Summary of Pre-Application Meeting with Entergy Nuclear Operations, Inc. to Discuss Pressurized Thermal Shock Analysis for Palisades
ML101890904
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/13/2010
From: Mahesh Chawla
Plant Licensing Branch III
To:
Entergy Nuclear Operations
Chawla M, NRR/DORL, 415-8371
Shared Package
ML101950341 List:
References
TAC ME4021
Download: ML101890904 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 13 ~ 2010 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF JUNE 22,2010, PRE-APPLICATION MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC., TO DISCUSS PRESSURIZED THERMAL SHOCK ANALYSIS (TAC NO. ME4021)

On June 22, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Nuclear Operations, Inc. (ENO), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the Pressurized Thermal Shock (PTS) issue for the Palisades Nuclear Plant (PNP) reactor pressure vessel (RPV). A list of attendees is provided as .

Prior to the meeting, the licensee had submitted "Documentation for Pressurized Thermal Shock Evaluation Meeting," dated June 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101540386). During the meeting, the licensee's presentation provided overview of the PTS issue at Palisades. The licensee discussed with the NRC staff the historical status, future plans and the proposed timeline for future actions regarding the Palisades RPV PTS issue (ADAMS Accession No. ML101740061).

The licensee plans to submit a complete PTS re-assessment in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.61, "Fracture toughness requirements for protection against pressurized thermal shock events," utilizing new and pertinent data presented during this meeting and to validate the date of March 2014 for current PNP RPV heat-up and cool down curves. The licensee also plans to initiate activities relative to performing an evaluation of the PNP RPV utilizing 10 CFR 50.61a, "Alternate fracture toughness requirements for protection against pressurized thermal shock events," prior to performing in-service inspection of PNP RPV in the spring of 2012. The NRC staff found the licensee's future actions to be reasonable, however, they also recommended that the licensee have contingency plans in place until meeting the PTS regulatory requirements. The licensee adequately responded to staff questions and provided the necessary information and clarifications. There was also a general consensus to conduct additional meetings or teleconferences as needed.

-2 A single member of the public was in attendance. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-8371, or Mahesh.chawla@nrc.gov.

~10fY\L Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

List of Attendees cc w/encls: Distribution via Listserv

LIST OF ArrENDEES JUNE 22,2010, PRE-APPLICATION MEETING WITH ENO TO DISCUSS PRESSURIZED THERMAL SHOCK ANALYSIS FOR PALISADES NUCLEAR PLANT NAME ORGANIZATION TITLE Mahesh Chawla NRC/NRR/DORL Project Manager Barry Elliot NRC/NRR/DLR Senior Materials Engineer Matthew Mitchell NRC/NRR/DCI Branch Chief Jeff Poehler NRC/NRR/DCI Senior Materials Engineer Pat Purtscher NRC/NRR/CVIB Materials Engineer Simon Sheng NRC/NRR/DCI Senior Materials Engineer Bob Hardies NRC/NRR/DCI Senior Level Advisor Benjamin Parks NRC/NRR/DSS Reactor Systems Engineer Stephen Byrne Westinghouse Fellow Engineer Tim Griesbach Structural Integrity Senior Associate William Server ATI Consulting President Brian Kemp Palisades Nuclear Plant Design Engineering Manager Jeff Erickson Palisades Nuclear Plant Licensing Engineer Keith Smith Palisades Nuclear Plant Project Manager Paula Anderson Licensing Manager Palisades Nuclear Plant Charles Tomes --------------------------- Visitor Enclosure

PKG: ML101950341 Meeting Notice: ML101550611 Meeting Summary: ML101890904 Handouts: ML101740061

'via email OFFICE DORL/LPL3-1/PM DORL/LPL3-1/LA NRR/DCI/CVIB/BC DORL/LPL3-1/BC DORL/LPL3-1/PM NAME MChawla BTuily ITHarris for MMitchell' RPascarelli MChawla DATE 07/09/10 07/09/10 07/9/10 07/13/10 07/13/10