Notice of Meeting with Firstenergy Nuclear Operating Company. This Is the Exit Meeting for the Special Inspection That Was Conducted at Davis Besse During the Reactor Head Nozzle Repair Activities
ML102300776
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/18/2010
From: Dave Hills
NRC/RGN-III/DRS/EB1
To:
References
Download: ML102300776 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 18, 2010 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No: 50-346 Time and Date: Thursday, September 9, 2010, 6:00 p.m. EDT Location: Oak Harbor High School 11661 W. State Route 163 Oak Harbor, OH 43449

Purpose:

This is the exit meeting for the Special Inspection that was conducted at Davis-Besse during the reactor head nozzle repair activities. We will follow up with the documented results of our Inspection within 45 days of the meeting. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Meeting Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Interested members of the public can participate in this meeting via a toll-free audio teleconference. For details, please call the NRC meeting contact listed on the NRC web site or call the NRCs toll-free number, 1-800-368-5642, and ask the operator to be connected to the meeting contact, Viktoria Mitlyng.

Notice of Significant Licensee Meeting NRC Attendees:

Mark Satorius, Regional Administrator, Region III Anne Boland, Director, Division of Reactor Safety, Region III David Hills, Chief, Engineering Branch 1, Division of Reactor Safety, Region III Jamnes Cameron, Chief, Branch 6, Division of Reactor Projects, Region III Timothy Lupold, Chief, Piping and NDE Branch, Division of Component Integrity, NRR Michael Mahoney, Project Manager, Division of Operating Reactor Licensing, Licensing Branch III-2, Office of Nuclear Reactor Regulation John Rutkowski, Senior Resident Inspector, Davis-Besse Mel Holmberg, Senior Metallurgical Engineer, Special Inspection Team Lead Jay Collins, Senior Metallurgical Engineer, Special Inspection Team Member Licensee Attendees:

Barry Allen, Site Vice President, Davis-Besse Nuclear Brian Boles, Director, Site Operations Vito Kaminskas, Director, Site Engineering John Dominy - Director, Maintenance Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Viktoria Mitlyng at 630-829-9662 by COB September 1, 2010.

Seating may be limited and will be available on a first-come basis. Inform the NRC meeting contact of your intention to attend by September 1, 2010. This step will ensure that sufficient copies of meeting materials are available.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g.,

Braille, large print), please notify the NRCs meeting contact. Determination on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.

Meeting

Contact:

Viktoria Mitlyng Senior Public Affairs Officer, Region III 630-829-9662 Viktoria.Mitlyng@nrc.gov

/RA/

Approved By: David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety

Notice of Significant Licensee Meeting Distribution:

Susan Bagley, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR Tim Riley, OCA RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource Steven West, Director, Division of Reactor Projects, RIII Gary Shear, Deputy Director, Division of Reactor Projects, RIII Anne Boland, Director, Division of Reactor Safety, RIII Kenneth OBrien, Deputy Director, Division of Reactor Safety, RIII Jamnes Cameron, DRP Branch Chief J. Rutkowski, SRI, Davis-Besse DRS Branch Chiefs:

Robert Daley David Hills Eric Duncan AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Resource Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP