ML101900558

From kanterella
Jump to navigation Jump to search
Summary of Telephone Call Pertaining to the LRA of the Diablo Canyon Nuclear Power Plant, Units 1 & 2
ML101900558
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/16/2010
From: Kimberly Green
License Renewal Projects Branch 2
To:
License Renewal Projects Branch 2
Green K, NRR/DLR, 415-1627
References
Download: ML101900558 (2)


Text

July 16, 2010 MEMORANDUM TO: File FROM: Kimberly Green, Safety Project Manager /RA/

Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF TELEPHONE CALL ON JUNE 28, 2010, PERTAINING TO THE LICENSE RENEWAL APPLICATION OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 This memorandum documents a telephone call with Philippe Soenen and Terry Grebel, Pacific Gas and Electric Company (PG&E), on June 28, 2010. The purpose of the telephone call was to obtain clarification on various aspects of the compressed gas system. During the telephone call, the staff asked if PG&E has an evaluation that assesses the effects of a failure of the spent fuel pool gate seal on water level within the pool. PG&E stated that it does have an evaluation and will make it available for NRCs viewing. Additionally, the staff inquired about three components (LCV 12, PDP YM459, and PO459) that appear to have backup air to the compressed air system. The applicant stated that LCV 12 goes to a condenser makeup line and backup air is provided only for operational purposes; there is no safety function. The other two components go to an abandoned positive displacement pump and are no longer used.

Docket Nos. 50-275 and 50-323

ML101900558 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME SFigueroa KGreen DWrona DATE 7/12/10 7/15/10 7/16/10