ML102250455

From kanterella
Jump to navigation Jump to search
2010 D. C. Cook Nuclear Plant Initial Examination Proposed Exam Files
ML102250455
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/21/2010
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Indiana & Michigan Electric Co
Shared Package
ML102030558 List:
References
Download: ML102250455 (9)


Text

2010 D. C. COOK NUCLEAR PLANT INITIAL EXAMINATION PROPOSED EXAM FILES

INDIANA MlCHlGAN Indiana Michigan Power One Cook Place

  1. )wER" Bridgman, MI 49106 IndianaMichiganPower corn A unit ofAmerican Electric Power April 30, 2010 U. S. Nuclear Regulatory Commission ATTN: Mr. Raymond K. Walton Region Ill Examiner 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 2010 INITIAL LICENSE EXAMINATION Enclosed you will find a copy of the Initial License Examination for the planned June 2010 Examination at Donald C. Cook Nuclear Plant (CNP).

The following items are enclosed in the sealed envelope:

CNP 2010 NRC Operating Examination Overview ES-201-3 Examination Security Agreement ES-301-3 Operating Test Quality Checklist Scenario Exams with Forms ES-D-1 & D-2 a) COOK2010-01 b) COOK2010-02 C) COOK2010-03 d) COOK2010-04 ES-301-4 Simulator Checklist ES-301-5 Transient and Event Checklist Crews 1, 2, & 3 ES-301-5 Transient and Event Checklist Crew 4 ES-301-5 Transient and Event Checklist Crew 5 ES-301-6 Competencies Checklist Crews 1, 2, & 3 ES-301-6 Competencies Checklist Crew 4 ES-301-6 Competencies Checklist Crew 5 ES-301-2 System JPM Outlines & Exams a) ES-301-2 SRO(I) JPM Outline b) ES-301-2 SRO(U) JPM Outline c) ES-301-2 RO JPM Outline d) NRC201O-SIMOI e) NRC2010-SIM02 9 NRC2010-SIM03

9) NRC2010-SIM04 h) NRC2010-SIM05 i) NRC2010-SIM06 j) NRC2010-SIM07 k) NRC2010-SIM08

U. S . Nuclear Regulatory Commission April 30, 2010 Page 2 I) NRC201O-INPO1 m) NRC201O-INP02 n) NRC201O-INP03

13) ES-301-1 Admin JPM Outlines & Exams a) ES-301-1 SRO Admin Outline b) ES-301-1 RO Admin Outline c) NRC201O-Ala d) NRC2010-A1b-R e) NRC2010-A1b-S 9 NRC2010-A2
9) NRC2010-A3 h) NRC201O-A4
14) ES-401-6 Written Exam Quality Checklist
15) CNP 2010 Written Exam Attachments
16) CNP 2010 NRC Written Examination (100 questions with references)

A hard copy of the examination materials is provided for your review. A complete electronic copy of documents without initials or signatures or other handwritten notations for the Public Document Room (ADAMS) has also been provided. This contains the full outline (previously submitted) and electronic PDF versions of the RO and SRO examinations that are to be administered.

None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed.

If you have any comments or concerns, please contact Ted Conrad or Steve Pettinger at E,z*

(269) 465-5901, extension 3738, or myself at (269) 466-3407.

Brian E. Evans Operations Training Manager JTC/jen Enclosures

ES-301 Operating Test Quality Checklist Form ES-301-3 Initi:

f

1. General Criteria
a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements(e.g., 10 CFR 55.45, operational importance, safety function distribution).
b. There is no day-today repetition between this and other operating tests to be administered during this examination.

C. The operating test shall not duplicate items from the applicants' audit test(s). (see Section D.l .a.)

d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
2. Walk-Through Criteria - -
a. Each JPM includes the following, as applicable:

- initial conditions initiating cues

- references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee

  • operationally important specific performance criteria that include:

- detailed expected actions with exact criteria and nomenclature

_ . system response and other examiner cues

. statements describing important observations to be made by the applicant

. criteria for successful completion of the task

- identification of critical steps and their associated performancestandards

- restrictions on the sequence of steps, if applicable  ;^/TL&

b. Ensurethat any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance s

criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations)specified on those forms and Form ES-201-2.

3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordancewith Form ES-301-4 and a copy is attached.

Printed Name I Signature Date Author Facility RevieweiI')

NRC Chief Exaniinei NRC Supervisor NOTE: The facility signature is not applicable for NRC-developedtests.

