 3 B S 62 Y
H 4 N S Y
63 F 2 N S 64 F Y
2 N S F Y 65 2 B S F 2 Y
66 B S Y
67 F 2 N S Y
68 H 3 B S
ES-401 5 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Credo Partial Job* Minutia #1 Back* Q;:;; SRO B/M/N utE/S Explanation Focus Dis!. Link units ward KIA Only Y
69 F 2 N S Y
70 H 2 M S Y
71 F 2 B S Y
72 F 2 N S Y
73 H 3 B S Y
74 F 2 B S Y
75 H 2 B S Y
76 H 3 Y N S Y
77 H 3 Y B S Y
78 H 2 Y B S 79 H 3 Y
Y B S I Y
80 H 2 Y N S Y
81 H 3 Y B S Y
82 H 3 Y B S Y
83 H 2 Y B S Y
84 H 2 Y B S Y
85 H 3 Y N S Y
86 H 3 Y N S Y
87 H 3 Y N S Y
88 H 3 Y N S
ES*401 6 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LaD (F/H) (1-5) Stem Cues T/F Credo Partial Job- Minutia #1 Back- Q= SRO B/MIN U/E/S Explanation Focus Dist. link units ward KIA Only Y y 89 H 2 B S Y
90 H 3 Y N S Y
91 H 3 Y B S Y
92 F 2 Y B S Y
93 H 3 Y B S Y
94 F 2 Y B S Y
95 H 2 Y B S Y
96 H 3 Y B S Y
H 3 Y 8 S I:: F 2 Y
Y Y B S 99 H 2 Y B S Y
100 H 3 Y B S
8/412010 Todd Fish USNRC Region 1 475 Allendale Road King of Prussia, PA 19406 Hope Creek, Unit 1 Facility Operating License NPF-57 NRC Docket #50-354
Subject:
Changes to Operating Test Items Per telephone discussion, the following changi;!s were made to the Operating Test items:
Scenario #1 - Changed HPCI from being tagged initially to HPCI FOOl Steam Supply valve fails closed. Added all 3 Reactor Feed Pumps trip upon reactor scram to keep RPV level low following scram.
Scenario #2 - Added 3 more control rods stuck at position 48 following scram. Added text for sim operator to control CRD Drive Water pressure control valve to slow rod motion on manual insertion.
Scenario #3 Added note to trigger stuck open SRV when conditions are stable.
JPM #1 - Modified termination cue.
JPM #8 - Modified Cue for RO entry into Abnormal Procedures.
RCi:1:L~
Archie Faulkner Lead Exam Author Hope Creek Station