ML101750353

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation (ISFSI) - Final Safety Analysis Report (FSAR) - Revision 19
ML101750353
Person / Time
Site: Surry, 07200002  Dominion icon.png
Issue date: 06/14/2010
From: Hartz L
Dominion, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
10-0271
Download: ML101750353 (2)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 14, 2010 United States Nuclear Regulatory Commission Serial No.:

10-0271 Attention: Document Control Desk NCM/EMM Washington, DC 20555-0001 Docket No.: 72-2 License No.: SNM-2501 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY INDEPENDENT SPENT FUEL STORAGE INSTALLATION FINAL SAFETY ANALYSIS REPORT - REVISION 19 Pursuant to 10 CFR 72.70, Dominion submits Revision 19 to the Final Safety Analysis Report (FSAR) for the Surry Independent Spent Fuel Storage Installation (ISFSI).

One CD-ROM is included in this submittal.

The CD-ROM is labeled "Surry ISFSI, Safety Analysis Report Revision 19, Docket No. 72-2, June 2010" and contains the following file:

Surry ISFSI_ SARRevision 19.pdf 15,380,480 bytes, publicly available.

Should you have any questions regarding this submittal, please contact Mr. Tom Szymanski at (804) 273-3065.

As a duly authorized officer of the Virginia Electric and Power Company, I hereby certify that the information given in the enclosed Revision 19 of the Surry ISFSI FSAR accurately presents changes that were made since the previous submittal.

Sincerely, Leslie N. Hart Vice President - Nuclear Support Services Enclosure Commitments made in this letter: None.

WOW__

COMMONWEALTH OF VIRGINIA

)

$1.

4 COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Leslie N. Hartz, who is Vice President - Nuclear Support Services, of Virginia Electric and Power Company. She has affirmed before me that she is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to e best of her knowledge and belief.

Acknowledged before me this /ý

-7day of a'AX*

_2010.

My Commission Expires:

3.,*.20

/V.. -.

/

Notary Public

Serial No.: 10-0271 Docket No.: 72-2

Subject:

Submittal of SPS ISFSI FSAR Revision 19 Page 2 of 2 cc:

U.S. Nuclear Regulatory Commission (w/ one CD-ROM copy)

Region II 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, GA 30303-1257 Director, Spent Fuel Project Office (w/ one CD-ROM copy)

Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ms. K. R. Cotton (w/ one CD-ROM copy)

NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector (w/ one CD-ROM copy)

Surry Power Station