Email, Request for Additional Information Relief Request No. W3-ISI-017, Alternative to ASME IWA-5211 Regarding Chemical Volume Control System Pipe Visual Inspection
ML102160231
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/04/2010
From: Kalyanam N
Plant Licensing Branch IV
To: Steelman W
Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC ME3419
Download: ML102160231 (2)


Text

From: Kalyanam, Kaly Sent: Wednesday, August 04, 2010 9:12 AM To: STEELMAN, WILLIAM J

Subject:

Formal RAI - Relief Request W3-ISI-017 (TAC No. ME3419)

Mr. Steelman, By letter dated February 22, 2010, Entergy Operations, Inc. (Entergy) made a request to NRC for approval to use an Alternative to ASME IWA-5211 Regarding Chemical Volume Control System Pipe Visual Inspection for the Waterford Steam Electric Station, Unit 3.

The TAC No. for this request is ME3419.

The NRC Staff has reviewed the amendment request and determined that we require additional information to complete our review. A request for additional information appears below. This was originally discussed with your engineers On July 9, 2010.

The staff requests you to provide a response to the RAI within 30 days from the date of this email.

Thanks Kaly DOCKET No. 50-382 REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST W3-ISI-017 ALTERNATIVE TO ASME IWA-5211 REGARDING CVCS PIPE VISUAL INSPECTION MODIFY TS 3/4.9.7, "CRANE TRAVEL -FUEL HANDLING BUILDING" WATERFORD STEAM ELECTRIC STATION, UNIT 3

1. How was the system leakage inspection of the subject piping contained in the vertical pipe chase performed during the previous inspection interval?
2. What is the length of pipe that is inaccessible?
3. Does the pipe pressure boundary contain any weld(s)?
4. The leakage from the subject piping may be deposited on the surface of pipe chase that is part of a Controlled Ventilation Area System (CVAS) boundary.

Why has installation of remote visual equipment or installation of leakage detection system been considered?

E-mail Properties Mail Envelope Properties ()

Subject:

Formal RAI - Relief Request W3-ISI-017 (TAC No. ME3419)

Sent Date: 8/4/2010 8:51:33 AM Received Date: 8/4/2010 9:11:00 AM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov Recipients:

wsteelm@entergy.com (STEELMAN, WILLIAM J)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 11797 8/4/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: