Summary of Telephone Conference Call Held on July 1, 2010, Between the U.S. Nuclear Regulatory Commission and Pacific Gas and Electric Company Concerning Draft Request for Additional Information Related to the Diablo Canyon Nuclear Power Pl
ML101880765
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/22/2010
From: Ferrer N
License Renewal Projects Branch 2
To:
Pacific Gas & Electric Co
Ferrer, N B, NRR/DLR, 415-1045
References
Download: ML101880765 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 22, 2010 LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JULY 1, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION-AGING MANAGEMENT PROGRAMS The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E) held a telephone conference call on July 1, 2010, to obtain clarification on the-staff's draft request for additional information (D-RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application (LRA).

By email dated June 11, 2010, the staff sent D-RAls to PG&E regarding aging management programs. PG&E reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the staff's D-RAls. Enclosure 2 provides discussions on D-RAI for which the applicant requested clarification. No changes to other D-RAls were necessary as a result of this telephone conference call. Formal RAls will be issued by a separate letter. provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

/"

//1/?

Nakaniel Ferrer, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encl: See next page

TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 1, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)

William Holston NRC Seung Min NRC Albert Wong NRC Keith Axler Center for Nuclear Waste Regulatory Analyses (CNWRA)

Elizabeth Trillo CNWRA Todd Mintz CNWRA Terry Grebel Pacific Gas and Electric Company (PG&E)

Philippe Soenen PG&E Daniel Gibbons PG&E Kevin Braico PG&E David Gonzalez PG&E Gary Holtz PG&E Chalmer Myer Strategic Teaming And Resource Sharing (STARS)

Dave Kunsemiller STARS Enclosure 1

Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Draft Request for Additional Information Aging Management Programs/Aging Management Review D-RAI 82.1.20-1 LRA Table 3.4.2-1 and 3.4.2-3 included carbon steel valves exposed to atmosphere/weather (external) and managed by the AMP B2.1.20, "External Surfaces Monitoring." The GALL AMP XI.M36, "External Surfaces Monitoring," recommends visual inspection of external surfaces for evidence of material loss and leakage.

During an examination of Diablo Canyon Power Plant (DCPP) plant documentation for External Surfaces Monitoring Program, there were instances of in-scope carbon steel valves within LRA Table 3.4.2-1 and 3.4.2-3 (identification numbers MU-0237, MU-0238, MU-0273, MU-0883 and MU-0884 ) that were buried and therefore not accessible for the visual inspection methods recommended in GALL AMP XLM36, "External Surfaces Monitoring." The DCPP LRA states that the External Surfaces Monitoring Program relies on visual inspection to detect degradation by aging. It is unclear to the staff that the in-scope buried valves can be monitored by visual inspection. In addition, it is not clear to the staff that buried valves are properly managed by AMP B2.1.20, "External Surfaces Monitoring" because they are exposed to soil environments and not external air.

Provide clarification regarding the correct categorization of the environments to which the in scope valves are subjected to (external air or soil environments). Provide information confirming that the AMP B2.1.20 "External Surfaces Monitoring," with the requirement for visual inspection, is appropriate to manage aging of these inaccessible buried in-scope components.

Discussion: Based on the discussion with the applicant. it was determined that the valves in question were from a different LRA table and were not composed of carbon steel. Additionally two of the 5 valves in question had different identification numbers. The staff will revise this question as follows. The revised question will be sent as a formal RAI.

RAI 82.1.20-1 LRA Table 3.3.2-5 included valves exposed to atmosphere/weather (external) and managed by the AMP B2.1.20, "External Surfaces Monitoring." The GALL AMP XI.M36, "External Surfaces Monitoring" recommends visual inspection of external surfaces for evidence of material loss and leakage.

During an examination of DCPP plant documentation for External Surfaces Monitoring Program, there were instances of in-scope valves within LRA Table 3.3.2-5 (identification numbers MU-0-267, MU-0-268, MU-0-273, MU-0-883 and MU-0-884 within the make water system) that were buried and therefore not accessible for the Enclosure 2

visual inspection methods recommended in GALL AMP XI.M36, "External Surfaces Monitoring." The DCPP LRA states that the External Surfaces Monitoring Program relies on visual inspection to detect degradation by aging. It is unclear to staff that the in-scope buried valves can be monitored by visual inspection. In addition, it is not clear to the staff that buried valves are properly managed by AMP 82.1.20, "External Surfaces Monitoring" because they are exposed to soil environments and not external air.

Provide clarification regarding the correct categorization of the environments to which the in-scope valves are subjected to (external air or soil environments). Provide information confirming that the AMP 82.1.20, "External Surfaces Monitoring," with the requirement for visual inspection, is appropriate to manage aging of these inaccessible buried in-scope components.

Memorandum to Pacific Gas and Electric Company from N. Ferrer dated July 22.2010

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JULY 1, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION-IGING MANAGEMENT PROGRAMS DISTRIBUTION:

HARDCOPY:

DLRRF E-MAIL:

PUBLIC [or NON-PUBLIC, if appropriate]

RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailRoom Resource N. Ferrer K. Green A. Stuyvenberg D. Wrona A. Wang M. Peck, RIV T. Brown, RI G. Miller, RIV N. OKeefe, RIV I. Couret, OPA V. Dricks, OPA W. Maier, RIV J. Weil, OCA E. Williamson, OGC S. Utlal, GOC R. Rihm, EDO

'.. ML101880765 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME SFigueroa NFerrer DWrona NFerrer DATE 7/12/10 7/14/10 7/15/10 7/22/10