UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 7, 2010 CAL No. 3-10-001 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
CLOSURE OF COMMITMENT NO. 1 OF CONFIRMATORY ACTION LETTER (CAL) No. 3-10-001
Dear Mr. Allen:
On June 23, 2010, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. 3-10-001 to FirstEnergy Nuclear Operating Company (FENOC) to confirm your commitments regarding the identification of control rod drive mechanism (CRDM) nozzle cracks in and reactor pressure boundary leakage from the reactor pressure vessel (RPV) head at the Davis-Besse Nuclear Power Station. These commitments were intended to provide additional assurance that, following your refueling outage which began on February 28, 2010, the plant would continue to operate safely following the return of the current RPV head to service.
As you initially documented in your June 11, 2010, letter to the NRC, one of the commitments in the CAL was that you would provide to the NRC, in writing, the results of the Re-Inspection Years (RIY) calculation for Operating Cycle 17, performed in accordance with American Society of Mechanical Engineers (ASME) Code Case N-729-1 based on calculated RPV head temperatures. This commitment was due to the NRC prior to plant restart (Mode 2).
We acknowledge that, as confirmed in your June 22, 2010, letter to us, we have received this information and that a copy of the calculation used to determine this information has been provided to the NRC Special Inspection Team currently onsite. The results of our review of the calculation will be documented in the Special Inspection Team inspection report, when it is issued following completion of the inspection.
We consider Commitment No. 1 of CAL No. 3-10-001, dated June 23, 2010, to be closed.
Commitments No. 2 through 4 remain open. You are reminded that, pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, you are required to: 1) notify the Region III Regional Administrator if for any reason you cannot complete the actions and commitments contained in the enclosure to our June 23, 2010, Confirmatory Action Letter (ML101740519) within the specified schedule and advise him in writing of your modified schedule in advance of the change; and 2) notify the same in writing when you have completed the actions and commitments addressed in the Confirmatory Action Letter.
B. Allen In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC website at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 cc: Distribution via List Serve
B. Allen In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC website at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 cc: Distribution via List Serve DISTRIBUTION:
See next page DOCUMENT NAME: G:\\1-Secy\\1-Work In Progress\\Davis Besse CAL Item 1 Closure Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME AGarmoe:cs JCameron SOrth DATE 07/06/10 07/07/10 07/07/10 OFFICIAL RECORD COPY
Letter to B. Allen from J. Cameron dated July 7, 2010
SUBJECT:
CLOSURE OF COMMITMENT NO. 1 OF CONFIRMATORY ACTION LETTER (CAL) No. 3-10-001 DISTRIBUTION:
Martin Virgilio OE Distribution RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn Viktoria Mitlyng Prema Chandrathil DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource