ML102450254

From kanterella
Jump to navigation Jump to search
CG-2009-10-Final JPM Outlines
ML102450254
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/14/2009
From: Garchow S
Operations Branch IV
To:
Energy Northwest
References
Download: ML102450254 (4)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Columbia Generating Station Date of Examination: October 2009 Examination Level: RO X SRO Operating Test Number: 1 Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations N R The RO Candidate is given OSP-RCS-C101, the RPV Heatup Surveillance and asked to review it for any data that may be out of limits Conduct of Operations M R The RO Candidate is given data and asked to determine the time to change load for the Main Turbine Equipment Control P R The RO Candidate is given the task of determining the clearance boundary for work associated with replacement of a pipe coupling located downstream of FPC-P-1A Radiation Control M R The RO Candidate is given data for his personal dose and told he is to perform work that is in a High Radiation Area. The candidate has to calculate his maximum stay time Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Columbia Generating Station Date of Examination: October 2009 Examination Level: RO SRO Operating Test Number: 1 Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations N R The SRO Candidate plant data and asked to determine if a planned entry into the Area Of Increased Awareness is allowed Conduct of Operations N R The SRO Candidate is given that a fire detection system is inoperable and while investigating that, the preaction system pipe is broke. Based on the location the candidate determines compensatory measures and then fill out a Fire Protection Impairment Notification Form Equipment Control N R The SRO Candidate is given the task of approving/reviewing a clearance order for RHR-P-3 and determine if discrepancies exist Radiation Control P R The SRO Candidate is given Offgas system data and determines if actions are required Emergency Procedures/Plan M R The SRO Candidate is tasked with classifying an event and filling out a CNF after Simulator Scenario #3 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: COLUMBIA GENERATING STATION Date of Examination: October 2009 Exam Level: RO SRO-I SRO-U Operating Test No.: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. Start RRC-P-1B at Power (LO001681)

M, A, S 1

R / SRO-I

b. Containment De-Inerting (LO001682)

D, EN, S 5

R / SRO-I

c. Restart RFW-P-1A (Quick Restart) (LR000131)

N, L, S 2

R

d. Parallel DG-1 with SM-7 (LO001684)

N, A, EN, L, S 6

R / SRO-I

e. Pull fuses to close an open SRV (LO001683)

N, S 3

R / SRO-I

f. Start RHR-A in SP Cooling, SW-V-12A fails to Auto Open (LO001686)

D, A, S 8

R / SRO-I

g. Respond to Hydraulic ATWS - Install RPS Jumpers (LO001685)

N, S 7

R / SRO-I

h. Secure SGT Following Auto Initiation with FAZ Reset (LR000222)

D, EN, L, S 9

R / SRO-I In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Prevent a RCIC High Exhaust Pressure Trip (LR001505)

D, E, L, R 4

R / SRO-I

j. Respond to Control Room HVAC High Radiation Level in One Remote Air Intake (LO001595)

D, P, A, E, R 9

R / SRO-I

k. Restart RPS MG Set and Repower the RPS Bus (LO001641)

D, P, A, R 7

R / SRO-I

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1

- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 Actual JPM count:

(A) - 5/5 (C) - None (D) - 6/6 (E) - 3 /3 (EN) - 3/3 (L) - 4/3 (N) (M) - 6/6 (P) - 2/2 (R) - 3/3 (S) - 8/7