Category:Letter
MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23132A0472023-05-12012 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23130A0072023-05-10010 May 2023 Submittal of Core Operating Limits Report Cycle 24, Rev. 16 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23118A0202023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23095A1292023-04-0505 April 2023 Steam Generator Tube Inspection Report for Refueling Outage 23 ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2024-02-02
[Table view] Category:Notice of Violation
MONTHYEARML14105A3382014-05-0101 May 2014 Sliv Notice of Violation IR 05000456/20130082013-11-14014 November 2013 IR 05000456-13-008; 050000457-13-008; 09/09/2013 - 10/29/2013; Braidwood Station, Inservice Inspection ML12314A0832012-11-0808 November 2012 Nuclear Regulatory Commission Integrated Inspection Report 05000456-12-004; 05000457-12-004 and Notice of Violation IR 05000456/20120082012-09-24024 September 2012 IR 05000456-12-008, 05000457-12-008; 07/25/2012 ?09/07/2012; Braidwood Station, Units 1 and 2; Routine Triennial Fire Protection Baseline Inspection and Notice of Violation ML12269A1882012-09-24024 September 2012 IR 05000456-12-008, 05000457-12-008; 07/25/2012 ?09/07/2012; Braidwood Station, Units 1 and 2; Routine Triennial Fire Protection Baseline Inspection and Notice of Violation ML1106009032011-02-28028 February 2011 IR 05000456-10-503, 05000457-10-503; on 06/16/2010 - 02/10/2011; Braidwood Station, Units 1 & 2; Results of NRC Emergency Action Level and Emergency Plan Changes Inspection and Follow-up of Unresolved Item 05000456-09-005-07; 05000457-09-00 IR 05000456/20100082010-02-25025 February 2010 EA-09-259, Braidwood Nuclear Power Station, Unit 1, Final Significance Determination for a White Finding; Notification of Follow-up Assessment; and Notice of Violation; NRC Inspection Report No. 05000456/2010008 ML0712201272007-05-0101 May 2007 IA-07-015, Hess, Notice of Violation IR 05000456/20060122006-06-29029 June 2006 EA-06-081, Braidwood Nuclear Power Plant, Units 1 and 2; Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report Nos. 05000456/2006012; 05000457/2006012) ML0618100132006-06-29029 June 2006 EA-06-081, Braidwood Nuclear Power Plant, Units 1 and 2; Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report Nos. 05000456/2006012; 05000457/2006012) ML0610107442005-12-19019 December 2005 NRC E-mail from Steven Orth to Braidwood Communications Team Bwd IEPA Violation ML0610107002005-12-16016 December 2005 Illinois Environmental Protection Agency Ltr to Exelon - Violation Notice W-2005-00537 ML1017302052005-12-16016 December 2005 Ltr from M. Garretson to J. Petro Violation Notice Exelon Generation - Braidwood Station Violation Notice No. W-2005-00537 IR 05000456/20020032002-07-23023 July 2002 IR 05000456-02-003, IR 05000457-02-003, on 02/04/2002 -02/22/2002, Braidwood Station Units 1 & 2. NOV - Final Significance Determination for White Finding 2014-05-01
[Table view] |
Text
t. -.
RECEIVIM 12/16/2005 14:49 DEC-16-2005 lI"14 11"I'MC:
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
/" )$IIJI0* Ntwxtf QCKAO CGMrt*,Et AVEN 100 P.O, EAST, Box 19276, spiNCC#Io, Iu.iozol 62794-9276 - ( 21 7782-3397 R. TP,O*H'FON WEv~r RA o0J1.t*,'suTf I 1-3t,30, CHa sGQ.* iL 60601 -(131 ) 81 4-6026" Roo R. LAGOIaimcm, GO'ErNOit DOUGLAS P. SCOTt, DIREcrOR 21,Yi785-0561 fet - rP rDib-*-16"2 005 ? CERTIMMED MAIL # 7004 2510 0001 864S 9027 RETUIKN RECEIPT REQUE3TED Exeloi Generation - Braidwood Attn: John Petro RR I Box 84 Bravcville, IL 60407 Re- Violation Notice: EXELON GENERATION - BRAIWWOOD STATION Viaation Notice Nao.: W-ZOOS-00537 D'ea Mr. John Petro:
This constitmles a Violation Notice pxt suaot to Section ^1 (a)()) of the Illinois Evironriental, Protection Act, 415 ILCS 5131 (a)(1). and is based upon review of available information and investigation'by representatives of the Illinois Enviiomucntai Piocction Ageaoy ("Illinois EPA").
The Illinois 'PAlaereby provide notice of"violadans of cvironmental statutes, regulations or permits as set forth in Attachlment A to this letter. Arttchment A lftcludes an expiarition of the activities that the Illinois EPA believes mayrtsolve the specified violations. includjig an estiuare of
- a. reasonnbla time period to complete the necessary activities. However, due -to the nature and
( seriousness of the violations cited, please be advised th-wt resolution of the violations my aiso require the involvament ofe. prosecutorial authoxity forprposes thft may include, omong others, 4he impogition of stalntory penaltieS.
'A written response, which may include a rquest for Ameeting with representatives of the Illinois E
BPA. muit be aubau tted via ceatified mail to the Ii4ois EPA within 45 days ofreccipt of this letter.
The response mustaddress each výilation specified in Atuwlhnont A and include for e.ch, an explanation of the activities that will be implementedabd ndi time schtcdWe for the completion of each activity. Alxo,if a pollution prevcntion activity will be implemented, indicate that intntion in any Written response. The written response will constitute a pmoposet Compliance Commnitrment Agretmemrt ("CCA") pursuant to Section 31 of the Acr The Illinois EPA will review the proposed CCA a-d will accept or rejectte proposal witidn 0 day3 of rcc.ipt.
Ifa timely written response to thbs Violation Notice is not provided, it shall be considered a waiver of the opportuniey to Mspond and meet, and the Illinois EPA uwy pteceed with a referral to tie prosecutotial athority.
Rotwi 0. 430z Noah1 maIin 54.it. RGCW04. 'L61¶a V _4#191997.776 - DOc?%,AlvgW 1 W. tirrigop 9t.. D&SPblaimt. IL.0016 -164P) 294-1000
- ,- -. USiSouthW*A.-ollI,. 6123 -e13IM16004h3 1 Pmim, -*3-11$N. UnivvilbvUi, Foa. IL6161 ,- 01ihi91-4*3
- i.,m, piam - nD.univenhy St. Pttta,. i. 6614 - 6306943-954118 CK*-0A*,V.i-2 .adPZnI*5oin . Ct*IlMP41. It,L(186-20-12311-.38 41005. Suielh
-Stmm~m~o $SaemRd, flvriq~kid, Ia-62706++ .21T176f t +* C:.i4Vltt - M i1 S *olI$V~Ie, N, *)A- ibs 34,-3)20
(
RECEIVED 12/16/2095 14:49 2se2aof 2
( - JIXELON GENERATION VN W-2005-00537
- DRAIDWOOD STATIONr Written cominmuications should bi; diructod'o SEVERLY BOOKER at the ILLINOIS EPA, BTUMAU 0? WATER~, CAS #19, P'.O. 3OX 19276', SPRINGFIELD. ILLINOIS 62794-92705. All commiunications rnuis include VCIevenCcc to this Violatioa Notice numnber, W-1005-00337.
Questons reetar~diish~ Violation Notice should be ditectrd to Gaxy.Eo~cse at 21 7Y185-056-1.
Sincecrely, Michael S. Garretson, Mvanager Compliance Amusure Section B~urcau of Water Attachmenut cc- Mr-lbuxg., PaS bcc: Gary Fcorsee/02 File Beverl~y Booker Dave M~cMillan. PWS
- Elgin Region, PWS Connie Tonsor, D)LC Chuck~ Gunnerson, DLC
- Terri LeMas ters, *PWS Marcia Wili1hite
RECEIVED 12/1612005 14;493 P.04/135 MC-16-2005 11*15 PAGE NO. i 0' _2 ATTACHMENT A EXELON GNE*RATION - SRAZDWOOD STATIOM, VZOLARZXON NOTICE NO- W-2005-00537:
Questions regarding the violationa identified in this attachment should be referred to Gary Forsee at (217) 785-0561.
