DC Cook 2010 NRC Operating Test Comments ITEM # CHANGES Administrative JPMs NRC 2010-A1a Briefing/Briefing Sheet: Change SRO to RO.

NRC2010-A1b- Page 7 - Critical add word "used" SRO Pages 8 & 9 - Steps should not be critical. & first on Page 10, 4th on page 11.

Note on page 13 - Not applicable for SRO.

Page 7 Combine 2 Critical Standards to 1 Critical Standard.

Page 10: Combine first 2 Critical Standards into 1 Critical Standard.

Page 13: Remove Critical Standard designation from step 4.10.2.

Page 14: Remove Critical Standard designation from step 4.12 (First Item).

NRC2010-A1b-RO No Changes NRC2010-A2 Don't hand out Tech Specs.

Sheet 7: Deleted (CS) from statement since applicant should have already made determination that task could not be completed.

Page 8 "bas" should be "has" NRC2010-A3 Page 6 - Sheet 12 typed twice. Cue has extra period.

Page 2, Evaluation setting - add Simulator Setting: Remove DRS-3201, DRS-3101, and R-24 from Service.

Page 5: N/A for DRS-3201, DRS-3101, and R-24.

NRC2010-A4 Data Sheet 1: Remove (CS) designation from Event Classification.

Add (non-critical): May designate 8 hrs Classification (ESF Actuation).

Sim/In-Plant JPMs NRC2010-SIM01 Is this different than scenario steps?- Yes Fix Outline Alternate Path Cue for step 4.1.3 clean up ask candidate.

Remove 1st paragraph from Cue.

NRC2010-SIM02 Remove 1st paragraph from Cue.

NRC2010-SIM03 No Changes NRC2010-SIM04 No Changes NRC2010-SIM05 No Changes NRC2010-SIM06 No Changes NRC2010-SIM07 No Changes NRC2010-SIM08 Setup: Change R5 to ALARM vice PENDING.

Remove (CS) designation from Determine steps on page 5.

Page 6: Add Cue for AEO verification of damper positions.

NRC2010-INP01 Add Note at First Step for picture.

NRC2010-INP02 Page 5: Split final Cue into two Cues (on either side of STANDARD).

NRC2010-INP03 Page 4: Step 1a, deleted critical step since it had no affect on outcome of step.

Page 5 - designate correct fuse to pull & cleanup picture handout.

07/30/10 Page 1 of 1

DC Cook 2010 NRC Operating Test Comments ITEM # CHANGES Scenarios Cook10-01 Event 7, Doesn't have critical Step to Trip RCP-Large Break LOCA - NA SAT Event 2, Add May align QRV-451 to close if to CCP Suction Only.

Event 2, Add Admin Tave/Tref deviation limits of + 2°F to expecations.

Events 3 and 4: Swap sequence of Event 3 (as resequenced): Add Steps to stabilize power and return HMI/Rods/Blender to Auto.

Cook10-02 Coversheet: Changed Event 1 to RO to perform from BOP to equalize RO/BOP tasks from Scenario 1 Event 2, Add - Panel Actions to Borate RCS Event 2, Add Admin Tave/Tref deviation limits of + 2°F to expecations.

Event 4, Deleted monitoring main generator temp reqts since no affect for only 4% power change Event 5, Start LO Pump - Not Required.

Event 5, Add expectation to place W CCP control switch in PTL Event 5, Added step to energize pressurizer heaters since heaters would have been lost on loss of chg pump/letdown system isolation.

Events 4, 5 Add -Valves required to restore letdown.

Event 6, Similar to Scenario 1 event 6 - OK Event 7/8/9, Add Turbine Solenoid Trip to E-0 Immediate Actions.

Event 9, Add - Replace Fuse after being dispatched to Check AFW Pump Cook10-03 Event 1, Change May be done before South HW Pump is stopped to May be done before South HW Pump is started Event 5, Note about If Reactivity change is required. ADD steps for Boration.

Cook10-04 Event 2, Add Admin Tave/Tref deviation limits of + 2°F to expectations.

Event 2, Add dilution steps like Scenario 1.

Event 4, Remove note about one restart of CCW pump being allowed.