|
---|
Category:License-Operator
MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22174A3902022-06-27027 June 2022 Licensed Operator Positive Fitness-For-Duty Test ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5922021-04-19019 April 2021 GFE Results, March 2021 ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5792020-08-27027 August 2020 ES-301-6 ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5632020-08-27027 August 2020 ES-301-7 ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5662020-08-27027 August 2020 ES-401-6 ML20245E5762020-08-27027 August 2020 ES-301-4 ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5642020-08-27027 August 2020 ES-401-4 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination 2024-01-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5662020-08-27027 August 2020 ES-401-6 ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5762020-08-27027 August 2020 ES-301-4 ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5642020-08-27027 August 2020 ES-401-4 ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5632020-08-27027 August 2020 ES-301-7 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5792020-08-27027 August 2020 ES-301-6 ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination IR 05000282/20183012018-11-30030 November 2018 Errata - Prairie Island Nuclear Generating Plant, Units 1 and 2 - NRC Initial License Examination Report 05000282/2018301 and 05000306/2018301 (DRS-R.Baker) ML22179A2542018-10-16016 October 2018 2018 Prairie Island Ile Outline Review Comments-Final ML22179A2392018-10-16016 October 2018 2018 Prairie Island Ile ES-201-1 Exam Prep Checklist 2024-01-19
[Table view] |
Text
DC Cook 2010 NRC Operating Test Comments ITEM # CHANGES Administrative JPMs NRC 2010-A1a Briefing/Briefing Sheet: Change SRO to RO.
NRC2010-A1b- Page 7 - Critical add word "used" SRO Pages 8 & 9 - Steps should not be critical. & first on Page 10, 4th on page 11.
Note on page 13 - Not applicable for SRO.
Page 7 Combine 2 Critical Standards to 1 Critical Standard.
Page 10: Combine first 2 Critical Standards into 1 Critical Standard.
Page 13: Remove Critical Standard designation from step 4.10.2.
Page 14: Remove Critical Standard designation from step 4.12 (First Item).
NRC2010-A1b-RO No Changes NRC2010-A2 Don't hand out Tech Specs.
Sheet 7: Deleted (CS) from statement since applicant should have already made determination that task could not be completed.
Page 8 "bas" should be "has" NRC2010-A3 Page 6 - Sheet 12 typed twice. Cue has extra period.
Page 2, Evaluation setting - add Simulator Setting: Remove DRS-3201, DRS-3101, and R-24 from Service.
Page 5: N/A for DRS-3201, DRS-3101, and R-24.
NRC2010-A4 Data Sheet 1: Remove (CS) designation from Event Classification.
Add (non-critical): May designate 8 hrs Classification (ESF Actuation).
Sim/In-Plant JPMs NRC2010-SIM01 Is this different than scenario steps?- Yes Fix Outline Alternate Path Cue for step 4.1.3 clean up ask candidate.
Remove 1st paragraph from Cue.
NRC2010-SIM02 Remove 1st paragraph from Cue.
NRC2010-SIM03 No Changes NRC2010-SIM04 No Changes NRC2010-SIM05 No Changes NRC2010-SIM06 No Changes NRC2010-SIM07 No Changes NRC2010-SIM08 Setup: Change R5 to ALARM vice PENDING.
Remove (CS) designation from Determine steps on page 5.
Page 6: Add Cue for AEO verification of damper positions.
NRC2010-INP01 Add Note at First Step for picture.
NRC2010-INP02 Page 5: Split final Cue into two Cues (on either side of STANDARD).
NRC2010-INP03 Page 4: Step 1a, deleted critical step since it had no affect on outcome of step.
Page 5 - designate correct fuse to pull & cleanup picture handout.
07/30/10 Page 1 of 1
DC Cook 2010 NRC Operating Test Comments ITEM # CHANGES Scenarios Cook10-01 Event 7, Doesn't have critical Step to Trip RCP-Large Break LOCA - NA SAT Event 2, Add May align QRV-451 to close if to CCP Suction Only.
Event 2, Add Admin Tave/Tref deviation limits of + 2°F to expecations.
Events 3 and 4: Swap sequence of Event 3 (as resequenced): Add Steps to stabilize power and return HMI/Rods/Blender to Auto.
Cook10-02 Coversheet: Changed Event 1 to RO to perform from BOP to equalize RO/BOP tasks from Scenario 1 Event 2, Add - Panel Actions to Borate RCS Event 2, Add Admin Tave/Tref deviation limits of + 2°F to expecations.
Event 4, Deleted monitoring main generator temp reqts since no affect for only 4% power change Event 5, Start LO Pump - Not Required.
Event 5, Add expectation to place W CCP control switch in PTL Event 5, Added step to energize pressurizer heaters since heaters would have been lost on loss of chg pump/letdown system isolation.
Events 4, 5 Add -Valves required to restore letdown.
Event 6, Similar to Scenario 1 event 6 - OK Event 7/8/9, Add Turbine Solenoid Trip to E-0 Immediate Actions.
Event 9, Add - Replace Fuse after being dispatched to Check AFW Pump Cook10-03 Event 1, Change May be done before South HW Pump is stopped to May be done before South HW Pump is started Event 5, Note about If Reactivity change is required. ADD steps for Boration.
Cook10-04 Event 2, Add Admin Tave/Tref deviation limits of + 2°F to expectations.
Event 2, Add dilution steps like Scenario 1.
Event 4, Remove note about one restart of CCW pump being allowed.
07/30/10 Page 2 of 2