7/27/2010 Summary of Teleconference with Tennessee Valley Authority Regarding Status of Instrumentation and Control Review, Section 7 to the Final Safety Analysis Report
ML102090341
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 08/09/2010
From: Justin Poole
Watts Bar Special Projects Branch
To:
Tennessee Valley Authority
Poole Justin/DORL/ 301-415-2048
References
Download: ML102090341 (3)


Text

August 9, 2010 APPLICANT: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Plant, Unit 2

SUBJECT:

SUMMARY

OF JULY 27, 2010, TELEPHONE CONFERENCE CALL WITH TENNESSEE VALLEY AUTHORITY REGARDING STATUS OF INSTRUMENTATION AND CONTROL REVIEW, SECTION 7 OF THE FINAL SAFETY ANALYSIS REPORT On July 27, 2010, the U.S. Nuclear Regulatory Commission (NRC) staff held a telephone conference call with representatives of Tennessee Valley Authority (TVA) to discuss the NRCs review of Section 7 to the Final Safety Analysis Report (FSAR) Instrumentation and Controls

[I&C]. This call was a followup to TVAs drop-in visit with NRC management in January 2010.

The NRC staff stated to TVA that there are documents that TVA needs to submit in order for the staff to complete its review of Section 7 of the FSAR. TVA responded that they believe that not all documents require submittal and that some could be audited. The NRC staff and TVA agreed that in the next biweekly I&C status call, that the NRC staff and TVA would clearly define which documents TVA is required to submit and which documents the NRC staff will audit.

During the second portion of the call, NRC staff made a request to send staff to Watts Bar with the purpose of thoroughly understanding the design of the I&C systems at Watts Bar Units 1 and 2. Since TVA has stated that much of the I&C system design of Watts Bar Unit 2 is the same as Watts Bar Unit 1, the NRC would like TVA to explain any changes made to the I&C systems at Watts Bar Unit 1 since initial licensing and any I&C system design differences between Watts Bar Unit 1, currently, and Watts Bar Unit 2. TVA agreed to the request.

Members of the public did not participate in the call.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

/RA/

Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of participants cc w/encl: Distribution via Listserv

ML102090341 OFFICE LPWB/PM LPWB/LA DE/EICB/BC LPWB/BC NAME JPoole BClayton WKemper/GWilson for SCampbell DATE 08 / 06 /10 08 / 09 /10 08 / 09 /10 08 / 09 /10

Enclosure CONFERENCE CALL BETWEEN NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT SECTION 7 LIST OF PARTICIPANTS July 27, 2010 NRC TVA Allen Howe, DORL Deputy Div. Dir.

Masoud Bajestani, Vice President, WBN 2 George Wilson, DE Acting Deputy Div. Dir.

Gordon Arent, Licensing Manager, NGD&C Stephen Campbell, LPWB Branch Chief William Crouch, Licensing Manager, WBN 2 William Kemper, I&C Branch Chief Steve Hilmes, Electrical and I&C Manager Patrick Milano, Project Manager Steve Clark, Licensing Engineer Stewart Bailey, Project Manager Justin Poole, Project Manager