  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

ES-301,Page 24 of 27

ES-301 Simulator Scenario Quality Checklist Form ES301-4 QUALITATIVE ATTRIBUTES Initials a !b' !c#

1. The initial conditions are realistic, in that some equipment andlor instrumentationmay be out of service, but it does not cue the operators into expected events.
2. The scenarios consist mostly of related events.
3. Each event description consists of the point in the scenario when it is to be initiated the malfunction(s)that are entered to initiate the event the symptomslcues that will be visible to the crew the expected operator actions (by shift position) the event termination point (if applicable)
4. No more than one non-mechanisticfailure (e.g., pipe break) is incorporated into the scenario without a credible preceding incident such as a seismic event.
5. The events are valid with regard to physics and thermodynamics.
6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives.
7. If time compression techniques are used, the scenario summary clearly so indicates.

Operators have sufficient time to carry out expected activities without undue time constraints.

Cues are given.

8. The simulator modeling is not altered.
9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
10. Every operator will be evaluated using at least one new or significantly modified scenario.

All other scenarios have been altered in accordance with Section D.5 of ES-301.

11. All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios).

~ ~~~~~~~~

12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios).

Target Quantitative Attributes (Per Scenario; See Section D.5.d) Actual Attributes

1. Total malfunctions (5-8) L dlCclQ
2. Malfunctions after EOP entry (1-2) zI21ZIZ
3. Abnormal events (2-4) 14 l c / 1 , 3
4. Major transients (1-2) 1 ( 1 2 1 (
5. EOPs enteredlrequiring substantive actions (1-2) I I I l Z l I
6. EOP contingencies requiring substantive actions (0-2) 0 I f II 1 0
7. Critical tasks (2-3) z 12121L

ES-301 Competencies Checklist ~ Form ES-301-6 IL Facility: DC Cook Date of Examination: 06/21/2010 Operating Test No.:Crews 1, 2, & 3 APPLICANTS

) I RO 0 RO IXI SRO-I 0 SRO-I 0 SRO-U SRO-U 0 Competencies SCE NARl0 SCENARIO I Interpret/Diagnose I Events and Conditions Comply With and Use Procedures (1)

Operate Control Boards (2)

Communicate and Interact Demonstrate Supervisory Ability (3)

Comply With and Use Tech. Specs. (3)

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

i(3) Only applicable to SROs.

Instructions:

Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

ES-301 Competencies Checklist Form ES-301-6 Facility: DC Cook Date of Examination: 06/21/2010 Operating Test No.:Crew 4 APPLICANTS SRO-I 0 SRO-l c SRO-U SRO-U Competencies 4Rlq 1 SCENARIO JARIO 3 4 Interpret/Diagnose Events and Conditions Comply With and Use Procedures (1)

Operate Control Boards f21 Communicate and Interact Demonstrate Supervisory Ability (3) 2omply With and Jse Tech. Specs. (3) qotes:

1) Includes Technical Specification compliance for an RO.
2) Optional for an SRO-U.
3) Only applicable to SROs.

~~

Instructions:

Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

ES-301 Competencies Checklist Form ES-301-6 Facility: DC Cook Date of Examination: 06/21/2010 Operating Test No.:Crew 5 APPLICANTS I1 II SRO-I SRO-U 0 SRO-I SRO-I 0 SRO-l 0 Competencies InterpreVDiagnose Events and Conditions Comply With and Use Procedures (1)

Operate Control Boards (2)

Communicate and Interact Demonstrate Supervisory Ability (3)

Comply With and Notes:

includes Technical Specification compliance for an RO.

Optional for an SRO-U.

Only applicable to SROs.

Instructions:

Check the applicantslicense type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

ES-401 Written Examination Quality Checklist Form ES-401-6

~~

Facility: O&g 6 7 ~ L) ~ 7 , 1 4u iT 2 Date of Exam: b / z / ( 0 Exam Level: R O R SRO Initial Item Description a b* c" I. Questions and answers are technically accurate and applicable to the facility.

6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new. and the rest r new or modified); enter the actual RO / SRO-only question distribution@,) at right. 148'//4 I

/ c I w ,Icr/"l

7. Between 50 and 60 percent of the questions on the RO Memory ClA exam are wn'tten at the comprehension/analysis level; the SRO exam may exceed 60 percent if the randomly selected KlAs support the higher cognitive levels; enter the actual RO lSRO question distribution(s) at right.

36 1 9 394 @ @

8. Referenceslhandoutsprovided do not give away answers or aid in the elimination of distractors. LF- s
9. Question content conforms with specific WA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified. 4 F b"i
10. Question psychometricquality and format meet the guidelines in ES Appendix B.
11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet.
a. Author
b. Facility Reviewer r)
c. NRC Chief Examiner (#)
d. NRC Regional Supervisor Note: The facility reviewer's initialslsignatureare not applicable for NRCdeveloped examinations.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

ES-401, Page 29 of 33