Operating Test Comments Systems JPM D:
Step 9 is critical and says start 2/3B Clean Demin pump. Must start 2/3A Clean Demin pump since 2/3B is OOS. RE: Stay as is since 2/3A Clean Demin pump is OOS. MUST start 2/3B pump!
Why isnt Step 11 critical, since applicant is required to open a valve and maintain level? RE: Not critical since already putting water into Hxer.
Systems JPM I How do you procedurally restore from this condition? RE: Will have to contact Ops Rep. May require procedure change!
Admin JPM A-N-4-R: Replaced JPM based on comments from outline review and Admin JPM A-N-4-S possible repetition with applicants audit exam.
Admin JPM A-N-2-S: Will applicant have access to a computer to do this JPM or do we want to prohibit computer use? RE: There will be no access to computer allowed to perform this JPM.
Scenario N-2:
Scenario needs to be improved.
Event #3 move to event #1, EDG running loaded for ST then lose EDGCWP. More challenging. RE: Completed!
Event #2: Lose CRD pump flow, must adjust flow controller before starting standby pump. RE: There will be no change to actions for a pump trip or filter clogging. Keep as is.
Events 5 & 6: Too similar. Will replace one or both with events from spare scenario. RE: Replaced Event 5.
Scenario N-2 will be moved to spare position and retitled N-4.
Scenario N-4 will be retitled to N-2 and will be used during exam.
The following comments were made during onsite validation week and were incorporated as follows:
Systems JPM B:
Add procedure step designators in JPM so examiner can follow along with procedure steps.
Break up cue after Step 4 and add second cue after Step 5.
Add note that I.8.g step to be N/Ad.
Systems JPM E:
Step 11, change panel location from 4 to 5!
Systems JPM F:
Cue after Step 3; Data sheet 1A not Data sheet 1.
Systems JPM G:
Step 2: Change Channel 4 to Drive Control Ch A.
Must setup simulator such that Drive Control CH A display window reads 9510+3.
Admin JPM A-N-1-R Need photo of CST level indicators in lieu of using panel indicators.
Scenario 1:
On Switching Orders provided to applicants, need to change breaker designator to match Scenario step, ie; change breaker to L302.
Major: Add contingency step since crew may cross-connect Bus 28 with Bus 29 which will result in Bus 29 tripping. Allow crew to recover Bus 29.
Scenario 2:
Event 2: Operator will be in room so dont need to wait 2 minutes to give cue.
Event 4: Add annunciator 902-5, F-2 to list of annunciators received.
Scenario 3:
Event 2: Add actions for SRO to reference DOA 6500-10. Also add actions for placing 2A Condensate/Booster pump in PTL.
Event 4: Role play @ bottom of page, QNE will work on rod move sheet.
Scenario 4:
Event 3: Contingency for TS call at end of scenario AND delete contingent TS.
Event 6: Add reference for TS 3.4.1 Condition B also!
Event 8: Trigger 17 will automatically be initiated on Scram.
I decided to use Scenario #4 in lieu of Scenario #2 for examination purposes.
Scenario #2 will be used as the spare scenario and retitled Scenario 4. Scenario 4 will be retitled to Scenario 2.