June 30, 2010 Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
DRAFT INTERIM STAFF GUIDANCE 6, DIGITAL INSTRUMENTATION AND CONTROLS LICENSING PROCESS
Dear Mr. Marion:
The purpose of this letter is to provide you with the final draft of Interim Staff Guidance (ISG)-6, Digital Instrumentation and Controls Licensing Process, for comment. Previous versions of the document have been discussed with members of your staff and other stakeholders at multiple public meetings. Additionally, by letter dated March 12, 2010 (Agencywide Documents Access and Management System Accession No. ML100780212), the Nuclear Energy Institute (NEI) submitted comments on behalf of the industry.
The enclosed draft document has been revised, as appropriate, to address your comments and incorporate the lessons learned from the Nuclear Regulatory Commissions (NRCs) recent review and approval of a digital instrumentation and control upgrade for the reactor protection system and engineered safety features actuation system at the Oconee Nuclear Station, and other recent licensing actions. Additionally, a comment resolution matrix is enclosed documenting the disposition of the NEI comments.
Although your comments on the draft ISG were previously received, discussed during the May 20, 2010 public meeting, and incorporated as appropriate, this letter provides a last opportunity to review the document to identify any areas where you feel the NRC staff should provide further clarifications to the guidance prior to issuance of the ISG. This letter is not intended to open discussion on the various issues that have already been identified and will be addressed via other processes outside development of the ISG. Instead, comments should be limited to where you think there is still ambiguity in how the NRC staff resolved a particular comment. In order to maintain the current schedule for issuance of the ISG in the fall of 2010, your comments are requested before July 16, 2010.
The NRC plans to pilot the new ISG-6 process once approved, and continued stakeholder feedback will be beneficial to our evaluation of the phased review concept and in evaluating the feasibility of this process. If you have any questions, please contact me at 301-415-1274.
Sincerely, MCunningham for/RA/
John A. Grobe, Deputy Director for Engineering and Corporate Support Office of Nuclear Reactor Regulation
Enclosures:
- 1. Draft ISG-6
- 2. Comment Resolution Matrix cc: See next page
A. Marion The NRC plans to pilot the new ISG-6 process once approved, and continued stakeholder feedback will be beneficial to our evaluation of the phased review concept and in evaluating the feasibility of this process. If you have any questions, please contact me at 301-415-1274.
Sincerely, MCunningham for/RA/
John A. Grobe, Deputy Director for Engineering and Corporate Support Office of Nuclear Reactor Regulation
Enclosures:
- 1. Draft ISG-6
- 2. Comment Resolution Matrix cc: See next page DISTRIBUTION SMorris WBurton KNguyen PUBLIC TBergman SBurrows RSydnor RidsNrrOd MCase DDesauliners MWaterman RidsNrrDpr SRichards BMarcus KScales RidsNrrDprPgcb LDudes EEagle DSydnor RidsOpaMail DSkeen HHamzehee SArndt RidsNrrDe IJung PRebstock RidsOgcMailCenter ELee GSingh RidsAcrsAcnw_MailCtr DHarrison LHardin MBailey MJunge TMossman ADAMS: ML101800160 NRR-106
- Via email OFFICE NRR/DORL/PM NRR/EEIB/TR NRR/DORL/LPL I-2/LA NRR/APOB/BC NAME GEMiller NCarte ABaxter
- LJames DATE 6/29/10 6/29/10 6/29/2010
- 6/30/10 OFFICE NRR/EEIB/BC NRR/DESC NAME WKemper JGrobe / MCunningham for DATE 6/29/10 6/30/10 OFFICIAL RECORD COPY
Nuclear Energy Institute Project No. 689 DI&C-ISG-06 and DI&C SC cc:
Mr. James Riley, Principal Engineer Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jhr@nei.org Mr. John Butler, Director Engineering & Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. Gordon Clefton, Senior Project Manager Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708\\
gac@nei.org Mr. Mitch Lucas mlucas3@luminant.com Mr. Rick Libra Rick.Libra@exeloncorp.com Amir Shahkarami Amir.Shahkarami@exeloncorp.com Mr. Rob Austin raustin@epri.com