A raVtew of information available to the Illinois EPA indicates the following violation-a of statutes, regulationts, or permits. Included with coch type of
.violation is an explanation of the activities that the Illinois EPA believes may resolve the violation including an estimated time period for resol~tion.
Grounwatew= Q*uait-y go person shall cause, .threaten, Or allow the release of any contaminant'to"a resource grQlndwatar Such.that treatment or additional treatment is necessary to continue an ex$sting use or to assure a potential use of such groundwater, or such that the, existing or potentiaL use of such groundwater is.precluded.
exalon Generation - Braidwood station must dease and decease of any further violations of the Act.
ViolhLAon Violatiaon
'___ae Deqe-i2tion 1L2/12/05 Sampling zveulto indicate violations of Section 12 of the Act, the General Prohibition Against Use Impairment of Resource Groundwater,. 7and--the-_.causing of the groundwater qualiry standard of tritiu* (/20,000 pCi/t-*0 be enceeded during the time period
~
andandat thXq nated bela:
-tte~gqt.on-W.s--des-i blW
, RW-2 RW 10.5 ft. depth ZQ,5 ft. depth 58,621 pCi/L 170,02& pCi/L, I ýj~ (rljl 5.*
WeW RW-2 25 ft. depth 223,888 pCi/L ý,jv(f el Rule/Req. Section 12(a), and.-(d)' of the Act, 45 J:LCS 5/12, 3 11ll. Adm,.
Code 620.115, 35 11i. Adm, Code 620,301(a) (1) and (2), and 35 Ill. Adm. Code 626.10(e)(3).
12107/05 Sampling results indicate violations o0 Section 12 of the Act.
the General -Prohibition Against Use Impairment Resource Gro4ndwater during the time period and at. the of location (a) designatod below:
Private well located, at horse barn North of polio 1,151 pCI/I.
Rule/RC-. Section 12(a)", and (d) of the Act, 415 TLCS 5/12, 35 1I'1. Adm.
Code 620.1iS, and 35 I1., Adm. Code 620.30.1(a) (1) and (2).
C
RtCEIVED 12,115/2005 14:49 8 DeC-16-2005 1L: 15 9.05/05 PAGE: NO. 2OF 2 ATTACA$MWNT A~
~LNGz~aM1CJTI? - ElAXW~oOD S7TAZON, VZOL&TZ0N NOTt~g No. W-2c05-00S37:
( V10lation Violat~ion
-Datm Descript-ion-V/061-0 SampJ-ng resu~lts. indicate violations ef Sectlon the~enx~jProhibition A~gai.nst I?~ of thie Act, Use mpakzrnentof eoue Groundiwater, and the causing of the qroundwater quality standard Of tritium~ (20,00'0 pCI/L] to be exceededi during the timei peripd and at the lo.Cation(sJ desj~qmakj below:
VB-3-3 4 3, a9,q PCi/L05'4-61 VS-3--2 32r 830 PCi/t1 V~--6 53 5712 PCi/L Rule/Reg. -section 12 ~), andc .d) of thle Act, 4Z5 Coda 620.2.15, 35 111-. Adm~. Code 6 2 0O301ILCS 5/12, 35 Ill. Aftr.
(a)(1 and (2), and 35
- i11. Admi. Code 620.410(e) (3).
12/01/05 Sampling results ind~icate violations the General Pr~ohibition Against useof Sa~titj 12 of the Act, Impairmlent Of ResoArce Groundwater ducing thc time period and at the .loqationlfs) d~es.ignated below:
Pond iocatedl just nlorth of Sm1iieY R4 'and west of tha 2,.347 ~i/
( Rulefmg, SectiOi 12(a), (d), and (f) of 2,464 PCI/L
,the Act, 415 ILC.S 5/12.
Tnfral TOTAL P.05 a r~ic I