MONTHYEARML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 2024-09-08
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 August 24, 2010 Mr. Paul E. Davis, Director State of Tennessee Department of Environment and Conservation Division of Water Pollution Control 6th Floor, L & C Annex 401 Church Street, Nashville, TN 37243
Dear Mr. Paul E. Davis:
SEQUOYAH NUCLEAR PLANT (SQN) NPDES PERMIT NO. TN0026450 WRITTEN SUBMISSION REGARDING TOWERBROM 960 RELEASE TVA is providing written notification for the subject release that occurred on August 20, 2010.
The verbal notification for this same release was provided by telephone to the Chattanooga Environmental Field Office (EFO) on August 21, 2010 at 1509 and to the Tennessee Emergency Management Agency (TEMA) on August 21, 2010 at 1510. Since the EFO telephone notification was via voice message, Stephanie Howard of TVA and Leetha Abazid of the EFO discussed the event on August 23, 2010. Please see the Attachment (enclosed) for details of the event.
If you have any questions or need additional information, please contact Stephanie Howard at (423) 843-6700 of Sequoyah's Environmental staff.
I certify under penalty of law that this document and all attachments were preparedunder my direction or supervision in accordance with a system designed to assure that qualifiedpersonnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gatheringthe information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I amaware that there are significantpenalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Sincerely, Christopher R. Church Site Vice President Sequoyah Nuclear Plant Enclosure cc (Enclosure):
Chattanooga Environmental Field Office Division of Water Pollution Control State Office Building, Suite 550 540 McCallie Avenue Chattanooga, Tennessee 37402-2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 C O
Attachment Description of the Discharge and Determination of Cause:
At 1850 on 8/20/10, plant security personnel observed a leak adjacent to the Essential Raw Cooling Water (ERCW) building at the Sequoyah Nuclear Plant (SQN). The pumps in this building transfer Tennessee River water into the plant for cooling purposes. The leak was spraying from an outside chemical injection pipe fitting drain plug, overflowing a small basin, onto concrete, and over a ledge into the Tennessee River. Personnel were dispatched to investigate.
The leak was determined to be treated ERCW. The chemical used to treat the ERCW is Towerbrom 960, a mixture of sodium dichloroisocyanurate and sodium bromide. The preliminary cause of the leak is the failure of the drain plug due to corrosion.
Period of Discharge:
The chemical feed was initiated at 1650 on 8/20/10 and discovered at 1850 on 8/20/10. The treatment chemical feed was isolated at 1955. Therefore, the duration of the leak is bounded by a minimum of 65 minutes to a maximum of 185 minutes. A sample of water in the bottom of the catch basin was analyzed and determined to contain 55 ppm total residual chlorine. The permit limit at Outfall 101 is 0.1 ppm chlorine (total residual). No reportable quantity per CERCLA was exceeded. TDEC notification satisfied Federal Insecticide, Fungicide and Rodenticide Act (FIFRA) requirements. An estimated 180 to 540 gallons of treated water was spilled. No other chemical release to the Tennessee River occurred.
Steps Being Taken to Reduce, Eliminate, and Prevent Recurrence When site emergency responders arrived at 1950 on"8/20/1 0, a spill response catch basin was placed under the leak location, capturing approximately 125 gallons. The strainer water feed was isolated at 2053. At this point, all flow was terminated. The cause of the leak is being investigated and, once determined, permanent corrective actions will be taken. SR 236979 was written to document the incident and corrective actions. Currently ERCW chemical additions have been temporarily suspended until a full extent of condition including examination of other drain plugs can be completed. A system walk down was completed 8/21/10 to verify proper system alignment. No misalignments were found. Metallurgical examination of the drain plug is in progress to determine the exact cause of failure.
Other Details:
No fish distress, fish mortality, or abnormal bird migration was observed by site personnel the evening of the event and the morning following. The afternoon of 8/21/10, TVA Biological Resource Staff visually surveyed the near shore area by boat two miles upstream and four miles downstream of the Plant for any signs of dead or dying fish, or aquatic wildlife. During the investigation, water fowl. (two groups of 8 and 6 of Canada Geese), three Great Blue Herons and two Cormorants were observed. No dead or dying fish or affected wildlife was observed in the search area. The opposite shore line was also surveyed to verify any effects of the biocide spill.
No dead or dying fish or affected wildlife was observed.