ML102150072

From kanterella
Jump to navigation Jump to search
Oregon State University, Notification of Staff Transition Change in Level 1 Personnel
ML102150072
Person / Time
Site: Oregon State University
Issue date: 07/30/2010
From: Reese S
Oregon State University
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML102150072 (1)


Text

OSU Oregon State U NIV ERS ITY Radiation Center Oregon State University, 100 Radiation Center, Corvallis, Oregon 97331-5903 T 541-737-2341 1F 541-737-0480 1http://ne.oregonstate.edu/facilities/radiationcenter July 30, 2010 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Reference:

Oregon State University TRIGA Reactor (OSTR),

Docket No. 50-243, License No. R-106

Subject:

Change in Level 1 Personnel This purpose of this letter is to inform the Commission that effective July 1, 2010, Dr. Rich Holdren stepped down as the Interim Vice President for Research (VPR) at Oregon State University and Dr. Richard Spinrad began serving as the VPR with all the authority and responsibility thereof. By this letter, the Commission is notified of the staff transition, as required by Technical Specification 6.7.2.b.1 of License No. R-106, Docket No.20-243, for the OSTR.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on 7 b 0 110-Steven R. Reese Director cc: Al Adams, USNRC Craig Bassett, USNRC Ken Niles, ODOE Richard Spinrad, OSU Rich Holdren, OSU Todd Palmer, OSU 40C2-0

,L/6DQ