UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 August 13, 2010 LICENSEE:
Pacific Gas and Electric Company FACILITY:
Diablo Canyon Nuclear Power Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 3, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION SCOPING AND SCREENING AND AGING MANAGEMENT REVIEW The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E) held a telephone conference call on August 3,2010, to obtain clarification on the staff's draft request for additional information (D-RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.
Bye-mail dated July 22,2010, the staff sent D-RAls to PG&E regarding scoping and screening and aging management review. PG&E reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the staffs D-RAls. Enclosure 2 provides discussions on D-RAls for which the applicant requested clarification. No changes to other D-RAls were necessary as a result of this telephone conference call. Formal RAls will be issued by a separate letter. provides a listing of the participants.
The applicant had an opportunity to comment on this summary.
Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
As stated cc w/encls: Distribution via Listserv
TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 3,2010 PARTICIPANTS Nate Ferrer Stan Gardocki Garry Armstrong Rachel Vaucher Yogen Garud Terry Grebel Philippe Soenen Kyle Duke Chris Beard Chalmer Myer Dave Kunsemiller AI Saunders Ken Bryant AFFILIATIONS U.S. Nuclear Regulatory Commission (NRC)
NRC NRC NRC Argonne National Laboratory Pacific Gas and Electric Company (PG&E)
PG&E PG&E PG&E Strategic Teaming And Resource Sharing (STARS)
STARS STARS STARS ENCLOSURE 1
Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Draft Request for Additional Information Scoping and Screening/Aging Management Review D-RAI 2.3.3.4-01 On license renewal application (LRA) drawings LR-DCPP-14-106714-03 and LR-DCPP-14 107714-03, the applicant depicts the label "stuffing box" at locations 31-C, 33-C, and 35-C, but the components are not shown. On tile LRA aging management review Table 2.3.3-4 for the component cooling water system, the "stuffing box" component is not listed. The staff requests that the applicant justify the exclusion of the stuffing box from LRA Table 2.3.3-4.
Discussion: Based on a discussion with the applicant, it was determined that the stuffing box for the pumps were within the scope of license renewal and covered within the pump component type in LRA Table 2.3.3-4. Therefore, this question is withdrawn and will not be sent as a formal request for additional information.
ENCLOSURE 2
. ML102170115 OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer IKing DWrona NFerrer DATE 08/12/10 08/06/10 08/13/10 08/13/10
Memorandum to Pacific Gas and Electric Company from N. Ferrer dated August 13, 2010
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 3, 2010, BEiWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION SCOPING AND SCREENING AND AGING MANAGEMENT REVIEW DISTRIBUTION:
HARDCOPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDIr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDIrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource NFerrer KGreen AStuyvenberg DWrona AWang MPeck, RIV TBrown, RI GMiller, RIV NO'Keefe, RIV ICouret, OPA VDricks, OPA WMaier, RIV JWeil,OCA EWilliamson, OGC SUttal,OGC RRihm, EDO