Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation
ML102230018
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/17/2010
From: Wastler S
Division of Security Policy
To: David Pstrak
NRC/NMSS/SFST/LID/RIOB
Garner Douglas 415-6786
References
Download: ML102230018 (2)


Text

August 17, 2010 MEMORANDUM TO: Dave Pstrak, Branch Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Licensing and Inspection Directorate Office of Nuclear Material Safety and Safeguards FROM: Sandra Wastler, Branch Chief /RA/

Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF THE FERMI 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On January 27, 2010, a Security Inspection conducted by Eugenio Bonano, from Region III, verified that the Independent Spent Fuel Storage Installation located at Fermi 2, has successfully met the objectives outlined in the TI 2690/008 and IP 81001.1 dated October 17, 2007. The Inspection Report number is: 05000341/2010-405. Based on our review, we have determined that the Fermi 2 Physical Security Plan, has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, the October 2002 order and the Additional Security Measures imposed by the U.S. Nuclear Regulatory Commission.

If you have any questions, please contact Douglas Garner, at 301-415-6786, Douglas.garner@nrc.gov or Mike DEttore at (301) 415-0422 michael.dettore@nrc.gov CONTACT: Doug Garner, DSP/NSIR (301) 415-6786

August 17, 2010 MEMORANDUM TO: Dave Pstrak, Branch Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Licensing and Inspection Directorate Office of Nuclear Material Safety and Safeguards FROM: Sandra Wastler, Branch Chief /RA/

Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF THE FERMI 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On January 27, 2010, a Security Inspection conducted by Eugenio Bonano, from Region III, verified that the Independent Spent Fuel Storage Installation located at Fermi 2, has successfully met the objectives outlined in the TI 2690/008 and IP 81001.1 dated October 17, 2007. The Inspection Report number is: 05000341/2010-405. Based on our review, we have determined that the Fermi 2 Physical Security Plan, has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, the October 2002 order and the Additional Security Measures imposed by the U.S. Nuclear Regulatory Commission.

If you have any questions, please contact Douglas Garner, at 301-415-6786, Douglas.garner@nrc.gov or Mike DEttore at (301) 415-0422 michael.dettore@nrc.gov CONTACT: Doug Garner, DSP/NSIR (301) 415-6786 DISTRIBUTION:

DSP r/f ADAMS ACCESSION NO.: ML102230018 OFFICE DSP/MWISB MWISB/BC NAME D. Garner S. Wastler DATE 8/16/10 8/17/10 OFFICAL RECORD COPY