MONTHYEARIR 05000298/20240032024-11-0505 November 2024 Integrated Inspection Report 05000298/2024003 ML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 05000298/LER-2024-002, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump 05000298/LER-2024-001, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements 05000298/LER-2023-002, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2023-12-20020 December 2023 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 05000298/LER-2022-002-01, Manual Core Spray Injection to Restore Skimmer Surge Tank Level2023-06-29029 June 2023 Manual Core Spray Injection to Restore Skimmer Surge Tank Level ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 05000298/LER-2022-004-01, 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open2023-05-11011 May 2023 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open 05000298/LER-2023-001, Valve Test Failures Result in Condition Prohibited by Technical Specifications2023-05-0808 May 2023 Valve Test Failures Result in Condition Prohibited by Technical Specifications IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report 2024-09-03
[Table view] |
Text
UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 September 7, 2010 MEMORANDUM TO: Eric J. Leeds, Director Office of Nuclear Reactor Regulation FROM: Elmo E. Collins /RA/
Regional Administrator Region IV
SUBJECT:
COOPER NUCLEAR STATION LICENSE RENEWAL APPLICATION On September 24, 2008, Nebraska Public Power District (NPPD) requested to renew the operating license for their Cooper Nuclear Station facility in accordance with 10 CFR Part 54.
With close coordination and support from your staff in the Division of License Renewal, we completed the inspections at Cooper Nuclear Station, in accordance with the guidance in Inspection Manual Chapter 2516 and Inspection Procedure 71002. The inspections verified that NPPD implemented the scoping and screening methodology and established aging management programs in conformance with the descriptions contained in the NPPD application for license renewal. Sampling inspections verified: (1) reasonable assurance of the acceptability of the existing and planned aging management programs, and (2) the applicant provided the required documentation in an auditable and retrievable form. The inspection identified some issues that the applicant resolved satisfactorily. We documented our inspection results in NRC Inspection Reports 05000298/2009010, dated November 24, 2009
[ML093290251], and 05000298/2010008, dated August 10, 2010 [ML102230027].
We have determined that NPPD has completed or will have completed programs and activities related to the license renewal of Cooper Nuclear Station in substantial agreement with docketed commitments and regulatory requirements. Within the above inspection scope, NPPD demonstrated the capability to manage the effects of aging during the period of extended operation. Therefore, we conclude that there is reasonable assurance that the NPPD aging management programs provide an adequate foundation for renewing the license for the Cooper Nuclear Station for an additional 20 years.
Should you have any questions concerning this letter, please contact me at (817) 860-8225.
Docket: 50-298 License: DPR-46
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
Acting DRP Director (Anton.Vegel@nrc.gov)
Acting DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Director, Division of License Renewal (Brian.Holian@nrc.gov)
Senior Resident Inspector (Nick.Taylor@nrc.gov)
Resident Inspector (Michael.Chambers@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
CNS Administrative Assistant (Amy.Elam@nrc.gov)
License Renewal Project Manager (Tam.Tran@nrc.gov)
License Renewal Branch Chief (Bo.Pham@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Greg Pick (Greg.Pick@nrc.gov)
Neil OKeefe (Neil.OKeefe@nrc.gov)
R:\_REACTORS\CNS\2010\CNS License Renewal Application ADAMS ML ADAMS: No 7 Yes 7 SUNSI Review Complete Reviewer Initials:
Publicly Available 7 Non-Sensitive Non-publicly Available Sensitive SRI:EB2 C:EB2 C:DRP/C D:DRS RA GPick/tek NFOKeefe VGGaddy RJCaniano EECollins
/RA/ /RA/ /RA/ /RA/ /RA/
09/ 3 /10 09/3 /10 09/ 3 /10 09/3 /10 09/7 /10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax