|
---|
Category:Letter
MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] Category:License-Operator
MONTHYEARNTD-23-038, Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-11011 May 2023 Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22312A4352022-10-0303 October 2022 Exam Form 1.3-1 ML23055A3812022-07-31031 July 2022 Exam Forms 2.3-1, 2.3-2, 3.4-1 ML22003A0042022-01-0303 January 2022 Senior Reactor and Reactor Operator Initial License Examinations ML21117A0842021-04-0909 April 2021 Final Q/A Related - Forms (Folder 1) ML21076A0632021-03-0909 March 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21076A0642021-03-0909 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21075A1042021-03-0909 March 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21075A1022021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21075A1032021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21075A1052021-03-0909 March 2021 Draft Written Examination (Folder 2) ML21076A0622021-03-0909 March 2021 Draft Operating Test (Section a, Section B, Section C)(Folder 2) ML21076A0662021-03-0909 March 2021 Final Operating Test (Section a, B, and C) (Folder 3) ML21032A1022021-02-0101 February 2021 Operator Licensing Examination Approval ML21117A0832021-01-28028 January 2021 Final Q/A Related Form ES-401-6 (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 NTD-20-014, Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML21041A1732019-10-0101 October 2019 Original Question for Modified Question 80 ML19219A1022019-08-0606 August 2019 Operator Licensing Examination Approval ML19302F9902019-01-0808 January 2019 NRC Corporate Notification Letter (Folder 1) ML18311A1572018-07-24024 July 2018 Operating Test Retake - Examination Approval Letter (Folder 1) ML18311A1562018-07-14014 July 2018 NRC Corporate Notification Letter (Folder 1) NTD-18-044, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000354/20183012018-04-0303 April 2018 Initial Operator Licensing Examination Report 05000354/2018301 ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17178A3092017-06-22022 June 2017 Senior Reactor and Reactor Operator Initial License Examinations LR-N17-0098, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1062017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16293A1232016-10-18018 October 2016 September 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML16295A0562016-10-11011 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16295A0552016-10-10010 October 2016 Post Exam Comments and Resolution (Folder 1) ML16295A0572016-10-0101 October 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML17186A1212016-08-16016 August 2016 Final Qa/Related Forms (Folder 1) ML17186A1452016-08-14014 August 2016 Final Outlines (Folder 3) ML17186A2442016-07-28028 July 2016 Draft - Outlines (Folder 2) ML17186A2372016-07-28028 July 2016 Facility Comments on Draft Facility-Developed Exam (Written) (Folder 2) LR-N16-0125, Response to RIS 2016-09, Preparation of Scheduling of Operator Licensing Examination2016-07-0808 July 2016 Response to RIS 2016-09, Preparation of Scheduling of Operator Licensing Examination ML16053A1032016-02-22022 February 2016 Senior Reactor and Reactor Operator Initial License Examinations - Hope Creek Generating Station ML15163A2462015-12-17017 December 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15163A2452015-12-17017 December 2015 Draft Written Exam (Folder 2) ML15198A2332015-07-14014 July 2015 June 10, 2015, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML15163A2412015-06-10010 June 2015 Final Outlines (Folder 3) ML16145A2442015-03-31031 March 2015 Final Qa/Related Forms (Folder 1) ML15091A2402015-03-30030 March 2015 March 4, 2015, NRC Generic Fundamentals Examination Results for Hope Creek, (Cover Letter Publicly Available, Enclosures Withheld from Public) ML15100A0422015-03-0606 March 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15100A0412015-03-0606 March 2015 Handouts to Applicants (Folder 3) 2023-05-11
[Table view] Category:Part 55 Examination Related Material
MONTHYEARNTD-23-038, Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-11011 May 2023 Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22312A4352022-10-0303 October 2022 Exam Form 1.3-1 ML23055A3812022-07-31031 July 2022 Exam Forms 2.3-1, 2.3-2, 3.4-1 ML22003A0042022-01-0303 January 2022 Senior Reactor and Reactor Operator Initial License Examinations ML21117A0842021-04-0909 April 2021 Final Q/A Related - Forms (Folder 1) ML21075A1022021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21076A0632021-03-0909 March 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21076A0642021-03-0909 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21076A0622021-03-0909 March 2021 Draft Operating Test (Section a, Section B, Section C)(Folder 2) ML21075A1052021-03-0909 March 2021 Draft Written Examination (Folder 2) ML21076A0662021-03-0909 March 2021 Final Operating Test (Section a, B, and C) (Folder 3) ML21075A1042021-03-0909 March 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21075A1032021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21032A1022021-02-0101 February 2021 Operator Licensing Examination Approval ML21117A0832021-01-28028 January 2021 Final Q/A Related Form ES-401-6 (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 NTD-20-014, Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML21041A1732019-10-0101 October 2019 Original Question for Modified Question 80 ML19219A1022019-08-0606 August 2019 Operator Licensing Examination Approval ML19302F9902019-01-0808 January 2019 NRC Corporate Notification Letter (Folder 1) ML18311A1572018-07-24024 July 2018 Operating Test Retake - Examination Approval Letter (Folder 1) ML18311A1562018-07-14014 July 2018 NRC Corporate Notification Letter (Folder 1) NTD-18-044, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000354/20183012018-04-0303 April 2018 Initial Operator Licensing Examination Report 05000354/2018301 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17178A3092017-06-22022 June 2017 Senior Reactor and Reactor Operator Initial License Examinations LR-N17-0098, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16293A1232016-10-18018 October 2016 September 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML16295A0562016-10-11011 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16295A0552016-10-10010 October 2016 Post Exam Comments and Resolution (Folder 1) ML16295A0572016-10-0101 October 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML17186A1212016-08-16016 August 2016 Final Qa/Related Forms (Folder 1) ML17186A1452016-08-14014 August 2016 Final Outlines (Folder 3) ML17186A2442016-07-28028 July 2016 Draft - Outlines (Folder 2) ML17186A2372016-07-28028 July 2016 Facility Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML16053A1032016-02-22022 February 2016 Senior Reactor and Reactor Operator Initial License Examinations - Hope Creek Generating Station ML15163A2462015-12-17017 December 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15163A2452015-12-17017 December 2015 Draft Written Exam (Folder 2) ML15198A2332015-07-14014 July 2015 June 10, 2015, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML15163A2412015-06-10010 June 2015 Final Outlines (Folder 3) ML16145A2442015-03-31031 March 2015 Final Qa/Related Forms (Folder 1) ML15100A0422015-03-0606 March 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15100A0412015-03-0606 March 2015 Handouts to Applicants (Folder 3) ML15100A0402015-03-0303 March 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15163A2442015-02-17017 February 2015 Draft - Outlines (Folder 2) ML15163A2432015-02-17017 February 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15163A2422015-02-17017 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) 2023-05-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 July 29, 2010 Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P. O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - (HOPE CREEK GENERATING STATION, UNIT 1)
Dear Mr. Joyce:
In a telephone conversation on July 14, 2010, Mr. Todd Fish, NRC Senior Operations Engineer, and Mr. Phil Balch, Requalification Program Administrator, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Hope Creek. The inspection is planned for the week of September 20, 2010, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause;
- 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations, and operating test scheduled for the week of the inspection to the NRC by September 13, 2010. Mr. Balch has been advised of this request and was provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the PapelWork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52),
U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
T. Joyce 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, a copy of this letter will be II available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection. please contact Mr. Fish at (610) 337-5369.
Samuel L Hansell, Jr., Chief Operations Branch Division of Reactor Safety .
Docket No. 50-354 License No. NPF-57 cc: Distribution via ListServ
T. Joyce 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rmladams.html(The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Fish at (610) 337-5369.
Sincerely, .
IRAJ Samuel L Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-354 License No. NPF-57 cc: Distribution via ListServ Distribution:
M. Dapas, Acting RA (R10RAMAIL Resource)
D. Lew, Acting DRA (R10RAMAIL Resource)
J. Clifford, DRP (R1 DRPMAIL Resource)
D. Roberts, DRS (R1DRSMaii Resource)
P. Wilson, DRS (R1DRSMail Resource)
A. Burritt, DRP L. Cline, DRP A. Turilin, DRP C. Douglas, DRP B. Welling, DRP, SRI A. Patel, DRP, RI L. Trocine, RI OEDO D. Bearde, DRS C. Bixler, DRS RidsNRRPMHopeCreek Resource ROPreportsResource@nrc.gov SUNSI Review Complete: tlf (Reviewer's Initials)
DOCUMENT NAME: G:\DRS\Operations Branch\FISH\Requal FY10-HC Sep 10\60 dayrpi.doc ADAMS PKG: ML102080348 ADAMS ACC: ML102110022 After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a co of this documen indicate In the box: "C" = Co without attaci1mentJenclosure "E" =Co with attachment/enclosure "N" =No co "DRS/OB RIIDRS/OB THFish/thf* SLHanselllslh 128/10 07129110 OFFICIAL RECORD COPY